Firoz Kabir
Assistant Engineer at Northern Electricity Supply Company Limited (NESCO)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Northern Electricity Supply Company Limited (NESCO)
-
Utilities
-
1 - 100 Employee
-
Assistant Engineer
-
Mar 2020 - Present
-
-
-
Confidence Power Holdings Ltd.
-
Bangladesh
-
Mechanical Or Industrial Engineering
-
100 - 200 Employee
-
Assistant Engineer
-
Sep 2019 - Mar 2020
113 MW HFO BASED POWER PLANT 113 MW HFO BASED POWER PLANT
-
-
-
SINHA POWER GENERATION COMPANY LTD.
-
Kheyaghat, Bhola
-
Shift Engineer
-
Sep 2018 - Sep 2019
34.5 MW (Gas Turbine) & 24 MW (Gas Engine) Power Plant **Gas Turbine Operation 1) Operation and control of 34.5 MW Gas Turbine (Turbine - GE ALSTHOM, Model- PG 6541 B, Frame-6, Single-Shaft, 17 stage axial flow compressor, 3 stage turbine, rpm- 5163, Dual Fuel, Speed-Tronic Mark-IV control system, Synchronous Generator-NTC, 42 MW, 52.5 MVA) with auxiliary system. 2) Operation of Motor Control Panel (MCC), Excitation Panel, Protection Panel of Generator & Transformer, Synchronization panel, Turbine Control Panel. 3) Instant action taken by switching to isochronous speed control mode from droop speed control mode when national grid circuit tripping occurs. 4) Automatic & manual synchronization of gas turbine & gas engine alternators with national grid circuit using Synchroscope. 5) Operation and Supervision of 11/33KV Sub-Station, Switchgear & Protection Equipment, CT(600/1A), PT(33KV/110V), 2*20/25 MVA, 1*30/35 MVA ONAN/ONAF Power Transformers. 6) Maintain load dispatch according to the demand of NLDC and local power distribution company ( WZPDCL & BREB). 7) Changeover of auxiliary power between GTG unit & GEG unit. 8) Monitor, analyze & control all running equipment parameters and take sudden steps required for prudent operation of the plant. 9) Operation, fault recording & resetting of different Generator protection relay and Transmission line protection relay (Sepam T87, MiCOM P122, MICOM P127,Symap) co-ordination. ** Gas Engine Operation 1) Operation of 24 MW Gas Engine (Engine – NIGATA(6MWx4) , Model – 18V28AGS, rpm-750, Alternator – NISHISHIBA, each rated 7.5MVA), start up, shut down, full load running and tripping condition with auxiliary system. 2) Operation of Emergency Diesel Engine Generator (EDG). 3) Prepare Daily Plant Availability, Daily & hourly Plant Generation, Monthly Gas Consumption and Transmission Line (33KV) Interruption report for both GTG & GEG unit. Show less
-
-
Education
-
Khulna University of Engineering and Technology
Bachelor of Science (Engg), Electrical and Electronic Engineering -
Rajshahi Government City College
Higher Secondary Certificate, Science