Frank Melter

Electrical Project Manager at Fusion Industries, LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tecumseh, Oklahoma, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Project Manager
      • May 2015 - Present

      - Manage all financial aspects of project - Assist and Support Engineering Design – Power Distribution - Design Facility conversion (Load Side) - Develop project plan and schedule (MS Project) - Negotiate and resolve Customer concerns - EDS (Electrical Distribution System) Power Infrastructure Inspection Program - Develop Inspection Plan EDS Infrastructure - Generate Electrical Proposal, Agreements Example Projects: - Pecos, TX - 138kV/24.9kV 20MVA 2 Bay Substation - 16.5 Miles 795 ACSR 24.9kV Power Distribution Infrastructure - Pad Electrification - (8) 1000kVA PMT Service - (5) 500KVA PMT Service - (5) 300kVA Pole Mount Service - (5) 225kVA Pole Mount Service - (2) 112.5kVA Pole Mount Service - (1) 75kVA Pole Mount Service - Culberson County, TX - Arc Flash Analysis/Labeling - SKM Power Tools - (155) Gas, Compressor Station, SWD’s And Stabilizer Plants - Power Line Modeling/Coordination - Milsoft Utility - 80+ Miles - Multiple Power Line Distribution and Secondary Service Projects - Multiple Battery, SWD and Compressor Facility Construction Projects Show less

    • United States
    • Oil and Gas
    • 400 - 500 Employee
    • Maintenance Planning Supervisor
      • Apr 2012 - May 2015

      Implement SD Asset Maintenance Management Program for Oil/Gas Production Electrical Infrastructure - Set Up CMMS for Asset Maintenance Management - Implement & Manage Facility Infrastructure Electrical PM/PMF Programs - Develop & Implement Asset Reclamation Program - Develop & Implement Distribution PME/Substation Preventive Maintenance - Plan and Schedule Distribution PME/Substation Repair Findings - Manage SWD Facility/Gas Lift, ESP & Rod Pump Production Maintenance - Production/SWD Facility Lightning Protection/Tank Battery Grounding Design/Install - Distribution Storm Damage Response/Repair Plan - ESP Downsize & ESP/Rod Pump Conversion Program Planning & Scheduling - Electrical Invoice Capital and Expense Coding/Approval - Assist in the Implementation of a “Call Out” Repair Dispatching Process - Set Up Contractor to Manage Pump Skid PM Program in MAXIMO - Planned and Scheduled Rod Pump Conversion Design Retrofit and Assisted in the Design Process - Work with Design Team to Develop Plan and MS Project GANTT for Substation Upgrade Projects - Develop and Manage Electrical Infrastructure UD Junction/Pole/Pad Mount Transformer Labeling Program Show less

    • Oil and Gas
    • 700 & Above Employee
    • Maintenance Planner/Scheduler
      • Jan 1992 - Apr 2012

      - Primary CMMS Administrator – MAXIMO, Responsible for managing system data. - Develop maintenance procedures and preventive maintenance plans for new equipment installations (OEM recommendations vs condition based maintenance). - Enhance existing equipment PDM and PM plans as defined by and in participation of Root Cause Failure Analysis (RCFA), Management of Change (MOC) and Reliability Centered Maintenance (RCM) initiatives. - Advise and facilitate PM Optimization Process for all critical equipment evaluating equipment breakdown history and detailed equipment data to identify shortcomings in efforts to enhance equipment reliability. - Review and evaluate corrective work orders, identify parts and/or repair requirements and kit as necessary for planned downtime events. - Develop equipment lubrication identification and labeling initiative and planned integration. - Develop and maintain annual shutdown schedule. - Develop equipment outage activity plan (MS Project GANTT) for major shutdowns – Average >50/Year. Show less

    • Construction Electrician
      • Jul 1981 - Jul 1991

      - Project Planner and Lead Construction Electrician for Multiple Projects - Quality Control Inspector (Multiple Projects) - Project Planner and Lead Construction Electrician for Multiple Projects - Quality Control Inspector (Multiple Projects)

Community

You need to have a working account to view this content. Click here to join now