Furqan Hameed

QA Coordinator at Medical Devices (Pvt) Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Sialkot District, Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Medical Equipment Manufacturing
    • 1 - 100 Employee
    • QA Coordinator
      • Oct 2020 - Present

       Maintains and improves product quality by completing product, company, system, compliance, and surveillance audits; investigating customer complaints and QMS  Prepares quality documentation and reports by collecting, analyzing, and summarizing information and trends including failed processes, corrective actions, and re-validations  Label Management, Calibration, Non-conformance, and CAPA Management  Understanding of Cleanroom Protocols, Sterile Packaging, and Sterilization  Understanding of DMR, DHR, DHF, and Technical files.  Management and supervision of the quality (QA) team, get timely information, evaluate work of the quality team, provide training where required.  To evaluate the work of the quality team, approve the work, and report to the Quality Manager.  Development of process flow charts and travels cards  Performed internal calibration to ensure smooth working of instruments in the company Show less

    • Academic Writer
      • May 2021 - Present
    • Pakistan
    • Medical Equipment Manufacturing
    • Product Manager
      • Jan 2019 - Oct 2020

      >Developed S.O.P's of machine Operating and maintenance to ensure safe working of all machines >Prepared maintenance procedure and schedule of machines, Wirecut, Machining Center, Press, Milling including Broaching Machine, Manual Lathe, Electroplating, Sand blast, grinding machines, and Strap machine etc. >Decreased Monthly & Seasonal Downtime from 50% to 25% by tracking and eliminating potential issues beforehand >Increased Production of 15% of Wirecut machine by adjusting adequate speed of machine >Introduced Kaizen culture and continuous improvement concepts to the maintenance team and submitted 15 Kaizen within 3 months with maintenance team >Training of Machine operators on performing basic maintenance which causes decreasing potential downtime and machine breakdowns >Eliminated multiple overhead operations by using Specialized Jigs on Wirecut >Worked on the budgeting of machine parts on the ERP based system to maintain record. >Shifted parts inventory record to ERP Show less

    • Wholesale Import and Export
    • 1 - 100 Employee
    • Mechanical Engineer
      • Feb 2017 - Dec 2018

      > Planning, organizing and executing machine preventive maintenance schedule > Inspecting parts and maintaining cost-effective machine parts inventory > Automation of manual processes to increase efficiency > Training of maintenance team on performing maintenance of Automatic Printing Machines > Increased Accuracy and reduction in wastage of Hot Webbing Cutting Machines by re-calibrating their encoders. > Research on common sewing problems and implement their cost effective solution > Reduction in SMV/SAM by shifting operations to automated machines or by combining multiple operations on specialized machines > Preparing Overall Equipment Efficiency and Downtime Tracking report to assess potential bottlenecks in production Show less

    • Draftsman
      • Sep 2016 - Dec 2016

      > Study plans for upcoming generation of trailer models, and develop strategies for improving upon current models > Design products using CAD, and consult with engineering and manufacturing teammates to ensure that designs are feasible > Develop and build prototypes and run tests to measure their level of function > Record and evaluate testing data, altering designs as necessary to bring them to safety, performance and efficiency standards > Consult with fabrication teams during product manufacturing, advising them on design specifications and providing physical assistance when required > Research competitor products quarterly and collaborate with product development team to generate ideas for making our products the best ones on the market > Calculate cost estimates for final product designs, and release reports to supervisors, incorporating costs of labor, material, delivery and overhead > Attend weekly team meetings to provide progress reports, obtain updates on colleagues’ progress, strategize on steps for following week and acquire information about projected emerging product lines Show less

    • Pakistan
    • Apparel & Fashion
    • 1 - 100 Employee
    • QC/QA Assistant
      • Jul 2015 - Aug 2016

      > Conducting a management review meeting (MRM) > Customer complaints handling and customer communication >Process improvement through Lean-Six Sigma Tools >Performance analysis of production teams based on quality objectives >Conducting a training needs analysis and employee training > Implementation and Continuous Monitoring of QMS > Production Coordination, > Implementation of Lean Production System > Time Study of Articles and Set Production Targets > Layout Setups and Line Balancing > Implementation of Quality Control Methods > Development of New Samples Show less

    • Pakistan
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
      • May 2015 - Jun 2015

      I've done following Projects:> Dent Doors Analysis.> Increase Productivity on Refrigerator Assembly Line Through Time Study (Line Balancing).> Optimum Design of Door Delivery Trolley.> Work on Reduction of Risk & Hazards

      • May 2015 - Jun 2015

      Best Project Participant Summer Internship Program at PEL

    • Trainee Engineer
      • Mar 2015 - May 2015

      I've done Following Project there. > Reduction of setting Time through KARMA Machine. > Reduction of Wastage of Sheets. > Reduction in Setting Time of Die Setting. I've done Following Project there. > Reduction of setting Time through KARMA Machine. > Reduction of Wastage of Sheets. > Reduction in Setting Time of Die Setting.

    • Assistant Project Engineer
      • Mar 2014 - Apr 2014

      Take a look about our project and guide the worker on the right way to complete our project. Take a look about our project and guide the worker on the right way to complete our project.

Education

  • University of Gujrat
    BS Mechanical Engineering Technology, Mechanical Engineering
    2011 - 2015
  • university of gujrat
    Bachelor’s Degree, Mechanical Engineering
    2011 - 2015
  • Punjab College Gujranwala
    Intermediate, Pre-Engineering
    2008 - 2010
  • Dar-e-Arqam
    High School, Mathematics and Computer Science
    2006 - 2008

Community

You need to have a working account to view this content. Click here to join now