Farid Ramadhani
ME Field Supervisor at PT. Jaya Obayashi- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Indonesian Native or bilingual proficiency
-
English Professional working proficiency
-
Javanese Native or bilingual proficiency
Topline Score
Bio
Credentials
-
Ahli Muda K3 Kontruksi dan Bangunan
Kementerian Ketenagakerjaan Republik IndonesiaJun, 2022- Nov, 2024 -
Drafting And Drawing Using CAD System
Badan Nasional Sertifikasi ProfesiAug, 2021- Nov, 2024
Experience
-
PT. Jaya Obayashi
-
Indonesia
-
Construction
-
1 - 100 Employee
-
ME Field Supervisor
-
Apr 2022 - Present
MEP Field Supervisor in Microsoft Data Center Project, responsible in Mechanical, Electrical, Plumbing work but especially in Security System and Telecommunication. • Manage and coordination with 8 subcontractors with more than 800 manpower for MEP construction at site based on approval material, shop drawing, and scheduleq. • Supervise MEP construction work everyday 24/7 such as construction of Duct Bank Telecommunication LV MV electrical, CCTV, Radio Over Internet Protocol, Plumbing, Earthing system, and Security System. • PIC of Beneficial Use Room Readiness and Mockup of HAC Data Hall that responsibility to manage all subcontractor work on that area that will be first handover to client. Show less
-
-
-
Nafarly
-
Indonesia
-
Retail Apparel and Fashion
-
Co-Owner
-
Jan 2016 - Present
Nafarly is my small business that produces uniforms such as shirts, t-shirs, pants and jacket with custom design. As a co owner of small business, i manage the business form looking for customer, managing finances to managing production. Photo below is an example of the production from Nafarly Konveksi Nafarly is my small business that produces uniforms such as shirts, t-shirs, pants and jacket with custom design. As a co owner of small business, i manage the business form looking for customer, managing finances to managing production. Photo below is an example of the production from Nafarly Konveksi
-
-
-
-
Mechanical Electrical Inspector
-
Nov 2021 - Mar 2022
- Supervise maintenance Flood Pump Station at Sampang, Madura, East Java. - Inspection rewinding electromotor, power cable of pump, selenoid valve of hydraulic sluice gate, installation cctv, and overhaul Genset 600kVA.- Responsible make daily, weekly, and monthly report.- Responsible update BoQ after Mutual Check 0 and Mutual Check 100.
-
-
Mechanical Engineer Assistant and Drafter
-
Feb 2021 - Nov 2021
•Assisting project leader survey and collcet data at project site•Drawing Detail Engineering Design replace pump at flood pump station in Surabaya•Drawing Detail Engineering Design installation cubicle 20kV at flood pump station in Surabaya•Presenting Detail Engineering Design to clients•Responsible to create BoQ, Engineering estimate, and owner estimate.
-
-
-
PT Torishima Guna Indonesia
-
Indonesia
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Research Intern
-
Feb 2021 - Jul 2021
Research centrifugal pump modification from closed impeller to semi open impeller wrap angle blade - Analysis peformance using computational fluid dynamics (CFD) - Stress Analysis of impeller material using finite element method (FEM) Numerical Study of Modification Centrifugal Pump Closed Impeller 80x65-250 To Semi Open Impeller Research used for my undergraduate thesis. Research centrifugal pump modification from closed impeller to semi open impeller wrap angle blade - Analysis peformance using computational fluid dynamics (CFD) - Stress Analysis of impeller material using finite element method (FEM) Numerical Study of Modification Centrifugal Pump Closed Impeller 80x65-250 To Semi Open Impeller Research used for my undergraduate thesis.
-
-
-
PT Torishima Guna Indonesia
-
Indonesia
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Project Engineer Intern
-
Oct 2020 - Dec 2020
Intern at Enginerring Department •One month traning in all division (molding, casting, machining, assembly, testing, and quality control) •Join engineering team to research and development mobile flood control pump •Drawing out in detail locations of pump and engine that will be used for research and development •Assembly and trial mobile flood control pump at pefromance test unit •My mobile flood pump design was approved and used for presentation and project tender to Direktorat Jendral Sumber Daya Air DKI Jakarta Show less
-
-
-
PPSDM Migas
-
Indonesia
-
Oil and Gas
-
1 - 100 Employee
-
Operations and Maintenance Engineer Intern
-
Sep 2020 - Sep 2020
Intern at Boiler and Utility Refinery unit •Monitoring water pump of cooling tower (Temperatur, Vibration, Capacity, Current, Voltage) •Helping predictive maintenance boiler and cooling tower •Analysis performance hot water pump of cooling tower with efficiency result 30.9 % I picked "Performance Analysis of Hot Water Pump (P310/2) in Cooling Tower at Pusat Pengembangan Sumber Daya Manusia Minyak dan Gas Bumi Cepu" as my summary report's title. Intern at Boiler and Utility Refinery unit •Monitoring water pump of cooling tower (Temperatur, Vibration, Capacity, Current, Voltage) •Helping predictive maintenance boiler and cooling tower •Analysis performance hot water pump of cooling tower with efficiency result 30.9 % I picked "Performance Analysis of Hot Water Pump (P310/2) in Cooling Tower at Pusat Pengembangan Sumber Daya Manusia Minyak dan Gas Bumi Cepu" as my summary report's title.
-
-
-
PT Pertamina (Persero)
-
Indonesia
-
Oil and Gas
-
700 & Above Employee
-
Inspection Engineer Intern
-
Jun 2019 - Jul 2019
Intern at Stationary and Statutory Inspection Engineer. •Helping inspection equipment before and after maintenance •Analysis crack of pressure vessel 34-A-103-V-101 at Low Pressure Recovery Unit •Determining the best methodology for repairing pressure vessel leaks caused by caustic stress corrosion cracking •Helping Non Destructive Test (Thickness Test) on floating roof of pertalite storage tank •Helping water pressure test of Globe Valve before instalation •Helping inspection and Non Destructive Test (Thickness Test) of fire hose replacement I picked "Repair Analysis of Pressure Vessel(34-A-103-V-101) Leak on Low Pressure Recovery Unit at PT. Pertamina RU VI Balongan" as my summary report's title. Show less
-
-
Education
-
Institut Teknologi Sepuluh Nopember Surabaya
Bachelor of Applied Engineering, 3.3 out of 4.00 -
SMAN 2 Surabaya
Natural Sciences