Francois Reynaud

Project Planner at Glengarra
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Savièse, Valais, Switzerland, CH
Languages
  • francais Native or bilingual proficiency
  • Anglais Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Rifa Ariefandi

Francois was my Senior and mentor of the planning for me, he did a lot to give and share to me about everything related with the planning, scheduling and progress measurement. The way how he communicated to me and explained, really gave me a more clear view about project management thing which I haven't yet before, and also about reporting. He was a good, friendly person and didn't take any differences of status between client and contractor as long as we have the same purpose to achieve the goals.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Switzerland
    • Business Consulting and Services
    • 1 - 100 Employee
    • Project Planner
      • Nov 2022 - Present

      Construction de laboratoires pour produire de nombreux produits en rapport avec les vaccins et autres produits medicaux Construction de laboratoires pour produire de nombreux produits en rapport avec les vaccins et autres produits medicaux

    • France
    • Defense and Space Manufacturing
    • 200 - 300 Employee
    • Responsable contrôle planification
      • Mar 2021 - Oct 2021

      Mise en place de 2 plannings Directeurs, recherche des risques planning, Tableaux de suivi des couts pour une usine de fabrication: la chimie des poudres pour l'armement, le civil, l'espace Mise en place de 2 plannings Directeurs, recherche des risques planning, Tableaux de suivi des couts pour une usine de fabrication: la chimie des poudres pour l'armement, le civil, l'espace

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Responsable planification
      • Mar 2020 - Mar 2021

      Mise en place d'un Plannng EPC pour l'extension d'un Laboratoire pharmaceutique a Arras Mise en place d'un Plannng EPC pour l'extension d'un Laboratoire pharmaceutique a Arras

    • Indonesia
    • E-Learning Providers
    • Lead Planning Engineer
      • Jan 2019 - Feb 2020

      Following for Edvance of 40 planning's from equipment's manufacturer (engineering, fabrication and delivery) - Hinkley Point C Project in UK EPR (nuclear) Merging and Summarising all these planning in the general EPR planning in Bristol (UK). Following for Edvance of 40 planning's from equipment's manufacturer (engineering, fabrication and delivery) - Hinkley Point C Project in UK EPR (nuclear) Merging and Summarising all these planning in the general EPR planning in Bristol (UK).

    • France
    • Industrial Machinery Manufacturing
    • Planificateur principal
      • Mar 2018 - Dec 2018

      Fabrication de fours industriels - Furnace manufacturing Fabrication de fours industriels - Furnace manufacturing

    • Hungary
    • Business Consulting and Services
    • KEY WORD - Mot CLES
      • Jul 2008 - Dec 2018

      Gestion de projet – Planning Manager –EPC – EPCC - Planification de projets – senior planification – responsable Planning – Planificateur Integrated- merging – fusion de planning Microsoft office - Microsoft excel – Microsoft word – Power Point – Access Primavera P6 - Projet Microsoft – MS Project – visual projet Ingenierie de projet – communication – Analyse des risques Anglais – Francais –English - French Petrole – Gas - Nucleaire – pharmacie – echangeur - petrochimie – chimie - GNL Aeronautique, mechanique des fluids, mecaniques des materiaux Shut-down – arret - maintenance Show less

    • Oil and Gas
    • 700 & Above Employee
    • Planificateur
      • Dec 2017 - Mar 2018

      Preparation de propositions pour des planning EPC Preparation de propositions pour des planning EPC

    • SHELL PRELUDE FLNG - Deputy Planning Manager
      • Dec 2014 - Jun 2017

      Prelude Project is a consortium between Technip France and Samsun Heavy Industries (SHI) for SHELL. It is the largest floating facility ever built. Importing large quantities of high pressure feed gas on a floating facility. Total weight is 600 000Tonnes and dimension are 488m length and 74 m large with a Production capacity is LNG = 3.2 to 3.7 Mtpa and Liquefaction process on board by cooling. I joined the Project for the Modules integration in the Hull Preparation of 18 planning (modules) and full integration of these planning (using P6 –Primavera), including substructure and Commissioning planning. Phase construction and integration in the hull of Prelude, FNLG Project from SHELL. • Responsible up to 10 Planning Engineers • Progress, Critical analysis, Weekly & Monthly and Reporting to Management and Client. • Risk analysis and study of sub-contractor’s productivity Show less

    • Lead planner Yadana Project
      • May 2012 - Dec 2014

      Lead planner for TOTAL Project of Green and Brown field Offshore New platforms, Construction, Installation and Revamping Assistance to follow Contractors planning Merging all planning, Cost, risk Analysis Call for Tender Lead planner for TOTAL Project of Green and Brown field Offshore New platforms, Construction, Installation and Revamping Assistance to follow Contractors planning Merging all planning, Cost, risk Analysis Call for Tender

    • Planning Manager
      • Dec 2010 - Apr 2012

      Follow the construction of " centrales EDF-DOM Port Est, La Reunion Island. Planning, Interfaces, Critical Path and Risk Analysis. Follow the construction of " centrales EDF-DOM Port Est, La Reunion Island. Planning, Interfaces, Critical Path and Risk Analysis.

    • Belgium
    • Construction
    • 1 - 100 Employee
    • Lead Planning Engineer
      • Jul 2010 - Dec 2010

      Preparation des procedures et des plannings pour le chantier du Terminal Methanier de Dunkerque Assistance a Maitrise d'ouvrage avec le chef et le directeur du projet Interfaces, chemin critique et analyse des risques Preparation des procedures et des plannings pour le chantier du Terminal Methanier de Dunkerque Assistance a Maitrise d'ouvrage avec le chef et le directeur du projet Interfaces, chemin critique et analyse des risques

    • Canada
    • Civil Engineering
    • 700 & Above Employee
    • Lead Planning Engineer
      • Aug 2009 - Jun 2010

      refubishing and installation of a pharmaceutic laboratory (for vaccin) Client:GSKbio in Belgium refubishing and installation of a pharmaceutic laboratory (for vaccin) Client:GSKbio in Belgium

    • Responsable planification
      • Jul 2009 - 2010

      ECP was my consultant in Paris Working with them for: - Project in Belgium for SNC Lavalin & GSK, Bulk Production Unit revamping inactived Polio Vaccine project Laboratory - project in Paris for CIT- EDF, LNG Terminal Construction ECP was my consultant in Paris Working with them for: - Project in Belgium for SNC Lavalin & GSK, Bulk Production Unit revamping inactived Polio Vaccine project Laboratory - project in Paris for CIT- EDF, LNG Terminal Construction

    • Lead Planning Engineer
      • Aug 2008 - Jul 2009

      Preparation of the schedule for the Shotkam pdevelopment AG Project in joint venture with Statoil Hydro and Gasprom and Total To assist the Client to Follow FEED Contractors' and Schedules To prepare Overall FEED and EPC Schedule for the Project To assist the Project Director and Construction Manager Risk Analysis and many Simulations On the Shotman Project, Russia Preparation of the schedule for the Shotkam pdevelopment AG Project in joint venture with Statoil Hydro and Gasprom and Total To assist the Client to Follow FEED Contractors' and Schedules To prepare Overall FEED and EPC Schedule for the Project To assist the Project Director and Construction Manager Risk Analysis and many Simulations On the Shotman Project, Russia

    • Planning Manager for CTJV (Chyoda-Technip)
      • Feb 2006 - Jul 2008

      To control 10 planning EngineersTo assist the Project Director and Construction ManagerRisk Analysis and many SimulationsOn the LNG project in Qatar

    • Lead Planning Engineer and Planning Manager
      • Sep 2002 - Jul 2008

      From 2002 to Aug 2008: TECHNIP - PLANNING MANAGERFor Oil Gas projects from engineering to delivery to clientProgress and Reporting to Management and Client.Risk analysis and study of sub contractors productivity.Following interfaces between contractorsClient: Ras Gas and Exxon Mobil Qatar in joint venture with CHIYODA. 100 millions direct man hours.; Client: TOTAL. Shut down, Refurbishing, and new unit.UE-1, 9-4 (Hydrogen plant construction with Technip). 200 MUSD Client: SYNCRUDE (Oil Sands refinery; New Unit construction CLP (tanks LNG) with Technip. Client: Qatar Gas and Exxon Mobil in joint venture with CHYIODA. Preparation of EPC level 3 schedule and following up of the progress.Aluminium factory, Prime G, LNG Terminal. .Projects Proposition (FEED) with Technip. Show less

    • Lead Planning Engineer
      • Jan 2001 - Aug 2002

      Refinery shut down 2002.; Steam Cracker revamping, debottlenecking and shut down. 800 MF. Refinery of Carlin, FRANCE.Client: Atofina. Master Builder: TECHNIP.Shut down and new unit of Lactame. 220 MF. Petrochemical Plant

    • Lead Planning Engineer
      • Jan 2000 - Jan 2002

      Raffinery shut down and Maintenance.New units construction.Progress and Reporting to Management and Client.Risk analysis and study of sub contractors productivity. Interfaces

    • France
    • Oil and Gas
    • 1 - 100 Employee
    • Project/Sevices Manager depart FRAMATOM / PACKINOX
      • Jan 1999 - Jan 2000

      Chef des services exterieurs avec 10 techniciens chez PACKINOX branche industrie de FRAMATOM Ingénieur projet et suivi planning Installation d'echangeurs a plates dans le monde Plates Heat exchangers installation in the world. Chef des services exterieurs avec 10 techniciens chez PACKINOX branche industrie de FRAMATOM Ingénieur projet et suivi planning Installation d'echangeurs a plates dans le monde Plates Heat exchangers installation in the world.

    • Project/Services Manager
      • Aug 1993 - Jan 1998

      Lifting Platform from barge to jacket Other hydraulics Installations Chef des services exterieurs avec 10 techniciens Ingénieur projet et suivi planning Lifting Platform from barge to jacket Other hydraulics Installations Chef des services exterieurs avec 10 techniciens Ingénieur projet et suivi planning

    • Airlines and Aviation
    • 1 - 100 Employee
    • Project Engineer/Manager
      • Jan 1991 - Aug 1993

      Engineering Bureau for Platforms construction and petrol prospection Engineering Bureau for Platforms construction and petrol prospection

    • Canada
    • Design Services
    • 1 - 100 Employee
    • Project & Research Engineer
      • Jan 1986 - Dec 1990

      Bureau mechanical Engineer - To work in hand with the University of stellenbosch to help the industry in South Africa. Bureau mechanical Engineer - To work in hand with the University of stellenbosch to help the industry in South Africa.

    • India
    • Research Services
    • 300 - 400 Employee
    • Project & Research Engineer
      • Jan 1981 - Dec 1985

      Council Scientific for Industry and research. I was in the Fluid mecanic departement to solve industrial problems in South Africa Council Scientific for Industry and research. I was in the Fluid mecanic departement to solve industrial problems in South Africa

    • Project & Research Engineer
      • Jan 1978 - Jan 1981

      SEP: Society Europeen Propulsion. For the above work: cost, planning, projects EPC, responsible of services & research technicians) I work on the Europeen Lancer, Ariane Rocket for the fabrication and tests on the 1rs and 2sd level and on the reability of the reception satellite " SPOT" SEP: Society Europeen Propulsion. For the above work: cost, planning, projects EPC, responsible of services & research technicians) I work on the Europeen Lancer, Ariane Rocket for the fabrication and tests on the 1rs and 2sd level and on the reability of the reception satellite " SPOT"

Education

  • Ecole supérieure des Techniques aéronautiques et de Construction automobile
    ESTACA, Aeronautique. Espace. Automobile
    1973 - 1978
  • ESTACA
    ingenieur, Fluide Mecanique - Aeronautique
    1973 - 1978
  • UNIV. OF STELLENBOSCH
    Master of Science, Fluid Mechanics , General mechanics and Strength Mechanics.
    1986 - 1990
  • Cape Peninsula University of Technology
    Certificate in Project Management, Project Plan, Planning, Resources needed, Timelines, Cost, Procurement, Risk, Critical Path, Quality
    1991 - 1991
  • KEY WORDS & MOTS CLES
    1978 - 2018

Community

You need to have a working account to view this content. Click here to join now