Foman Forough

Water Resources Specialist- Engineer at South Nation Conservation
  • Claim this Profile
Contact Information
Location
Embrun, Ontario, Canada, CA

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
LinkedIn User

08/24/2022 To whom it may concern; My name is Khan Mohammad Takal, former Director General National Water Affairs Regulation Authority where Foman was a vital member to our team working as General Director of Kabul River Basin at the National Water Affairs Regulation Authority. During our time working together Foman stood out for her dedication and hard work. She is an outstanding individual and well known for her intelligence, work ethic, positive attitude, teamwork mentality, leadership and integrity. She was well respected and known for her time management throughout the organization where she delivered projects on time, her ability to meet deadlines is admirable, even with short notices. In addition to being highly reliable and not losing track under an enormous amount of pressure, Foman has the potential to grow in her professional career wherever she works. Foman played a vital role in projects’ evaluations, monitoring, and facilitating connections between interrelated and outside organizations. She was an outstanding focal point between the Indian Embassy and NWARA for Shahtoot Dam. Foman was able to create a transparent system that prevented any possible avenues of corruption and dishonesty within her supervision. Fair to mention her absolute important role in Shah va Arus Dam project where she performed brilliantly. In summary, Foman will be a tremendous asset to any entity she joins as she has a proven track of records where she can demonstrate a high level of dedication, purposefulness, clarity, and joyfulness herself. Without a doubt, I confidently recommend her for any project that involves complexity, time constraints, or high-quality requirements. Please feel free to contact me if you have any questions about this outstanding young woman. Sincerely Yours Khan Mohammad Takal Former Director General of National Water Affairs Regulation Authority +1 571 567-7177 Khan.takal@gmail.com

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Foundations of Project Management - S2S
    Schulich School of Business - York University
    Dec, 2022
    - Sep, 2024
  • Water Diplomacy and Transboundary Aquifer Management
    UNESCO
    Jul, 2022
    - Sep, 2024
  • Membership in The Women In Water Management Network Central Asia and Afghanistan
    OSCE
    Feb, 2022
    - Sep, 2024
  • Flood Modeling Training
    Medini Research & Analytics Pvt. Ltd. (MRA)
    Dec, 2019
    - Sep, 2024
  • Certificate of Participation in the 3rd International Water And Health Congress, Antalya
    Republic of Turkey Ministry of Health
    Nov, 2019
    - Sep, 2024
  • Training Workshop on Dam Safety
    FAO
    Jul, 2017
    - Sep, 2024

Experience

    • Canada
    • Environmental Services
    • 1 - 100 Employee
    • Water Resources Specialist- Engineer
      • Jan 2023 - Present
    • General Director of Kabul River Basin
      • May 2020 - Aug 2021

      Kabul river basin area is 108,441 square kilometers. This river basin constitutes 36 percent of the total water capacity of Afghanistan. The average annual rainfall in this area is 378 mm. The main challenge in the Kabul river basin is unbalancing between sources and consumption because most of the population lives in the upper part of the area, which unfortunately has the least water, in contrast to the most water in the lower part where the least population is there. The total population of the Kabul River Basin is 12.4 million people a. It has 1.73 million hectares of agricultural areas, including forests, orchards, etc. Job Description of Kabul River Basin General Directory Implement IWRM and Sustainable Development Goals especially SDG6 in 14 Sub River Basin. Perform needs assessments, and set priorities, and activities according to a program-based budgeting system in order to achieve the strategic goals of NWARA. Management of storing, distribution, and allocation of water in the relevant area to users for various purposes regarding economic rationality. Management of the preparation and implementation of the master plan of the sub river basins and river basin according to water resource status, preparing short-term and medium-term investment plans. Monitoring of the survey, design, and technical studies of water infrastructure. Management to resolve water disputes, establish associations, and maintain water facilities. Management of natural disaster forecasting and warning systems (drought, flood) in relevant sub-river basins. Ensuring transparency and accountability of the projects. Spearheaded innovative approaches to resource allocation and strategic planning. Show less

    • Afghanistan
    • Education Management
    • 1 - 100 Employee
    • Lecturer
      • Apr 2020 - Aug 2021

      Teach hydraulic structure subject for bachelor level. Focusing on hydraulic structures, particularly on structural aspects and design. Examples of application areas include gates, barriers, dikes, dams, quay walls, floating structures, etc. Teach hydraulic structure subject for bachelor level. Focusing on hydraulic structures, particularly on structural aspects and design. Examples of application areas include gates, barriers, dikes, dams, quay walls, floating structures, etc.

    • Acting director of Water Allocation
      • Mar 2020 - May 2020

      Perform needs assessments, and set priorities, and activities according to a program-based budgeting system in order to achieve the strategic goals of NWARA. Management, monitoring, analysis, and distribution of water resources for various purposes (consumption, agriculture, industry, environment, and …) in the river basins. Allocation of water considering the rationality and economic value and evaluation of the efficiency of the allocated water. Evaluate the performance of affected employees to motivate them to improve performance, increase efficiency and productivity, determine training needs and increase capacity building Show less

    • Afghanistan
    • Civil Engineering
    • 1 - 100 Employee
    • Dam and River Adviser
      • Aug 2018 - Mar 2020

      Prepare plans for controlling and managing surface water and groundwater. Collaborate to Prepare the 5 years water plan. Prepare water policies related to water law especially the price of water and services. Follow up on the Water projects, resolved problems, improved operations of projects, and report to Minister and water deputy. Provide reconnaissance reports for new dams and projects, Study the technical report of dam projects. Prepare Solar Pump Projects for agriculture. Conducted research, gathered information from multiple sources, and presented results Show less

    • Hydraulics Structure Design Specialist
      • Apr 2016 - May 2018

      Dam Design (find the location for dams, estimate the dam’s reservoir, stability, and seepage analysis and design of dams, hydropower capacity, irrigation potential, ...) Provide reconnaissance and pre-feasibility reports of water infrastructure projects. Design the Micro hydropower and the hydraulics structures such as spillway, weir, canal, intake, pipe, stilling basin, outlets, and … Work on a 5-year plan for the water sector of MEW (according to SDGs especially the 6th goal). Review the detail design and feasibility study of dams. Proved successful working within tight deadlines and a fast-paced atmosphere. Prepared a variety of different written communications, reports, and documents. Collaborated with team members to achieve target results. Show less

    • project Coordinator
      • Jul 2012 - Feb 2014

      Provide the material submittals for the projects pursuant to the contract (RFB) and specification. Coordinating site activities via daily reports. Reviewing design and estimating the quantities of the project. Coordinated presentations for customers and project members to detail project scope, progress, and results. Tracked hours and expenses to keep the project on task and within budgetary parameters. Photocopied, distributed, and emailed documents to project managers and prepare daily, weekly, and monthly reports. Kept projects on schedule by managing deadlines and adjusting workflows. Prepared meeting agendas and minutes for distribution and record keeping. Show less

    • Structural Design Engineer
      • Jan 2012 - Jul 2012

      Design the buildings and draw the structure plan for buildings, houses, and hotels. Design the septic tank, oil water separator, and grease trap. Design guard tower, entry gate, and canopy. Improved operations through consistent hard work and dedication. Design the buildings and draw the structure plan for buildings, houses, and hotels. Design the septic tank, oil water separator, and grease trap. Design guard tower, entry gate, and canopy. Improved operations through consistent hard work and dedication.

Education

  • Ferdowsi University of Mashhad
    Master of hydraulics structure, Civil Engineering
    2014 - 2017
  • Herat University
    Bachelor's degree, Civil Engineering
    2008 - 2011

Community

You need to have a working account to view this content. Click here to join now