Francisco Montero
OSP Supervisor at Al Mozoon Telecom Company Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Al Mozoon Telecom Company Limited
-
Telecommunications
-
1 - 100 Employee
-
OSP Supervisor
-
Jun 2013 - Present
FTTH and GSM Project FTTH and GSM Project
-
-
-
Trans Telecoms
-
Telecommunications
-
1 - 100 Employee
-
FTTH Telecom Inspector
-
Jan 2012 - Jun 2013
• Check the quantity all the material during installation. • Supervision all installation group. • Survey & checking all the following Construction Activity like Visual Inspection of Trenching, handhole Installation and (HDPE) Pipe Laying, concreting, milling and asphalt paving. • Make sure that all accessories of manhole are properly installed. • Maintain a high level of productivity to ensure all project timeline is met. • Prepare daily progress report. • Supervision of fiber works, distribution fiber, feeder civil and feeder fibers. Show less
-
-
-
Korean Middle East Engineering Co., Ltd.
-
Riyadh KSA
-
FTTH Telecom Supervisor
-
Jul 2011 - Jan 2012
• Check the quantity all the material during installation. • Site survey and plan revision. • Supervision all installation group. • Survey & checking all the following Construction Activity like Visual Inspection of Trenching, Manhole Installation and (HDPE) Pipe Laying& Sub duct. • Perform mandrill testing (HDPE) pipe From MH to MH or End to end. • Make sure that all accessories of manhole are properly installed. • Maintain a high level of productivity to ensure all project timeline is met. • Prepare daily progress report. Show less
-
-
-
Al Mozoon Telecom Company Limited
-
Telecommunications
-
1 - 100 Employee
-
Site Supervisor
-
Dec 2010 - Jun 2011
• Responsible for the safety and Proper placing signage on site. • Survey & checking all the following Construction Activity like Visual Inspection of Trenching, Manhole Installation and (HDPE) Pipe Laying& Sub duct. Cable Pulling, Tape placing, E.M.S, Marker Post, up to back filling. • Perform mandrill testing (HDPE) pipe From MH to MH or End to end Concrete incase • Make sure that all accessories of manhole are properly installed. • Check and verification the specifications of Cable, Visual Inspection. • Checking all the tools they are good Condition. • Check and follow up Plans & B.O.Q for proper implementation and coordination. • Maintain a high level of productivity to ensure all project timeline is met. • Ensure quality controls are in place in adherence with company specification and procedure. Show less
-
-
-
Mohhamed Bin Garboo Co. K.S.A.
-
Saudi Arabia
-
Site Supervisor
-
Dec 2004 - Oct 2010
• Survey & checking all the following Construction Activity like Visual Inspection of Trenching, Manhole Installation and (HDPE) Pipe Laying& Sub duct. Cable Pulling, Tape placing, E.M.S, Marker Post, up to back filling. • Perform mandrill testing (HDPE) pipe From MH to MH or End to end Concrete incase • Make sure that all accessories of manhole are properly installed. • Check and verification the specifications of Cable, Visual Inspection. • Checking all the tools they are good Condition. • Check and follow up Plans & B.O.Q for proper implementation and coordination. • Maintain a high level of productivity to ensure all project timeline is met. • Ensure quality controls are in place in adherence with company specification and procedure. Show less
-
-
-
Teledotcom Est.Manila philippiness.
-
Philippines
-
(OSP/ISP) GSM INSTALLER TECHNICIAN
-
Mar 2003 - Nov 2004
• Installation & testing commissioning of Nokia Flexihopper (SMART PROJECT) • Installation of Nokia UltraSite BTS. (SMART PROJECT) • Installation of Nokia MetroSite BTS. (SMART PROJECT) • Installation of Ericsson RBS 2206 and 2207. (GLOBE PROJECT) • Installation & testing commissioning of Nokia Flexihopper (SMART PROJECT) • Installation of Nokia UltraSite BTS. (SMART PROJECT) • Installation of Nokia MetroSite BTS. (SMART PROJECT) • Installation of Ericsson RBS 2206 and 2207. (GLOBE PROJECT)
-
-
-
ADEED TELECOM CO. LTD.K. S. A.
-
Saudi Arabia
-
GSM INSTALLER TECHNICIAN
-
Sep 2001 - Feb 2003
• Installation of Ericsson RBS-2202 • Installation of Microwave transmission. • GSM Indoor and outdoor installation. • Assembling of cable jumpers & connectors like Andrew and RFS type. • Installation of Feeder Cables LDF4, LDF5 & LDF7. • Installation of Rectifiers. • Installation of GSM grounding system. • Swapping of Lucent Equipment’s to Nokia and Ericsson Equipment’s. • Installation of Ericsson RBS-2202 • Installation of Microwave transmission. • GSM Indoor and outdoor installation. • Assembling of cable jumpers & connectors like Andrew and RFS type. • Installation of Feeder Cables LDF4, LDF5 & LDF7. • Installation of Rectifiers. • Installation of GSM grounding system. • Swapping of Lucent Equipment’s to Nokia and Ericsson Equipment’s.
-
-
-
-
TELECOM INSTALLER TECHNICIAN
-
May 1996 - Jun 2001
• Installationof Multiplexers like OMUX, ASLMX, SDM-1 etc. • Installation testing and commissioning of Microwave transmission. • Installation of feeder cables and connectors, LDF4, LDF5, LDF6 and LDF7. • Installationof Multiplexers like OMUX, ASLMX, SDM-1 etc. • Installation testing and commissioning of Microwave transmission. • Installation of feeder cables and connectors, LDF4, LDF5, LDF6 and LDF7.
-
-
-
ADFRAN INDUSTRIAL COMPANY. PHILIPPINES
-
Philippines
-
INDUSTRIAL ELECTRONIC TECHNICIAN
-
Sep 1991 - Apr 1996
• Installationof motor controls using magnetic contactors, relays • Wiring of motors single phase/three phase, wye and delta connection. • Design wiring and installation single/three phase motors and control switch. • Installationof motor controls using magnetic contactors, relays • Wiring of motors single phase/three phase, wye and delta connection. • Design wiring and installation single/three phase motors and control switch.
-
-
-
-
Cable Splicer
-
Oct 1990 - Jul 1991
• Cable splicing indoor and outside service installer and maintenance. • Cable splicing indoor and outside service installer and maintenance.
-
-