Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Power System Engineer
      • Jan 2021 - Present

    • Türkiye
    • Transportation/Trucking/Railroad
    • 1 - 100 Employee
    • Power System Senior Engineer
      • Oct 2015 - Dec 2020

      - Ardahan Kotanlı, Günyazı, Pozantı, Tarsus 154 kV Substation Primary and Secondary Tests - Ladik Akçansa Çimento 154 kV Substation Primary, Secondary Tests and commisioning- Irak Ronaki Substation panels Factory Acceptance Test- 154kV Küçükköy feeder Tests and commisioning - Adana Araplı, Ulukışla, Bor 154 kV And 27,5 kV Substation Primary ve Secondary Tests - Afganistan Gölbahar Substation panels Factory Acceptance Test - Exergy GCPP generator protection panels Factory Acceptance Test- Unimar 380kV Substation Gelibolu feeder Primary and secondary tests - Eti Soda 154kV Substation Beypazarı and Trafo-E feeders Primary, Secondary tests and Commisioning - Hamitabat CCPP 380kV Substation C03-C20 feeders Primary, Secondary tests and Commisioning- Soran & Ronkay 132/33kV Substation (Iraq) Primary, Secondary tests and Commisioning- Ortaklar 154kV Substation (Protection, Control & 61850 Scada System Design)- Bursa GIS 154kV Substation (Protection, Control & 61850 Scada System Design)- Garri-3 GCPP (Sudanese) Electrical System Engineering Design- Akyaka-Merzifon 154kV Substation (Protection, Control & 61850 Scada System Design)- Gezende HEPP Generator Protection & Control System Rehabilitation- Yeniköy - Kemerköy Thermal Power Plant HV-MV-LV System Rehabilitation Projects- RADES GCPP Transformer Protection System Design (Tunusia)- MİS-3 JES 154kV Substation (Protection, Control & 61850 Scada Systems Design)- Faizabad HEPP (Afghanistan) Electrical System Engineering Design- Telafer, Adaya, Al-Tabadul, Telawenat 132kV Substations (Iraq) (Protection, Control & 61850 Scada Systems Design)- Hayrabolu 154kV Substation (Protection, Control & 61850 Scada Systems Design)- Iraq 132/33kV Mobile Substation Design- Yalova RES 154kV Substation (Protection, Control & 61850 Scada System Design)- Adadağı HEPP Generator Excitation System Design- Tedzani Power Plant (Malavi) Electrical System Engineering Design- Eti Kırka Generator Excitation System Design

    • Electrical Maintaince engineer
      • Dec 2012 - Feb 2015

      Borçka Hidroelektrik Santrali ( 2x150 MW )- HES Çalışma Prensipleri, Elektrik Bakım Onarım Çalışmaları, Scada ve Otomasyon Sistemleri,- Şalt Sahası, Trafo, Jeneratör, Kesici, Ayırıcı, vb. YG/OG sistemlerinin bakım ve onarımının çalışmaları.- CCTV, Yangın Algılama, Honeywell, Merkezi Telefon Sistemi vb. AG sistemlerinin bakım ve onarımının çalışmaları.- Santral Binası, Baraj Gövdesi ve Çevre Aydınlatma Sistemlerinin bakım ve onarım çalışmaları.- Santral Akü, UPS Sistemi, Dizel Jeneratör, Seyyar Jeneratör vb. sistemlerin bakım ve onarım çalışmaları.- Santral ve Kontrol Binası Klima sistemlerinin bakım ve onarım çalışmaları.- Santral Revizyon (3 yıllık bakım ve onarım) Faaliyetleri

Education

  • Karadeniz Teknik Üniversitesi
    Elektrik ve Elektronik Mühendisliği, 2.57
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now