FRANK GERALD DUMO

FIELD ENGINEER at TESTPRO PTE. LTD. SGP (PHILIPPINE REP)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Central Luzon, Philippines, PH

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Singapore
    • Semiconductor Manufacturing
    • 1 - 100 Employee
    • FIELD ENGINEER
      • Jun 2008 - Present

      Sole distributor of NHK Microcontactor and Probecards.Stationed at Texas Instruments Clark Philippines

    • FSE
      • 2008 - 2011

    • JUNIOR EQUIPMENT TECHNICIAN
      • May 2007 - Jun 2008

      DELTA – CONTAQ MASTER’S CO. ( May 2007 – Feb. 2008 ) Position: Junior Equipment Technician ( DELTA CASTLE / TURBO CASTLE ) Primary Functions: 1.Responsible for performing electronics, electrical or mechanical troubleshooting to determine problems in non-functioning electromechanical equipment used in the manufacturing process. 2. Target Maintenance 3.Maintenance data monitoring. 4. On-line handler repairs and maintenance. 5. Daily tracking on the machine performance to monitor equipment efficiency. 6. Relocation of handlers on test floor. 7. New handler installation support. 8. Delta Design Engineering Project support group. Show less

    • Industrial Instrumentation Technician
      • Oct 2006 - Mar 2007

      Position: Industrial Instruments Technician ( LX / TURBO CASTLE HANDLER Preventive Maintenance ) October 2006 – March 2007 Major Duties and Responsibilities: 1.Perform equipment modifications / conversion set-ups directed by manufacturing engineers. 2.Dismantles, adjust repairs and assembles equipment according to layout plans, blueprints, schematics, operating or repair manuals, rough sketches or drawings. 3.Uses test and diagnostic tools or equipment to perform checkouts. 4.Rebuilds manufacturing equipment as required 5.Perform Test Handler Preventive Maintenance 6.Performs and executes quarterly preventive maintenance on test handler (Castle) 7. Replacement of defective / worn out component and assembly. 8. Calibration of temperature, ionizer decay time, sort replacement accuracy and upgrade sub-assembly to ensure performance reliability in production and conform product requirement and specification 9. Major Breakdown Repair 10.Perform online major repair handler breakdown 11.Equipment Changeovers 12.Perform Test Equipment Kit conversions to support test floors in achieving device set-up in line with the company’s SOP and Set of Standards Show less

    • Sales Marketing Representative
      • Jun 2005 - Jun 2006

      booking / ex-truck sales representative booking / ex-truck sales representative

Education

  • Don Mariano Marcos Memorial State University
    Bachelor, Electrical Engineering
    2000 - 2005
  • School name:

Community

You need to have a working account to view this content. Click here to join now