firman miftah
QAQC Inspector at PT Patra Badak Arun Solusi- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Indonesian Native or bilingual proficiency
-
English Elementary proficiency
Topline Score
Bio
Credentials
-
International welding Inspector Personel
International Institute of Welding -
Welding Inspector
Balai Besar Bahan dan Barang Teknik - B4T
Experience
-
PT Patra Badak Arun Solusi
-
Indonesia
-
Oil and Gas
-
300 - 400 Employee
-
QAQC Inspector
-
Dec 2021 - Present
-
-
-
PT. Tiga Pilar Energi
-
Semarang, Jawa Tengah, Indonesia
-
QA/QC Inspector Mechanical & Piping
-
Jan 2020 - Aug 2021
-
-
-
PT. Oto Sarana Kreasi
-
Senipah, East Kalimantan
-
Quality Assurance Quality Control Inspector
-
Dec 2018 - Dec 2019
-
-
-
PT. Internusa Perkasa Teknik
-
Greater Jakarta Area, Indonesia
-
QA/QC
-
Apr 2017 - Dec 2018
Project Clearance : - Expansion Pipe PE Distribution for Commercial and Household in Jambi City - Indonesia - Fabrication Launcher, Reciever and goose neck for pipe Cleaning material - Pipe Inspection with Intelegent Pig for pipe line 28” at PT. Pertamina EP Asset 2 Pendopo field – Palembang Project Clearance : - Expansion Pipe PE Distribution for Commercial and Household in Jambi City - Indonesia - Fabrication Launcher, Reciever and goose neck for pipe Cleaning material - Pipe Inspection with Intelegent Pig for pipe line 28” at PT. Pertamina EP Asset 2 Pendopo field – Palembang
-
-
-
CV. Tirama Pratama
-
Bekasi, Indonesia
-
QA/QC
-
Mar 2016 - Mar 2017
Project Clearance : - New instalation pipeline Ø 8” 12 km and piping gas distribution for PLTMG from Payo Selincah to Sungai Gelam – Jambi. - Kickerline modification for new instalation valve with goldent joint at Station Grissik- Palembang. - Installation Pipeline ø6” 1.5 KM Gas Dristribution for PT. Asia Health Energy and Beverages. Sukabumi – West Java Project Clearance : - New instalation pipeline Ø 8” 12 km and piping gas distribution for PLTMG from Payo Selincah to Sungai Gelam – Jambi. - Kickerline modification for new instalation valve with goldent joint at Station Grissik- Palembang. - Installation Pipeline ø6” 1.5 KM Gas Dristribution for PT. Asia Health Energy and Beverages. Sukabumi – West Java
-
-
-
PT. Delta Prima Steel
-
South Kalimantan Province, Indonesia
-
Process Engineer
-
Nov 2012 - Dec 2014
1. Responsible for sponge iron production process, (material selection, production, quality control) 2. Coordinate the work related to supporting the production process (for mechanical / maintenance, electrical, Quality Control, Raw Material Process) 3. To evaluate the problems occurred. 4. Coordinate with the Manager in the decision-making process. 1. Responsible for sponge iron production process, (material selection, production, quality control) 2. Coordinate the work related to supporting the production process (for mechanical / maintenance, electrical, Quality Control, Raw Material Process) 3. To evaluate the problems occurred. 4. Coordinate with the Manager in the decision-making process.
-
-
Education
-
Universitas Jenderal Achmad Yani (Unjani)
Bachelor of Engineering (B.Eng.), Metallurgical Engineering