Farhan Sharif
Technical Manager(Civil) at Holloway Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Malay Native or bilingual proficiency
-
English Professional working proficiency
Topline Score
Bio
Credentials
-
Employee of the month
AS White GlobalOct, 2021- Nov, 2024 -
Autodesk AutoCAD User Certification
AutodeskJul, 2021- Nov, 2024 -
Graduate Engineer
Board of Engineers MalaysiaMar, 2021- Nov, 2024 -
Green Card
CIDB Malaysia
Experience
-
Holloway Group
-
Australia
-
Design Services
-
1 - 100 Employee
-
Technical Manager(Civil)
-
Aug 2022 - Present
-
-
Civil Engineer
-
Aug 2021 - Aug 2022
-
-
-
AS White Global
-
Australia
-
Staffing and Recruiting
-
500 - 600 Employee
-
Technical Manager (Civil)
-
Aug 2022 - Present
-
-
Civil Engineer
-
Aug 2021 - Aug 2022
-
-
-
GEO - Ground Engineering Operations
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
Technical Consultant Engineer (Level 2)
-
Jul 2020 - Aug 2021
•Assist geotechnical investigations and provide recommendations prior to start the drilling works.•Provide technical support and consultancy for deep foundation companies in the use of synthetic stabilization slurry.•Assisting clients technically in improving soil stabilization, problem solving, increasing production and frequently negotiate to ensure requirements are met.•Actively engaged in daily meeting, generate potential ideas, and propose suggestions through presentation to client’s personnel including Project Manager, Engineers, Supervisors and general workers to mitigate issues related to work areas.•Monitor and supervise sub-ordinates in executing works in multiple site locations.•Identify problems encountered and solution planning towards soil stabilization.•Involved in the constructions of deep foundations including bore piling, diaphragm walls and debonding piles with short casings.•Check field data, prepare and submit engineering logs and records to analyze.•Generate product consumption budget and analysis to avoid over consumption at end of projects.•Ensure the laboratory testing methods and application of results including the scheduling of tests are standardized.•Provide technical consultancy services to project or client teams.•Log issues and obstacles on weekly basis.•Recommend ideas and brainstorming possible solutions for critical issues with director and technical team leader.•Generate reports on the problems encountered and present them to the clients on what approach to be taken.•To prepare checklists and ensure tasks executed are according to SOP as a safeguard.•Design batching plants set up/geological ground models and preparing layouts using Sketchup 3D and AutoCAD to assist clients on site organizational.•Accomplished second level of Technical Consultant within a year
-
-
Technical Consultant Engineer (Level 1)
-
Jul 2019 - Jul 2020
Provide technical consulting to the client by doing analysis of work progress and support on site, specializing in soil stabilization for deep foundations including borepile and Dwall
-
-
-
MMC Corporation Berhad
-
Malaysia
-
Investment Management
-
100 - 200 Employee
-
Project Engineer
-
Jul 2016 - Dec 2016
•Manage, design, develop and maintain small-scale to large-scale construction projects in a safe and timely manner•Conduct on site investigations and analyze data through lab testing, preparing reports and interpret/understand drawings (construction, shop and as built)•Carry out technical and feasibility studies that satisfy technical specifications•Assess potential risks, materials, and costs involved•Provide advice and resolve any emerging problems in terms of technical or on site.•Oversee and supervise staff and sub-ordinates and liaise with a variety of stakeholders (architects, landscapers, consultants)•Monitor work progress and compile reports•Manage budget and purchase equipment/materials•Comply with guidelines and regulations including permits, safety etc and deliver technical or system documentation as required•Develop inspection list to ensure all tasks executed are according to specifications.
-
-
-
KELLER
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Project Engineer
-
Nov 2015 - Jun 2016
•Communicate with stakeholders including engineers, foremen, and supervisors to ensure full understanding of the information provided prior work execution•Inspect completed works as required by the specification•To manage the installation of temporary works and safety on site•Preparation of method statements and risk assessments as required•Keep a full and accurate daily site diary•Ensure that proper records are kept and carefully filed. •Communicate with stakeholders including engineers, foremen, and supervisors to ensure full understanding of the information provided prior work execution•Inspect completed works as required by the specification•To manage the installation of temporary works and safety on site•Preparation of method statements and risk assessments as required•Keep a full and accurate daily site diary•Ensure that proper records are kept and carefully filed.
-
-
-
-
INTERN
-
Jul 2013 - Sep 2013
•Assigned as a site supervisor for the construction of the maintenance hall building for Prasarana of the LRT project in Ara Damansara.•Monitor the operation and maintenance of the infrastructure of the hall building including water tank, water system, drainage, and M&E. •Checking and making inspections on every works carried out on site •Ensure all works carried out on site were according to specifications and timeline given.•Interpret drawings and handle the works on site properly to ensure quality and safety are achievable.
-
-
Education
-
Universiti Teknologi MARA
Bachelor's degree, Civil Engineering -
Universiti Teknologi MARA
DIPLOMA IN CIVIL ENGINEERING, Civil Engineering -
Mara Junior Science College (MRSM)
SPM, SCIENCE