Florian Dieterle

Principal Engineer at CaSE Contractors & Design
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Sydney Area, AU
Languages
  • German Native or bilingual proficiency
  • English Full professional proficiency
  • French Limited working proficiency
  • Korean Elementary proficiency
  • Spanish Elementary proficiency
  • Japanese Elementary proficiency
  • Russian Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • National Engineering Register
    Engineers Australia
    Feb, 2017
    - Nov, 2024
  • Chartered Engineer (Structural and Civil) MIEAust CPEng NER
    Engineers Australia

Experience

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Principal Engineer
      • Jul 2017 - Present

      Managing the Design team of CaSE& Pike Design to develop solutions for complex infrastructure projects with particular focus on bridge construction stages and temporary works. Managing the Design team of CaSE& Pike Design to develop solutions for complex infrastructure projects with particular focus on bridge construction stages and temporary works.

    • Australia
    • Truck Transportation
    • 700 & Above Employee
    • Technical Consultant
      • Nov 2016 - Sep 2017

      Technical coordination of the Cable Stay Bridge of the Sydney Metro Northwest.The 270m long main bridge together with 4km of viaduct forms part of Salini-Impreglio's (ISJV) $340million contract.Embedded in the contractors' team, tasks included:- Technical coordination between TfNSW (client), Salini Impreglio (principal contractor), SMEC and Rendel (designer and proof engineer)- Develop methodology for jacking temporary supports and install stay cables to achieve final structural form- Review constructability and refine methodology of precast segmental deck- Technical oversight of fabrication and erection of 2x240t steel towers

    • Spain
    • Construction
    • 700 & Above Employee
    • Senior Engineer - Cable Stayed Bridge Superstructure
      • Mar 2015 - Apr 2017

      I worked on the Superstructure of the 2.7km long cable supported bridge for FCBC, a joint venture of Hochtief Construction, American Bridge International, Dragados SA and Morrison Construction.- Key technical contact between designer, temporary works department and site operations team- Liaison with permanent works designers to resolve technical issues and re-design some details, peer reviews- Development of temporary works methods and detailed design- Construction Engineering for balanced cantilever erection and closures- Supervision and inspection of site operations (Temporary works coordinator role)

    • Switzerland
    • Construction
    • 700 & Above Employee
    • Senior Design Engineer
      • Jan 2014 - Jan 2015

      Technical coordination of design projects in VSL's Technical Centre Asia.Projects typically include bridge construction equipment (launching gantries, segment loading installation), temporary works design (formwork, temporary supports), permanent works checks (post-tensioning alternatives, checks).Size of projects in the range of 100 - 1000 t of structural steel.Responsibilities include:Definition and review of concepts, coordination of team allocated for project, checking design / detailing by team members, monitoring schedule and budget, communication with client, site visits, coaching of junior staff.

    • Design Engineer in TCA
      • Jan 2010 - Dec 2013

      Technical Centre Asia (TCA) of VSL, a Specialist Construction Partner with its own Post-tensioning system.My activities in structural engineering include:1. Temporary works design for bridge construction (segment casting and erection gantries) and heavy lifting2. Geometry Control of precast segmental bridges3. Permanent works design for special projects (from concept to fabrication drawings)4. Design to many International Standards and with sophisticated FEM software

    • Switzerland
    • Construction
    • 500 - 600 Employee
    • Trainee in Structural Design
      • Apr 2007 - Sep 2007

      Acivities during my training in the department 'Structures' of the technical centre of the Swiss maincontractor Losinger (www.losinger.ch):Examination of seismic performance of existing buildings according to current requirements.This internship was in French. Acivities during my training in the department 'Structures' of the technical centre of the Swiss maincontractor Losinger (www.losinger.ch):Examination of seismic performance of existing buildings according to current requirements.This internship was in French.

    • Trainee in Road Design
      • Oct 2006 - Dec 2006

      Trainee/Internship program organised by IAESTE.NII TK is a research institute for Transport doing feasibility studies and traffic flow modeling for government infrastructure projects (www.niitk.kz).Activities: Preparation of sketches and drawings for feasibility study of a large bypass road in Almaty.Also intensively learned Russian during this stay. Trainee/Internship program organised by IAESTE.NII TK is a research institute for Transport doing feasibility studies and traffic flow modeling for government infrastructure projects (www.niitk.kz).Activities: Preparation of sketches and drawings for feasibility study of a large bypass road in Almaty.Also intensively learned Russian during this stay.

    • Cyclist Messenger
      • 2000 - 2005

      Urgent delivery of goods by bicycle.Part-time job during studies. Urgent delivery of goods by bicycle.Part-time job during studies.

Education

  • ETH Zürich
    MSc Civil Eng, Civil Engineering (Structural and Geotechnical)
    2003 - 2009
  • 東京大学
    MSc (The University of Tokyo), Geotechnical Earthquake Engineering
    2008 - 2009
  • Kantonsschule Schaffhausen
    -

Community

You need to have a working account to view this content. Click here to join now