Fionn O'Brien

Structural Engineer at Iarnród Éireann Irish Rail
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Ireland, IE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Ireland
    • Rail Transportation
    • 700 & Above Employee
    • Structural Engineer
      • Mar 2020 - Present

    • Ireland
    • Construction
    • 1 - 100 Employee
    • Project Engineer
      • Mar 2018 - Mar 2020

      CHARLEMONT STREET REGENERATION PROJECT CHARLEMONT STREET REGENERATION PROJECT

    • Senior Engineer
      • Mar 2016 - Nov 2017

      Data Centres (Dublin Area). Structural Design of steel frame buildings, civil design and site service co-ordination of multiple data centres in the Dublin area. Senior EngineerCity North Petrol Station (City North Meath). Structural desing of steel frame petrol station and forecourt. Civil design, site co-ordination and project management. Senior Engineer.Microsoft Headquarters (Leopardstown Dublin). Structural design of various structural elements within the main building. Senior Engineer.Various luxury house renovations and extensions (Various locations South Dublin). Structural design & project management of various high end house renovations. Senior Engineer.

    • United Kingdom
    • Construction
    • 200 - 300 Employee
    • Project Engineer
      • May 2014 - Feb 2016

      Brent Schools (Wembley London) £25mProject EngineerMarket Porter (Borough Market London) £2mProject EngineerYour New Town Hall (Olive Morris House Brixton London) £100mProject EngineerImperial West (Imperial College London)Project EngineerCity University (London) Project EngineerTait L0 £2mTait L3 £2mRefectory Building £1.5mMain Entrance £ 8m Brent Schools (Wembley London) £25mProject EngineerMarket Porter (Borough Market London) £2mProject EngineerYour New Town Hall (Olive Morris House Brixton London) £100mProject EngineerImperial West (Imperial College London)Project EngineerCity University (London) Project EngineerTait L0 £2mTait L3 £2mRefectory Building £1.5mMain Entrance £ 8m

    • Construction
    • 1 - 100 Employee
    • Structural Engineer
      • Jan 2014 - May 2014

      Structural design and project management of various residential and commercial projects. Structural design and project management of various residential and commercial projects.

    • Ireland
    • Higher Education
    • 700 & Above Employee
    • Research Engineer
      • Jan 2012 - Nov 2012

      I continued working part time on research project "Low cost crash barriers made from natural materials".

    • Research Engineer
      • Feb 2011 - Jan 2012

      Research project titled "Low cost crash barriers made from natural materials". Duties included: Theoretical momentum calculations and material analysis. High speed impact testing. Barrier design and cost analysis. Material testing for use in multibody modelling. Creation of a specification document for a new product and completion of multiple reports on various aspects of the project. I have co-authored four papers from this project. Project sponsored by the National Roads Authority of Ireland.

    • Professional Services
    • 700 & Above Employee
    • Structural Engineer
      • Nov 2007 - Apr 2009

      Highway / Bridge design and assesment. Industrial building design. Eurocode champion.Projects worked on include: Khalifa Port Industrial Zone. Structural design of water retaining tanks and pump house structures to B.S. 8110 and relevant codes for aqueous retaining structures.Eirspan Task order 170. Structural assessment of existing bridge deck following BD 37-01 and BD 21-01 using LUSAS finite element analysis software.A5 Western transport corridor scheme. Assessment of existing bridges for widening. Completing report on the different types of retaining walls. Public consultation.Birmingham Box ATM phase1&2 Bridge impact assessment. Structural assessment of footbridges due to impact loading on the supports and the super structure. Phase 3 gantry assessment. Structural assessment of gantry’s after changing MMI signs for AMI signs and existing highway signs for matrix signs. Following relevant codes.M6 safety fence renewal. Structural assessment of string course of bridges for replacement of safety fence. (Tender stage)Area 13 A65 retaining wall design. Structural design of retaining wall structures for cuttings and embankments.Midland Links Motorway Viaduct Assessment. Structural analysis of highway and bridge structures following BD37-01 and BD21-01 using Lusas finite element analysis software.

Education

  • The University of Glasgow
    MSc, Structural Engineering and Mechanics
    2009 - 2010
  • Dublin Institute of Technology
    BE (Hons), Structural Engineering
    2001 - 2007

Community

You need to have a working account to view this content. Click here to join now