Farouk Abdool

Director of Facilities Management at The Silvercrest Center for Nursing and Rehabilitation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
New York, New York, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Hospitals and Health Care
    • 1 - 100 Employee
    • Director of Facilities Management
      • Jul 2009 - Present

      Direct the overall operation of the Engineering, Housekeeping and Security departments in accordance with current federal, state and local standards, guidelines and regulations and to ensure that the Nursing Home is maintained in a safe and comfortable manner. Responsible for maintaining both the Capital and Operating budgets for the Facilities Management Department. Operating the 400 kilowatt co-generation plant and optimizing its efficiency. Serve as the Safety Officer; accountable for emergency management, life safety, safety, security, and regulatory compliance. Show less

    • Higher Education
    • 700 & Above Employee
    • Maintenance Supervisor
      • Nov 2008 - Jul 2009

      Supervised the operations and maintenance of the Central Heating Plant and the Central Refrigeration Plant. Assisted in coordinating efforts to integrate the construction of a new cogeneration plant with the existing power plant for a total power output of 13 megawatts. Implementing the training for the operations and maintenance staff and planning all preventive maintenance work orders Supervised the operations and maintenance of the Central Heating Plant and the Central Refrigeration Plant. Assisted in coordinating efforts to integrate the construction of a new cogeneration plant with the existing power plant for a total power output of 13 megawatts. Implementing the training for the operations and maintenance staff and planning all preventive maintenance work orders

    • United States
    • Hospitals and Health Care
    • 300 - 400 Employee
    • Director of Plant Operations
      • Jul 2004 - Sep 2008

      Directed the overall operation of the Plant Operations Department in accordance with current federal, state and local standards, guidelines and regulations and to ensure that the Nursing Home is maintained in a safe and comfortable manner. Planned, designed and implemented various projects that met the needs of the facility. Maintained both the Capital and Operating budgets for the Plant Operations Department. Implemented the training for the Plant Operations staff and planned all preventive maintenance work orders. Show less

    • United States
    • Hospitals and Health Care
    • 700 & Above Employee
    • Assistant Director of Engineering
      • Dec 2002 - Jul 2004

      Responsibilities included the development, organization, and direction of the overall operation of the Engineering/Maintenance Department in accordance with current federal, state and local standards, guidelines and regulations and to ensure that the Main Hospital and the Nursing Home are maintained in a safe and comfortable manner. Conduct energy saving studies and implement measures to help the facility to operate more efficiently. Responsible for the training of the Engineering/Maintenance staff and planning all preventive maintenance work orders Show less

    • United States
    • Environmental Services
    • 700 & Above Employee
    • Maintenance Planner
      • Jul 2002 - Dec 2002

      Planned all maintenance and boiler outage scopes. Supervised and coordinated the mechanics and the I&C technicians. Implemented the preventative maintenance schedules for various equipment Planned all maintenance and boiler outage scopes. Supervised and coordinated the mechanics and the I&C technicians. Implemented the preventative maintenance schedules for various equipment

    • Oil and Gas
    • 1 - 100 Employee
    • Maintenance Engineer
      • Jun 1999 - Jun 2002

      Planned and executed the engineering work scopes in a timely manner within budgetary guidelines. Supervised and directed the Ultrasonic Testing of all the pressure parts in the boilers. Performed a condition assessment of all boiler components and gave recommendations and estimated cost and life expectancy of certain pressure parts Planned and executed the engineering work scopes in a timely manner within budgetary guidelines. Supervised and directed the Ultrasonic Testing of all the pressure parts in the boilers. Performed a condition assessment of all boiler components and gave recommendations and estimated cost and life expectancy of certain pressure parts

Education

  • State University of New York Maritime College
    Mechanical Engineering
    1994 - 1999
  • Rochester Institute of Technology

Community

You need to have a working account to view this content. Click here to join now