Ferit iskender
İş Geliştirme ve Teklif Uzmanı at SAMM Teknoloji İletişim A.Ş.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
İngilizce, Eski (yaklaşık 450-1100) -
Topline Score
Bio
Baha Dinler
Ferit is successfull in his work and he will have a value add to the company he is working for.
Saffet Tokar
İşinde tam uzmandır.
Baha Dinler
Ferit is successfull in his work and he will have a value add to the company he is working for.
Saffet Tokar
İşinde tam uzmandır.
Baha Dinler
Ferit is successfull in his work and he will have a value add to the company he is working for.
Saffet Tokar
İşinde tam uzmandır.
Baha Dinler
Ferit is successfull in his work and he will have a value add to the company he is working for.
Saffet Tokar
İşinde tam uzmandır.
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
ISO 9001:2008 Kalite Yönetim Sistemi Revizyonu Bilgilendirme Semineri
TQNet International Training Approval & Personnel Certification BodyDec, 2008- Sep, 2024 -
ISO 9001:2000 KALİTE YÖNETİM SİSTEMİ İÇ DENETÇİ EĞİTİMİ'Nİ BAŞARI İLE TAMAMLAMIŞTIR. HAS SUCCESFULLY COMPLETED THE TRAINING FOR '' ISO 9001:2000 QUALITY MANAGEMENT SYSTEMS ( QMS) INTERNAL AUDITOR''.
JAS-ANZOct, 2008- Sep, 2024 -
Workshop on Accreditation With a Focus on Requirements Related to Quality and Technical Aspects for Testing and Calibration Laboratories
TÜV SÜDMay, 2005- Sep, 2024
Experience
-
SAMM Teknoloji İletişim A.Ş.
-
Türkiye
-
Telecommunications
-
100 - 200 Employee
-
İş Geliştirme ve Teklif Uzmanı
-
Aug 2019 - Present
İş Geliştirme ve Teklif Uzmanı
-
-
E&I QA/QC MANAGER
-
Apr 2016 - Aug 2019
Preparation of QA/QC documantation include quality control plan. Responsible for pre-commisioning test and preperad the test documantation. Preparation of TOP (Turn over Package) folders.
-
-
-
-
E&I QA/QC Şef
-
Nov 2015 - Jan 2016
Preparation of QA/QC documantation include quality control plan. Responsible for pre-commisioning test and preperad the test documantation. Preparation of TOP (Turn over Package) folders. Preparation of QA/QC documantation include quality control plan. Responsible for pre-commisioning test and preperad the test documantation. Preparation of TOP (Turn over Package) folders.
-
-
-
Tekfen Construction
-
Türkiye
-
Construction
-
700 & Above Employee
-
E&I QA/QC Specialist
-
Mar 2014 - Oct 2015
Preparation of QA/QC documantation include quality control plan. Responsible for pre-commisioning test and preperad the test documantation. Preparation of TOP (Turn over Package) folders. Switchgear- Pre-commissioning & Commissioning tests CB Insulation Resistance measurement. CB Hipot test. CB Contact resistance measurement. CB opening & closing time measurement test CB secondary circuits and electric wiring for voltage of up to 1000 V, Measuring insulation resistance. CB Mechanical tests DC resistance of control solenoids Checking minimum voltage of CB activation CT Insulation Resistance measurement. CT Winding Resistance measurement. CT Polarity check. CT RatioCT Knee point measurement test (Magnetizing saturation test). test. VT Insulation Resistance measurement. VT Winding Resistance measurement. VT Ratio test. Earth Switches Contact resistance test (DUCTOR) Busbar AC High voltage testing Busbar insulation resistance testing Busbar Microohm measurement test Primary current injection for overall CT circuits Protective relays testing Bus Transfer Scheme and Relay Intercubicle microohm measurement test Measuring insulation resistance of secondary circuits Synchronizing relay testing Measuring Meters Protection relay coordination with the upstream breaker by secondary injection Control of Generator Circuit breaker Pre Commissioning & Commissioning tests CT Insulation Resistance measurement. CT Winding Resistance measurement. CT Polarity check. CT Ratio test. CT Knee point measurement test (Magnetizing saturation test). VT Insulation Resistance measurement. VT Winding Resistance measurement. VT Ratio test. Surge Arrestor % p.f. Test,insulation resistance test CB Insulation Resistance measurement. CB Hipot test. CB Contact resistance measurement. CB opening & closing time measurement test. CB secondary circuits and electric wiring for voltage of up to 1000 V, Measuring insulation resistance. Earth Switches Contact resistance measurement te
-
-
-
Gama Power Systems
-
Türkiye
-
Construction
-
300 - 400 Employee
-
E&I QA/QC Specialist
-
May 2013 - Mar 2014
Preparation of QA/QC documantation include quality control plan. Responsible for pre-commisioning test and preperad the test documantation. Preparation of TOP (Turn over Package) folders. Able to perform inspections as per the approved ITPs, Experience in the quality inspections of , cable laying (HV, MV, LV) works , power cable insulation resistance tests and continuity tests, cable glanding and termination works, transformer installation and cable connection works, Ability to manage RFIs (request for inspections) and handover the completed works to Client, DC & UPS Systems Pre-commissioning & Commissioning tests 125 V DC Battery Chargers Insulation Resistance measurement. Function test. 230V AC UPS (Inverters) Insulation Resistance measurement. Function test. 125V DC Battery Cell Voltage Battery Discharge test.
-
-
-
ENPRODE
-
Spain
-
Real Estate
-
E&I QA/QC MANAGER
-
Aug 2011 - Jul 2013
Enprode is a sub contractor in OMV CCPP ( Combined Cycle Power Plant) Site. What we are doing in this Project is: Electro mechanic, Lighgting, Fire Fighting and Fire Detection, Instruments, Quality control and Quality Assurance, Commisioning HVAC Enprode is a sub contractor in OMV CCPP ( Combined Cycle Power Plant) Site. What we are doing in this Project is: Electro mechanic, Lighgting, Fire Fighting and Fire Detection, Instruments, Quality control and Quality Assurance, Commisioning HVAC
-
-
-
-
E&I QA/QC Specialist
-
May 2010 - Mar 2011
Turkmenistan/ Turkmenbashi Onshore Gas Refinery Project / Turkmenistan/ Turkmenbashi That one is another work of GAP ın Turkmenistan/ Turkmenbashi . I was also in charge of installation and testing of “Loop Checks”, preparation of test documents. Turkmenistan/ Turkmenbashi Onshore Gas Refinery Project / Turkmenistan/ Turkmenbashi That one is another work of GAP ın Turkmenistan/ Turkmenbashi . I was also in charge of installation and testing of “Loop Checks”, preparation of test documents.
-
-
-
-
E&I QA/QC
-
Dec 2008 - Dec 2009
Project of Samir REFINERY /Morocco / MarrakechThat one is another work of Tekfen in Morocco. I was also in charge of installation and testing of “Loop Checks”, preparation of test documents.
-
-
E&I QA/QC
-
Dec 2007 - Dec 2008
Etand gas pipe line raslaffan to messasid/ QATAR/ DOHAThat one is another work of Tekfen in Qatar. I was also in charge of installation and testing of “Loop Checks”, preparation of test documents.
-
-
E&I QA/QC
-
Jul 2007 - Dec 2007
UMMAN - HARWEEL CLUSTER PIPE LINE/UMMANTekfen is one of the major constructions company. We were dealing with the piping assmbly on shore in Omman. While I was working for this company, my duties include installation and testing of “Loop Checks”, preparation of test documents.
-
-
Education
-
Samsun Nineteen May University
4.2, Electrical and Electronics Engineering -
: Samsun Anatolian High School/Branch:Electric
Electrical and Electronics