Frankline Kimeu
Ag Plant Manager-Umoja Preform Plant at Nairobi Bottlers Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Credentials
-
Project Planing and Execution
FranklinCoveyFeb, 2017- Nov, 2024 -
Maintenance of Injection Molding Machines
Husky Injection Molding SystemsMay, 2016- Nov, 2024 -
Principles of Injection Molding
Husky Injection Molding SystemsOct, 2015- Nov, 2024 -
Green Belt OE certification
Operational Excellence (OPEX) Group
Experience
-
Nairobi Bottlers Limited
-
Kenya
-
International Trade and Development
-
200 - 300 Employee
-
Ag Plant Manager-Umoja Preform Plant
-
Nov 2022 - Present
Manufacture of Preforms for variety of bottle blowing.
-
-
Continous improvement Admnistrator
-
Jan 2014 - Present
Industrial Loss/ wastes Elimination through Total Production Management (T.P.M) and Operational Excellence (OE) tools.
-
-
Intern Nairobi Bottlers limited
-
Sep 2013 - Jan 2014
Loss reduction using TPM tools
-
-
-
Nairobi Bottlers Limited-
-
NAIROBI
-
UNIT MANAGER- PACKAGING
-
Jul 2018 - Present
1. MACHINE AVAILABILITY AND ASSET CARE 2. PEOPLE MANAGEMENT 3. QUALITY MANAGEMENT 4. COST MANAGEMENT 5. SAFETY AND SUSTAINABILITY 1. MACHINE AVAILABILITY AND ASSET CARE 2. PEOPLE MANAGEMENT 3. QUALITY MANAGEMENT 4. COST MANAGEMENT 5. SAFETY AND SUSTAINABILITY
-
-
-
NAIROBI BOTTLERS LTD
-
NBL PREFORM PLANT, KANGUNDO ROAD, NAIROBI KENYA
-
PLANT MAINTENANCE ENGINEER
-
Oct 2015 - Present
1. Preventive Maintenance 2. Corrective maintenance 3.Engineering planning through SAP PM Module 4. Implementation Total Productive Maintenance (autonomous maintenance (AM), 5S, preventive maintenance ( PM) ensuring that standard operating procedure (SOPs) and one point lessons (OPLs) are developed, Maintained and Implemented 5.Planned maintenance stoppages agreed with production planner (co-ordinate maintenance down time with production times) . 6. Keeps abreast of all relevant latest technology developments and equipment upgrades. 7. Manages equipment upgrades to latest technology 8.All ancillary systems and processes (eg spares, tooling, training,) updated as required according to change control procedures. 9.Continuously Improved (Optimized) Plant, Process Equipment and Systems . 10. Root cause analyses carried out on breakdowns. 11. Cost control on engineering projects, engineering inventory value and usage. Show less
-
-
Education
-
Technical University of Kenya
Bachelor of Engineering- Electrical and Electronics, Control Engineering