Filips Ivanovs
Deck Foreman/Competent Person/ERTL at CTS OFFSHORE AND MARINE- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Latvian Full professional proficiency
-
Russian Native or bilingual proficiency
-
German Elementary proficiency
Topline Score
Bio
Credentials
-
VOL VCA
ApaveNov, 2019- Nov, 2024 -
Boat Landing & TP Resque
ISEC - Safety - Emergency Training & ConsultingDec, 2015- Nov, 2024 -
CA-EBS
OPITODec, 2015- Nov, 2024 -
IOSH Working Safely
IOSHApr, 2015- Nov, 2024 -
Sea / Air 1 and sea MK LV 2 HUEBA familiarization training
PetrofacMar, 2013- Nov, 2024 -
Confined Space Awareness training (CSA)+Rescue
Baltic Offshore Training CentreNov, 2020- Nov, 2024 -
GWO Refresher Working at Heights Module
Baltic Offshore Training CentreNov, 2020- Nov, 2024 -
GWO Fire Awareness Module
Baltic Offshore Training CentreMay, 2020- Nov, 2024 -
GWO Manual Handling Module
Baltic Offshore Training CentreMay, 2020- Nov, 2024 -
GWO Refresher First Aid
Baltic Offshore Training CentreNov, 2019- Nov, 2024 -
Chester Step Test Certificate
Baltic Offshore Training CentreNov, 2019- Nov, 2024 -
Ecape Chute & Norwegian Suit
OPITOFeb, 2016- Nov, 2024 -
FOET
OPITOFeb, 2017- Nov, 2024 -
GWO Sea Survival Refresher
DELTA Safety TrainingFeb, 2019- Nov, 2024
Experience
-
CTS OFFSHORE AND MARINE
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
Deck Foreman/Competent Person/ERTL
-
Apr 2022 - Present
The HKZ Alpha and HKZ Beta offshore platforms will form the Hollandse Kust Zuid grid connection that links the offshore wind farm zone to the Dutch mainland at the Maasvlakte. Once fully operational in 2023, the 1.5 GW Hollandse Kust Zuid will become the largest operating offshore wind farm in the world. Comprising 140 Siemens Gamesa 11 MW wind turbines, the subsidy-free wind farm will generate enough electricity to meet the annual needs of more than two million households. The HKZ Alpha and HKZ Beta offshore platforms will form the Hollandse Kust Zuid grid connection that links the offshore wind farm zone to the Dutch mainland at the Maasvlakte. Once fully operational in 2023, the 1.5 GW Hollandse Kust Zuid will become the largest operating offshore wind farm in the world. Comprising 140 Siemens Gamesa 11 MW wind turbines, the subsidy-free wind farm will generate enough electricity to meet the annual needs of more than two million households.
-
-
-
Muehlhan Wind Service
-
Denmark
-
Wind Electric Power Generation
-
700 & Above Employee
-
Wind Turbine Technician
-
Jan 2023 - Apr 2023
The Saint-Brieuc wind farm, which is scheduled to be commissioned in 2023, will be composed of 62 wind turbines. Siemens Gamesa Renewable Energy of 8 Megawatts each, for a total capacity of 496 Megawatts. The turbines will be spread over an area of 75 km², with the nearest wind turbine located 16.3 km from the Breton coast. The expected energy production will amount to 1,850Gigawatt-hours, roughly equivalent to the electricity consumption of 835,000 inhabitants, including heating. I have been a part of nice team for mobilization and all necessary preparations for Saint Brieuc OWF project. Part of HSBM team for Siemens Gamesa naselles and Installation team to build the towers, LP and SST platforms on Pre-assembly site. Show less
-
-
-
Siemens Gamesa
-
Spain
-
Renewable Energy Semiconductor Manufacturing
-
700 & Above Employee
-
Technician
-
Mar 2021 - Dec 2021
The Yunlin offshore wind project is developed by Yunneng Wind Power Co. Ltd, a subsidiary of wpd offshore GmbH. The project is located in the Taiwan Strait, between 8 and 17 kilometers off the west coast of Taiwan, at water depths from 7 up to 35 meters. The 82km² project area (6% of Yunlin sea area) will comprise 80 wind turbine generators (WTG) with total capacity of 640 MW rated power, and the generated electricity will be fed into the grid via two onshore substations at Taixi and Sihu Townships respectively in Yunlin County.The first WTG commissioning is planned for the fourth quarter of 2020 and project completion is scheduled for December 2021. Show less
-
-
Technician
-
May 2021 - Aug 2021
Green Tag Project in Cuxhaven. Retrofit of wind turbines type SG 8.0-167 DD for projects Horn Sea 2, Yunlin and Formosa 2.
-
-
-
CWind
-
United Kingdom
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Rigger
-
Sep 2021 - Nov 2021
Second compain of replacement infield cables on OWF Dan Tysk Second compain of replacement infield cables on OWF Dan Tysk
-
-
-
CWind
-
United Kingdom
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Rigger
-
Oct 2020 - Jan 2021
Replacement infield cables on OWF Dan Tysk Replacement infield cables on OWF Dan Tysk
-
-
-
N-Sea Group
-
Netherlands
-
Oil and Gas
-
100 - 200 Employee
-
Deck Foreman
-
Jun 2020 - Sep 2020
Preparation for Viking Link Project, UXO, Preparation for Viking Link Project, UXO,
-
-
-
DEME Group
-
Belgium
-
Civil Engineering
-
700 & Above Employee
-
Rigger
-
Jan 2020 - May 2020
Borssele OWF 1/2
-
-
Rigger
-
Sep 2019 - Jan 2020
SeaMade OWF
-
-
-
Per Aarsleff A/S
-
Denmark
-
Construction
-
700 & Above Employee
-
Rigger
-
Jun 2019 - Sep 2019
Changhua Pile Load Test for The Greater Changhua offshore wind project. Changhua Pile Load Test for The Greater Changhua offshore wind project.
-
-
-
Siem Offshore
-
Norway
-
Oil and Gas
-
700 & Above Employee
-
Deck Foreman
-
Apr 2019 - May 2019
Borssele 3&4 OWF project. Dredging and clean the seabed from debris. Borssele 3&4 OWF project. Dredging and clean the seabed from debris.
-
-
-
DEME Group
-
Belgium
-
Civil Engineering
-
700 & Above Employee
-
Rigger
-
Jan 2019 - Mar 2019
Horn Sea One Project / Hohe See & Albatros OWH / On going SeaMade Project Horn Sea One Project / Hohe See & Albatros OWH / On going SeaMade Project
-
-
-
Siem Offshore
-
Norway
-
Oil and Gas
-
700 & Above Employee
-
Deck Foreman
-
Dec 2018 - Dec 2018
DolWin1 is the first offshore project that TenneT has realized off the bay of Dollart - in the so-called DolWin cluster. Since 2015, up to 800 megawatts (MW) of electricity have been transported over a distance of 165 kilometers through the North Sea and across the mainland using the powerful DolWin1 high-voltage direct current connection. The network connection runs 75 kilometers at sea and another 90 kilometers over land to the converter station in Dörpen West (Heede). Here, the wind power generated at sea is converted from direct current into three-phase current and fed into the grid. DolWin1 connects three wind farms with a total of 184 wind turbines to the German transmission grid. In purely arithmetical terms, around one million households can be supplied with clean energy from the North Sea. From 2019, another 40 wind turbines will feed their electricity into the grid via DolWin1. DolWin1 was already the fifth grid connection that TenneT put into operation in 2015. Show less
-
-
-
-
Rigger
-
Sep 2018 - Oct 2018
Hornsea Wind Farm is a Round 3 wind farm under construction in the North Sea off the coast of England. The wind farm is planned to have a total capacity of up to 6 GW.The development has been split into a number of subzones. The 1.2 GW Project 1 gained planning consent in 2014; a second 1.8 GW Project 2 was given planning consent in 2016. In 2016 a third subzone was split into two projects Hornsea 3 and 4, with approximate capacities of 1–2 GW and 1 GW, increasing the capacity of the developed project to a maximum of 6 GW. Show less
-
-
Rigger
-
Feb 2018 - Sep 2018
EnBW Hohe See and Albatros OWFhttps://www.enbw.com/renewable-energy/wind-energy/our-offshore-wind-farms/hohe-see/
-
-
-
Van Oord
-
Netherlands
-
Civil Engineering
-
700 & Above Employee
-
Rigger
-
Mar 2017 - Aug 2017
The Walney Extension offshore wind farm is located in the Irish Sea, approximately 19 km off the Walney Island coast in Cumbria. The wind farm will consist of 87 wind turbines: 40 Vestas and 47 Siemens wind turbines with a total capacity of 660 MW. Van Oord will transport the foundations, monopiles and transition pieces from the various suppliers in Denmark, Germany and the United Kingdom and then install the foundations at the offshore wind farm site. The installation work will start in spring 2017. Van Oord has reached agreement with DONG Energy of Denmark for the transport and installation of the 87 foundations at Walney Extension offshore wind farm in the United Kingdom. After completion in 2018 this park will deliver sustainable energy to 460,000 households. Show less
-
-
-
Seajacks
-
United Kingdom
-
Maritime Transportation
-
100 - 200 Employee
-
Rigger / MechOp
-
Aug 2016 - Dec 2016
TP and ATP installation with bolting connection, TP has 136 bolts, torquing with Hitorque and do measuring with Dakota system, installation of gratings and cable trays, TP cover, painting measurement, crane safe lifting operations, rigging and slinging, working safely. TP and ATP installation with bolting connection, TP has 136 bolts, torquing with Hitorque and do measuring with Dakota system, installation of gratings and cable trays, TP cover, painting measurement, crane safe lifting operations, rigging and slinging, working safely.
-
-
-
Bilfinger
-
Germany
-
Mechanical Or Industrial Engineering
-
700 & Above Employee
-
Rigger
-
May 2016 - Jul 2016
The Nordergründe windpark will be built in the German North Sea 34 kilometers west of Cuxhaven and will generate an output of about 110 MW. The wind turbines will be built on steel foundations that are up to 55 meters long, so-called monopiles, that are rammed into the seabed. The Nordergründe windpark will be built in the German North Sea 34 kilometers west of Cuxhaven and will generate an output of about 110 MW. The wind turbines will be built on steel foundations that are up to 55 meters long, so-called monopiles, that are rammed into the seabed.
-
-
-
DEME Group
-
Belgium
-
Civil Engineering
-
700 & Above Employee
-
Rigger
-
Dec 2015 - Apr 2016
The Nordsee One wind farm consists of one offshore substation platform and 54 wind turbines which will be installed in water depths ranging between 25m and 29m. The wind farm is situated in a special spatial planning area reserved for offshore wind energy. Due to the distance from shore and the location in the EEZ, Nordsee One will not be visible from shore. The Nordsee One wind farm consists of one offshore substation platform and 54 wind turbines which will be installed in water depths ranging between 25m and 29m. The wind farm is situated in a special spatial planning area reserved for offshore wind energy. Due to the distance from shore and the location in the EEZ, Nordsee One will not be visible from shore.
-
-
-
Van Oord
-
Netherlands
-
Civil Engineering
-
700 & Above Employee
-
Rigger
-
Jul 2015 - Oct 2015
The Gemini offshore wind park in the Dutch North Sea is to be one of the world’s largest wind farms, both in terms of size as well as production. With a total 600 megawatt capacity, Gemini will also be one of the most productive wind farms in the world. Gemini is being built on two locations close to each other, hence the name Gemini (=twins). The official names of the locations are Buitengaats and Zee-energie.In end of October, we finished demobilization on Aeolus. The first phase is done.
-
-
Rigger
-
Mar 2015 - Jun 2015
Tetney project :Onshore and offshore pipe pulling, banksman and lifting operations, mooring operations, pipe rigging and slinging, forklift operations.
-
-
-
JOHANN M. K. BLUMENTHAL
-
World Wide
-
Seaman
-
Dec 2014 - Feb 2015
m/v Olga (Bulker) All deck works, mooring operations, crane (SWL 30t) operations - open cargo holds and cargo operations, change jib and hook wires, watch keeping, cleaning cargo holds/tanks, lashing/unlashing of cargo, renew chain locker. m/v Olga (Bulker) All deck works, mooring operations, crane (SWL 30t) operations - open cargo holds and cargo operations, change jib and hook wires, watch keeping, cleaning cargo holds/tanks, lashing/unlashing of cargo, renew chain locker.
-
-
-
Amisco
-
North & Baltic seas
-
Seaman
-
Jun 2014 - Aug 2014
m/v Merita (GC) All deck work, watch keeping, mooring operations. m/v Merita (GC) All deck work, watch keeping, mooring operations.
-
-
-
-
Rigger
-
Nov 2011 - Jan 2013
Rigging, slinging, lifting containers, fasten. Rigging, slinging, lifting containers, fasten.
-
-
Education
-
TSI
bachelor, Logistic