Géraldine COUDERT
Head of Process and Flow Assurance Department at DORiS- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Français -
-
Anglais -
Topline Score
Bio
Experience
-
DORIS
-
United States
-
Oil and Gas
-
100 - 200 Employee
-
Head of Process and Flow Assurance Department
-
Feb 2021 - Present
Responsible of Process and Flow Assurance department. Responsible of Process and Flow Assurance department.
-
-
-
DORIS Group
-
France
-
Engineering Services
-
200 - 300 Employee
-
Flow Assurance Senior Engineer
-
Jun 2007 - Present
Flow Assurance Lead engineer with 14 years of professional experience in offshore oil and gas, for greenfield and brownfield developments projects, having been involved in Conceptual studies, Basic Engineering (FEED) and Detailed Engineering.Projects: Shtokman, GirRI, Moho Phase 1bis, Zinia, Egina, Sanaga, R&D (Fit For Purpose project), Absheron, SP11, EACOP, Tempa Rossa
-
-
Head of Flow Assurance Department
-
Nov 2013 - Present
Responsible of Flow Assurance department.
-
-
Flow Assurance Engineer
-
Oct 2003 - Feb 2008
In charge of all Flow Assurance analysis using OLGA software during Conceptual studies and Basic Engineering (FEED).Projects: AKPO, Diga-Batanga, Olende-Fernan Vaz, Moho Bilondo, USAN, Egina, Gulf of Mexico
-
-
Process Engineer
-
Jan 2002 - Oct 2003
In charge of Process analysis during Basic (FEED) and Detailed Engeneering.Projects: BONGKOT, TUNU, South Pars
-
-
-
TotalEnergies
-
France
-
Oil and Gas
-
700 & Above Employee
-
Flow Assurance Engineer
-
Sep 2010 - May 2012
GirRI for Girassol Resources Initiatives – MPP – TOTAL (Angola) In charge of technical studies and Call for Tender documents preparation. Responsible for Flow Assurance Technical clarifications during tendering phase, scope of works definition to be performed during Detailed Engineering and follow-up of all Flow Assurance activities during early Detailed Engineering phase. GirRI for Girassol Resources Initiatives – MPP – TOTAL (Angola) In charge of technical studies and Call for Tender documents preparation. Responsible for Flow Assurance Technical clarifications during tendering phase, scope of works definition to be performed during Detailed Engineering and follow-up of all Flow Assurance activities during early Detailed Engineering phase.
-
-
-
TotalEnergies
-
France
-
Oil and Gas
-
700 & Above Employee
-
Flow Assurance Engineer
-
May 2007 - Nov 2007
Aguada Pichana North Phase 2 Project – TOTAL (Argentina) In charge of all Flow Assurance analysis using OLGA software. Aguada Pichana North Phase 2 Project – TOTAL (Argentina) In charge of all Flow Assurance analysis using OLGA software.
-
-
Education
-
Ecole Nationale Supérieure des Ingénieurs en Arts Chimiques et Technologiques
Diplôme d'ingénieur, Génie des procédés