Fırat Atalay

Technical Office Manager at Hitit Mobilya San.Tic.Ltd.Sti
  • Claim this Profile
Contact Information
Location
Serbia, RS
Languages
  • English Full professional proficiency
  • Russian Limited working proficiency
  • Turkish Native or bilingual proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Türkiye
    • Furniture and Home Furnishings Manufacturing
    • 1 - 100 Employee
    • Technical Office Manager
      • Dec 2020 - Present

      Kula Tower Belgrade Waterfront Kula Tower Belgrade Waterfront

    • France
    • Environmental Services
    • 1 - 100 Employee
    • Technical Office Executive
      • Apr 2019 - Jul 2020

    • Technical Office Engineer
      • Sep 2017 - Mar 2019

    • Türkiye
    • Construction
    • 700 & Above Employee
    • Technical Office Engineer
      • Sep 2015 - Sep 2017
    • Russian Federation
    • 1 - 100 Employee
    • Technical Office Engineer
      • Jun 2013 - Sep 2015

      Project Name: St. Petersburg Western High Speed Diameter Project (Russia-St. Petersburg)_Project Value: 2,2 Billion Euro Western High-Speed Diameter (WHSD) is a unique high-speed urban motorway being built in St. Petersburg- Russia. The Project includes 2 cable stayed bridges, open-cut tunnel, heavy lifting and launching steel bridge production. The project will take place under the circumstances using over sea constructions, temporary bridges and technological platforms. Duty: Define the project's goals and objectives; create and maintain a project's budget and schedule, analyses progress reported against the work schedules; and recommend actions to improve progress. Preparation of contracts and all related annexes, preparation and control of payment documentations, coordination of correspondences, preparation of contract related deliverables, technical proposals, project coordination and meetings with consultant (COWI) and client (NCH-Northern Capital Highways). Preparation of Project Schedule and coordination of construction activities on Construction Schedule. Relation with subcontractors and suppliers, contract and payments management. Project 3D visualization of civil and architectural details and modeling. Formwork shop drawing provision for complex reinforced concrete structures. Show less

    • Saudi Arabia
    • Construction
    • 700 & Above Employee
    • Deputy Construction Manager
      • Feb 2012 - Feb 2013

      Project Name: Jeddah Stormwater Drainage Project - Permanent Works (Saudi Arabia-Jeddah)_Project Value: 320 Million USDThe Jeddah Governorate is located on the Red Sea coastal plain and receives rainfall runoff from the foothills to the east through natural drainage pathways valleys. During intense rainfall events, runoff causes flooding in the urban areas of the coastal plain.Under the contract 5 earth dam with concrete upstream and concrete spillways and their sub channels is constructed to improve the flood protection systems for the City of Jeddah. Duty: In the GHAIA Dam and Reinforced Concrete Subchannel (where the ARAMCO is the Client and AECOM is the consultant), directing all construction activities according to ARAMCO and American Standards, and IFC Drawings. Providing coordination of site activities with the client and the consultant. Directing the preparation of quality and technical documents with the technical office and project coordination of QA/QC department. Show less

    • Project Coordination & Technical Office Engineer
      • Aug 2011 - Feb 2012

      Project Name: Jeddah Stormwater Drainage Project - Urgent Works (Saudi Arabia-Jeddah) Project Value: 250 Million USDUpgrading and repairing of the trunk storm water network at 12 locations within the city of Jeddah. Project requires major traffic management schemes at each of the 12 sites, many of which are located at major interchanges. Project completion period is a challenging 110 days.Duty: In the Jeddah Stormwater Drainage Project-Urgent Works (where the ARAMCO is the Client and AECOM is the consultant), providing coordination between the construction site and management office. Coordinate meetings related with technical and contractual correspondence with the client and consultant. Preparation of method statements, technical reports, request for technical approvals, technical proposals, and contractual project deliverables and progress reports (general project management). Following construction activities according to project specifications (ARAMCO and American Standards, and IFC Drawings). Preparation of the agreements and technical attachments for the subcontractors. Show less

    • Project Engineer - Technical Office
      • Oct 2010 - Jul 2011

      Duties : Controlling and correcting of the main drawings and shop-drawings, preparation of Bill of Quantities, monthly progress reports, cost estimation (and analyses) and work schedules of dams, hydro power plants, access roads and overpass bridges. Preparation of feasibility reports of hydroelectricity power plants. Technical design calculations of the hydraulic structures. Duties : Controlling and correcting of the main drawings and shop-drawings, preparation of Bill of Quantities, monthly progress reports, cost estimation (and analyses) and work schedules of dams, hydro power plants, access roads and overpass bridges. Preparation of feasibility reports of hydroelectricity power plants. Technical design calculations of the hydraulic structures.

    • Türkiye
    • Civil Engineering
    • 100 - 200 Employee
    • Project Engineer (Consultant)
      • Mar 2010 - Aug 2010

      Project Name : Third East-West Highway Project (Georgia - Gori) Duty : Preparation of interim payment certificates, invoices, BoQ preparation, following correspondence and coordination, controlling of interim payment certificates of contractors, preparation of monthly progress reports and related technical office reports as consultant under the project called “Third East-West Highway Project” which TEMELSU is the consultant of the World Bank. Project includes reinforced concrete highway, tunnel construction, tunnel rehabilitation, and viaduct construction and overpass bridges. Show less

    • Türkiye
    • Civil Engineering
    • 1 - 100 Employee
    • Project Engineer - Technical Office
      • Jun 2009 - Sep 2009

      Duties: Preparation and controlling of the shop-drawings of dams, hydroelectric power plants, access roads and overpass bridges. Coordination with construction site related with design issues. Duties: Preparation and controlling of the shop-drawings of dams, hydroelectric power plants, access roads and overpass bridges. Coordination with construction site related with design issues.

Education

  • Orta Doğu Teknik Üniversitesi
    Bachelor's Degree, Civil Engineering
    2003 - 2009

Community

You need to have a working account to view this content. Click here to join now