Friedrich Lee

Launch Management at Beijing Benz Automotive Co., Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Daxing District, Beijing, China, CN
Languages
  • English Professional working proficiency
  • Japanese Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • China
    • Motor Vehicle Manufacturing
    • 100 - 200 Employee
    • Launch Management
      • Jan 2015 - Present

      1).Assist senior manager to deal with daily work; arrange and prepare all relevant E/Q-level checks with Body and Assembly shop. 2).Track and implement all the timelines that the leader arranged. 3).Arrange and coordinate meetings inside and outside BBAC that SM has to moderate, prepare related documents, complete meeting minutes. 4).Ensure the availability of parts for new ramp ups in teamwork and interface with Material Control and PP/Hub. 5).Take over responsibility for local parts ordering and transfer to Deutscland. 6).Maintain IT pre series SAP tool and being responsible for all Master Data input. Show less

    • United States
    • Automotive
    • 700 & Above Employee
    • Launch Coordinator
      • Apr 2013 - Jan 2015

      1. The new projects implementation coordination in Fangshan plant with Technical Centers cooperation2. Tracking the components stock level for MQ2, validation and all builds before SOP3. Organize all necessary plant resources (operators and engineers) for each build before SOP4. Organize the access to the production lines for each build before project SOP5. Track the operations budget with focus on components and logistic cost6. Coordination of all plant departments for project launch activity7. Timing and status tracking for the Design Change implementation for launching projects8. Cooperate with Finance in term of AR spending tracking and budget booking9. Saving & cost avoidance initiatives;10. SAP initial data preparation and plan the operation budget in SAP11. Create the local team launch plan and monitoring the targets achievement12. Monitoring the FTQ, OE and Productivity targets and make correction plans with the respective Customer Project Managers.13. The new project implementation reports preparation14. Assurance that knowledge and all lesson learn from Tech Centers are properly implemented on production process15. Assurance that all process and machines documentation is prepared and transferred from Tech Centers16. Attendance in PDP gates for launched projects17. Support the customer audits and visits Show less

    • Quality Engineer
      • Apr 2012 - Apr 2013

      1. Maintain plant quality system and drive continuous improvement2. Customer quality and internal scrap reduction3. Cost reduction programs, productivity improvements, and the implementation of initiatives to align with business goals.4. Provide vision, direction, and leadership for the formulation and implementation of customer quality and site process improvements5. Develop a strong working relationship with customers and key suppliers and diligently work with them to improve quality6. Accurately report the quality performance metrics 7. Be very responsive to the customer on all questions and concerns8. Thorough understanding of quality systems and requirements9. Obtain and maintain ISO/TS 16949 certification10. Ability to review First Time Through (FTT) and scrap information and introduce permanent resolutions11. Problem resolution using problem solving skills including 8D, Shainin and Six Sigma12. Ability to prepare new part certification submission to customer13. Prepare and update all quality documentation including control plans, PFMEA, Process Flow Diagram (PFD), Work Instructions, Quality Reports, Alerts, Rework Procedures, etc.14. Develop Statistical Process Control (SPC) and react to the results15. Manage gage calibration system and be able to complete gage studies16. Auditing production activities to ensure compliance to the quality system17. Analyze warranty returns and make recommendations to control and fix issues18. Understand and improve our current contamination controls and testing process Show less

Community

You need to have a working account to view this content. Click here to join now