Fernando Jr. dela Cruz

Building -HVAC/PL/FF Field Engineer at JGC Construction International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Panabo City, Davao Region, Philippines, PH

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

RANDY M.

I could highly recommend Engr Fernando dela Cruz Jr and to be a key element of any commissioning department he will be part of. He is well experience in the field of HVAC commissioning engineering Oil and Gas Industry. He is excellent in HVAC Commissioning Engineer. A strong detail oriented engineer and team player for his role with always advocate teamwork to achieve success to meets client's standard and project requirements. A team player and a team spirit with good abilty to adapt multicultural environment. Also, he has ability to work independently in remote location and he has used his own initiative to achieve company objectives.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • BOSIET
    OPITO
    Nov, 2019
    - Nov, 2024
  • TSbB
    OPITO
    Nov, 2019
    - Nov, 2024
  • Philippine Society of Mechanical Engineers
    Philippines

Experience

    • Singapore
    • Construction
    • 300 - 400 Employee
    • Building -HVAC/PL/FF Field Engineer
      • Oct 2022 - Present

    • Singapore
    • Construction
    • 300 - 400 Employee
    • HVAC COMMISSIONING ENGINEER
      • May 2019 - Sep 2020

    • Germany
    • Semiconductors
    • 700 & Above Employee
    • Mechanical Engineer
      • Jul 2018 - Sep 2018

    • South Korea
    • Construction
    • 700 & Above Employee
    • HVAC Supervisor
      • Apr 2011 - Jul 2018

      •Review and preparation of HVAC schedule as per client and project completion by using Primavera (P6) and Microsoft Project 2010. •Supervision of project contractor such as ducting works, plumbing works, piping works and HVAC control works. •Measured and estimated the material take –off for the required materials and tools and equipment’s and other consumables items. •Inspection of installation against shop drawings, ducting system, duct reinforcement, hangers and rods as per client approved drawings and check duct sizes and sheet thickness in accordance to the required codes and standard as per SMACNA •Prepared technical query; checking the actual site condition, preparation of supporting document i.e. erection and plan drawing for comparison, photo with recommendations. •Prepared the Documentation and systematic filing of incoming and out-going documents. •Ensures manpower availability for every building for optimum performance. •Ensures that proper work scheduling in time so as to ensure an uninterrupted work schedule. •Responsible for overseeing all building- related activities to ensure its timely completion according to Client schedule. •Responsible for checking the workmanship of all building-related works and activities to ensure quality according to Client standards. •Responsible for ensuring that all the highlights in the checklist of the Work Authorization are complied with and in accordance to Client safety standards. •Reports any malpractices, non-conformances and unusual occurrences with respect to the conduct of all activities in the project site. •Inspection and completion of all punch list required for the smooth operation and maintenance of the HVAC system Implement safety procedure in every place of work •Make all necessary documentations to be sign off by the client prior to the release or handing over of the whole •Testing and Commissioning, Test and Commission the system as per standard. Show less

    • South Korea
    • Construction
    • 700 & Above Employee
    • HVAC Engineer
      • Mar 2009 - Mar 2011

      •Check duct sizes and sheet thickness in accordance to the required codes and standard as per SMACNA •Inspection of piping system completion prior to painting/insulation, concealment of the whole system to be subjected for hydrostatic, pneumatic and hydraulic pressure test, ducting system and chilled water flow rate i.e. return and supply using applicable measuring equipment/test equipment, etc. •Make all necessary documentations to be sign off by the main contractor and client prior to the release or handing over of the whole HVAC system •Inspection and completion of all punch list required for the smooth operation and maintenance of the HVAC system •Implement safety procedure in every place of work •Measured and estimated the material take –off for the required materials and tools and equipments and other consumables items. •Prepared the Documentation and systematic filing of incoming and out-going documents. •Ensures manpower availability for every building for optimum performance. •Ensures that proper work scheduling in time so as to ensure an uninterrupted work schedule. •Ensures that availability of necessary materials for projects to avoid unnecessary work stoppage and ensure early job completion. •Ensure quality workmanship in every job to be performed. •Responsible for checking the workmanship of all building-related works and activities to ensure quality according to Client standards. •Responsible for ensuring that all the highlights in the checklist of the Work Authorization are complied with and in accordance to Client safety standards. •Testing and Commissioning, Test and Commission the system as per standard. Show less

    • Hong Kong
    • Hospitality
    • 700 & Above Employee
    • Project Engineer
      • May 2006 - May 2008

      •Understand the project need, Projects are either under CAPEX or P&L account. Capex projects are planned 6 months to 1 year before the implementation. While P&L projects are done as and when needed. •Prepare Project Scope of Work; Gather all data that Project Manager’s wants to be done in a certain projects. •Prepare basic outline and brief (to consultants, if necessary), Have a site inspection for the proposed project, show all necessary things that consultant needs to know. •Prepare budgetary estimate, Estimate detailed materials that will be used, Mechanical Works, Fire Protection works and Plumbing works. •Conduct bid evaluation •Supervised the installation of fabricated air ducts as per contract drawing •Coordinate with the engineering disciplines prior to the field adjustments •Supervised the installation of chilled water piping •Supervised the installation of air supply duct and chilled water supply and return pipe •Supervised the installation of air duct and accessories such as air plenum, fire dumper, air mixing chamber , Louver diffuser •Supervised the installation of fan coil units, air handling units and chiller •Installation of chiller pipes process valves •Inspection of HVAC material/equipment arriving on site shall preserved •Inspection of piping system completion prior to painting/insulation, concealment of the whole system to be subjected for hydrostatic, pneumatic and hydraulic pressure test. •Make all necessary documentation to be sign off by the main contractor and client prior to the release or Handling over of the whole HVAC system. •Inspection and completion of all punch list required for the smooth operation and maintenance of the HVAC system •Conduct House Rule briefing before Contractors commencement of work •Punch Listing, List down all the defects of the work, Make a letter or punchlist and send copy to the Contractors. •Testing and Commissioning, Test and Commission the system as per standard. Show less

Education

  • Technological Institute of the Philippines
    Bachelor's degree, Mechanical Engineering
    1999 - 2004

Community

You need to have a working account to view this content. Click here to join now