Frank Babcock

Project Manager at The Stahl Companies
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Elk Grove, California, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Business Consulting and Services
    • 1 - 100 Employee
    • Project Manager
      • May 2022 - Present

      Project Manager working with Washington Hospital on several construction projects utilizing my construction, drafting and HCAI experience. Project Manager working with Washington Hospital on several construction projects utilizing my construction, drafting and HCAI experience.

    • United States
    • Government Administration
    • 500 - 600 Employee
    • Project Coordinator
      • Aug 2020 - Apr 2022

      Management of all projects for the General Services Department. Start with project acceptance, meet with customer to understand their needs, create bid documents, based on County and State regulations due a job walk, receive and accept bids. Select winning bid and work with contractor until project completion Management of all projects for the General Services Department. Start with project acceptance, meet with customer to understand their needs, create bid documents, based on County and State regulations due a job walk, receive and accept bids. Select winning bid and work with contractor until project completion

    • Project Manager
      • Sep 2018 - Mar 2020

    • United States
    • Manufacturing
    • 700 & Above Employee
    • Branch Manager
      • Nov 2015 - Aug 2018

    • Wholesale Building Materials
    • 300 - 400 Employee
    • Warehouse / Operations Manager
      • Mar 2010 - Nov 2014

      Warehouse manager versed in all operational and financial aspects of fleet management, quality control, inventory control, customer service, and personnel coaching and training. Managed an 8 million dollar inventory, continually improved overall warehouse contribution dollars with continuous improvement. Implemented warehouse management system in multiple warehouses. Closed multiple facilities and combined into corporate location to save capital

    • Continuous Improvement Project Manager
      • Apr 2008 - May 2010

      Developed new analytic tools to allow senior management to understand the impact of the operations in a monthly metrics. Updated entire companies truck routing systems to improve overall delivery efficiency. Implements warehouse management software in multiple locations.

    • Wholesale Building Materials
    • 300 - 400 Employee
    • Engineering & Marketing Manager
      • May 1998 - Sep 2006

      Worked with a team to develop a panelized construction system, that was energy efficient, would stand up to 100 mile an hour winds. Created the machinery that would make the panels and fit into a 40' container to send overseas. Pass local building codes and train local personnel how to not only make the panels but construct with the system. Worked with a team to develop a panelized construction system, that was energy efficient, would stand up to 100 mile an hour winds. Created the machinery that would make the panels and fit into a 40' container to send overseas. Pass local building codes and train local personnel how to not only make the panels but construct with the system.

    • United States
    • Manufacturing
    • 1 - 100 Employee
    • Territory Sales Manager
      • Sep 1997 - Dec 1997

      Growth and maintenance of a sales territory. Growth and maintenance of a sales territory.

    • United States
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Fluid Sealing Project Manager
      • Aug 1996 - Sep 1997

      Participate in overall product strategy, train sales and manufacturing personnel, inventory control, analysis of market research and manufacturing coordination. Collaboration of sales, engineering, marketing, manufacturing, and operations in response to customer needs and market opportunities. Coordinate and develop market, sales, engineering, and financial plans for the product line. Established pricing tables based on materials, manufacturing and profit goals. Participate in overall product strategy, train sales and manufacturing personnel, inventory control, analysis of market research and manufacturing coordination. Collaboration of sales, engineering, marketing, manufacturing, and operations in response to customer needs and market opportunities. Coordinate and develop market, sales, engineering, and financial plans for the product line. Established pricing tables based on materials, manufacturing and profit goals.

    • United States
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Cost Estimating & Application Engineer
      • Jun 1992 - Aug 1996

      Estimating Duties: Specification analysis, prepare bid portfolios, price analysis, establish and maintain salesbook, market analysis support, creation of job tracking databases. Application Duties: Pump selection, hydraulic impeller design. Engineering Duties: Design analysis, material coordination, baseplate design, CAD drawings for mechanical, piping, welding, fabrications, outlines, and project engineering. Manufacturing Duties: Assembly and piping Show less

    • United States
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Process and Test Engineer
      • Apr 1991 - Sep 1991

      Processing Duties: Processed in house jobs, design analysis, CAD drawings. Test Duties: Prepared & ran performance tests, drew performance curves. Processing Duties: Processed in house jobs, design analysis, CAD drawings. Test Duties: Prepared & ran performance tests, drew performance curves.

Education

  • California Polytechnic State University-San Luis Obispo
    Bachelor's degree in Engineering Technology, Mechanical Engineering
    1988 - 1992
  • College of San Mateo
    Associate's degree in Drafting, Drafting/Design Engineering Technologies/Technicians
    1985 - 1988

Community

You need to have a working account to view this content. Click here to join now