FATIN NAJWA CHE JAMIL

Asset Management Engineer at Perpilion (Malaysia) Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Oil and Gas
    • 1 - 100 Employee
    • Asset Management Engineer
      • Jan 2021 - Present

      Project: Provision of SAP Master Data Restoration for Petronas Carigali Turkmenistan (PCTSB)Responsible in performing SAP master data restoration for 85,000 assets. The scope consist of:- Asset Registration and Hierarchy Rebuild- Safety Critical Element identification- Equipment Criticality Assessment- SAP CMMS Master Data Development and Uploading Activity

    • Malaysia
    • Oil and Gas
    • 700 & Above Employee
    • CMMS ENGINEER
      • Oct 2019 - Jul 2020

      PETRONAS GROUP TECHNICAL SOLUTION SDN BHD (Hired/Recruit by PROXSET SDN BHD). Revamp - Asset Management/Hierarchy based on Project for MLNG SATUInvolve in Asset Engineering & Management, Asset Structure Revamp. Develop and update CMMS database including Asset Registration/Hierarchy, by review and update plant structure based on P&ID. Involved in asset revamp for MLNG SATU, restructuring the hierarchy, data clean up for existing and non-existing tags(FL) based on drawing. Fully commit to an asset review meeting to finalize the asset revamp structure with PETRONAS discipline engineer. Successfully finish the asset revamp project for MLNG SATU before dateline.

    • South Korea
    • Construction
    • 700 & Above Employee
    • Graduate Commissioning Engineer
      • Apr 2018 - Apr 2019

      Been honored to be working as an assistant commissioning engineer for Samsung Engineering (EPCC) in Pengerang Integrated Complex. Has been assigned under Petronas Petrochemical Project Package 6 #P6A in the production of 350KTA LLDPE.Fully expose to the petrochemical plant environment and Petronas work ethics at site.Familiar with the Petronas HSE Policy Zeto Rules and manage to implement Petronas Standard of documentation.Responsible in preparing document by implementing Petronas Standard by making permit to work (PTW), job hazard analysis (JHA), procedure and RFI (Request for Inspection) before job commencement which need approval from Petronas.Improved work efficiency of pre-commissioning and commissioning activity by making schedule & planning by reviewing P&ID and assist supervisor in the technical development to be done on time which need to be liase with Petronas. Responsible in issuance of outgoing and incoming document to Petronas such as test report to be submitted daily after test & inspection done at site. Supervised & monitored the pre-commissioning activity such as pressure test, piping cleaning(10-15barg), catalyst loading and commissioning activity such as leak test(25barg), mechanical run test, loading hydrocarbon with various method and procedure needed for every testSuccessfully delivered the job of vendor selection for chemical cleaning & oil lab test activity from starting till end of reports within time and under budget which fulfill Petronas requirement. Preparation of MPCER for material purchasing for commissioning department.Responsible for management of labor such as worker’s work schedule, attendance, training & accommodation.Manage to review whole plant P&ID to list out Blind/Blind Flange and numbering for LOTO for reference of Petronas and licensor INEOS at site by making proper documentation.

    • Malaysia
    • Medical Equipment Manufacturing
    • 300 - 400 Employee
    • TRAINEE PRODUCTION ENGINEER
      • Jul 2016 - Sep 2016

      Assigned to production department as a production engineer which was actively involved in major project to increase production in line speed study while troubleshoots for the defects glove. Studying the process of production of gloves by comparing other factories and making improvement to our productionTroubleshoots for any defect gloves by studying the source of defect and make the corrective actionManage to conduct main projects assigned by manager which was line speed study which has been reported to the head of factory and the issue had been discussed in weekly meeting.Another 2 main project was monitor brush worn out to reduce glove main defect which is leaking gloves and introduced new chemical by using DIY alkaline to reduce usage of former cleaner chemical.

    • Malaysia
    • Retail
    • 200 - 300 Employee
    • Sales Promoter (PART-TIME)
      • Jun 2015 - Sep 2015

      Promoted and communicated with customer to purchase the products by engaging and building the relation with them and provide necessary information related on customer needs.

Education

  • Universiti Teknologi MARA
    BACHELOR HONS IN CHEMICAL ENGINEERING, Chemical Engineering
    2013 - 2017
  • KOLEJ MATRIKULASI KEDAH
    Biology/Biological Sciences, General, 3.83
    2012 - 2013
  • SMK SULTANAH ASMA
    SECONDARY SCHOOL, SCIENCE
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now