Federico Carlini
BIM Consultant at Tétris- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Abilitazione alla professione di Architetto
Ordine degli Architetti di RomaJul, 2020- Nov, 2024 -
Coordinatore per la sicurezza in fase di Progettazione ed Esecuzione (CSP - CSE)
CEFME CTPFeb, 2017- Nov, 2024 -
BIM Manager certificato - UNI 11337-7:2018 - UNI PdR 78:2020
ICMQJan, 2023- Nov, 2024
Experience
-
Tétris
-
Design Services
-
700 & Above Employee
-
BIM Consultant
-
Sep 2022 - Present
Remote BIM Consultant for the new headquarters of Microsoft in Warsaw, Poland.- Developing BIM model LOD 500 based on the architectural designs made available electronically via the ACC cloud;- Management of the BIM models of the Shop Drawings, intended for the production of the Executive and Construction drawings for the construction site;- Realization of parametric and non parametric families, in line with company standards, used within the various models.
-
-
BIM Consultant
-
May 2021 - Aug 2022
BIM consulting for Strip Out works and redesign of the interior spaces of the Hotel Ambasciatori in Rome, historic building consisting of n. 8 floors above ground and n. 2 underground, total sqm. 12,000.00 circa.- Support to the Design Team in the Layout Adjustment phase for the BIM modelling of the Architectural discipline;- Management of the BIM models of the Shop Drawings, intended for the production of the Executive and Construction drawings for the construction site;- Realization of parametric and non parametric families, in line with company standards, used within the various models. Show less
-
-
-
On Electric Charge Mobility
-
Italy
-
Truck Transportation
-
1 - 100 Employee
-
Consulente senior
-
Apr 2022 - Present
-
-
-
AEC3 Digital Solutions
-
Italy
-
Architecture and Planning
-
1 - 100 Employee
-
Co-Founder & BIM Manager
-
Dec 2020 - Present
-
-
-
Rimond Middle East General Contracting LLC
-
United Arab Emirates
-
Construction
-
1 - 100 Employee
-
BIM Consultant on-site
-
Mar 2019 - Dec 2020
BIM Specialist on the construction site, as responsible for the As-Built model for the construction of a prestigious luxury villa in Cheshire, UK. Below is a summary list of the tasks performed during the working period: - As-Built model manager (individual work); - Coordination of the team of the Surveyors/engineers responsible for carrying out the surveys of the work; - Preparation and export of drawings from the BIM As-built model, due to verify the correct execution of the works, submitted to the attention of the different sub-contractor in case of discrepancies in the work carried out and presented to the Client at the end of the work; - Development and management of BIM models (Architectural, Structural and Landscape models) (teamwork); - Export of construction drawings from the BIM Architectural and Structural model for the construction site; - Modeling of bespoke elements, subsequently produced and installed on-site; - Realization of parametric and non-parametric families used in the various models. Show less
-
-
-
RIMOND
-
Italy
-
Construction
-
1 - 100 Employee
-
BIM Consultant
-
Jan 2019 - Mar 2019
- Drafting and Management of the BIM (Architectural Model) (teamwork); - Exports from the BIM Model of quantities for carrying out the metric estimates; - Realization of the parametric families used within the model. - Drafting and Management of the BIM (Architectural Model) (teamwork); - Exports from the BIM Model of quantities for carrying out the metric estimates; - Realization of the parametric families used within the model.
-
-
-
SCHIATTARELLA ASSOCIATI
-
Italy
-
Architecture and Planning
-
1 - 100 Employee
-
BIM Consultant
-
Jan 2018 - Dec 2018
BIM Specialist in an international project "New Headquarters of Ministry of Municipal and Rurals Affair" (MoMRA, Ryadh, Arabia Saudita) as part of the BIM architectural working group, outside the studio, which was exclusively responsible for the drafting and management of the BIM model. Multidisciplinary project that included constant interface with the architectural design team of the studio, and with the other external design teams, responsible for the other disciplines (Structural and MEP). Below is a summary list of the tasks performed during the working period (teamwork): - Drafting and Management of the BIM Model (Architectural Model) (teamwork); - Exports from the BIM Model of quantity for estimative metric calculations; - Production of drawings presented to the Public Authority; - Realization of the parametric families used within the model. Show less
-
-
-
Università degli studi Roma TRE
-
Italy
-
Education Administration Programs
-
700 & Above Employee
-
Assistente al corso: "Tecniche Parametriche di Progettazione"
-
Oct 2017 - Apr 2018
-
-
Education
-
Università degli studi Roma TRE
Laurea Magistrale LM in Progettazione Architettonica, Progettazione Architettonica -
Sapienza Università di Roma
Laurea triennale in Scienze dell'Architettura e dell'Ingegneria edile, Architettura -
ITCG Di Vittorio
Diploma Istituto Tecnico e Professionale, Geometra