Farhad Farimanpour

Deputy technical and implementation at Khatam University
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tehran, Tehran Province, Iran, IR
Languages
  • English Full professional proficiency
  • Persian Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certificate in Value Engineering – level 1
    -
    Jan, 2005
    - Oct, 2024
  • • Strategic Management and System Design
    -
    Jan, 2005
    - Oct, 2024

Experience

    • Iran
    • Higher Education
    • 1 - 100 Employee
    • Deputy technical and implementation
      • May 2023 - Present
    • Engineering Project Manager
      • Sep 2022 - May 2023

      Khatam university Planing, mobilizing and supervising the engineering phase of Khatam university campus including 500000 sqm buildings and facilities, 50 acres of landscap, greenery and infrastructure. Khatam university Planing, mobilizing and supervising the engineering phase of Khatam university campus including 500000 sqm buildings and facilities, 50 acres of landscap, greenery and infrastructure.

    • Head Of Design
      • Dec 2021 - Mar 2022

      Gorgan Cancer Center Completed a 35000 sqm healthcare facility's Preliminary design as a head of design including planning, architectural design, structural and MEP. coordination. Gorgan Cancer Center Completed a 35000 sqm healthcare facility's Preliminary design as a head of design including planning, architectural design, structural and MEP. coordination.

    • Head Of Engineering
      • Dec 2019 - Oct 2021

      Iran Mall Complex Reviewed and supervised different level of design and technical coordination of a 1.2 million sqm. shopping mall in collaboration with consulting firms and contactors ,endorsement of final design blueprints and submission of construction drawing according to project's specifications as a head of engineering as well. Reviewed and verified technical documents handed out by suppliers as an authorized member of procurement committee. Iran Mall Complex Reviewed and supervised different level of design and technical coordination of a 1.2 million sqm. shopping mall in collaboration with consulting firms and contactors ,endorsement of final design blueprints and submission of construction drawing according to project's specifications as a head of engineering as well. Reviewed and verified technical documents handed out by suppliers as an authorized member of procurement committee.

    • Head Of Engineering
      • Oct 2017 - Dec 2019

      Iran Mall five star Hotel {Fairmont) delivered full package of Coordinated Interior, MEP, Security, F&B, ... in collaboration with dozen of international design houses. Had Accor technical team as a consultant let us take our game to the next level. As a result we completed and endorsed the design final package of Fairmont Iran Mall Hotel. 170000 Sqm, five star hotel with 359 suites , 13 F&B outlets, wellness center , youth club, meeting rooms, banquet hall and amphitheater of 2000 seats by having 6 technical workshops with Accor team and more than 100 meetings with our consultants and their design teams. Show less

    • Senior Project Manager
      • Feb 2016 - Sep 2017

      Mashhad Mall Complex completed design review of preliminary drawings, endorsed more than 11000 detail design document and drawing for 550000 sqm. mixed use complex. negotiated technically, verified suppliers and construction team documents in more than 200 meetings on site as a result of a fast track project. coordinated 10 different technical teams in house in weekly meetings for over a year to discuss, review, verify and approve final documents and drawings. Mashhad Mall Complex completed design review of preliminary drawings, endorsed more than 11000 detail design document and drawing for 550000 sqm. mixed use complex. negotiated technically, verified suppliers and construction team documents in more than 200 meetings on site as a result of a fast track project. coordinated 10 different technical teams in house in weekly meetings for over a year to discuss, review, verify and approve final documents and drawings.

    • Urban Designer
      • Aug 2015 - Mar 2016

      Holor-Dargahan rehabilitation plan proposed a unique approach to design the master and development plan of 300 hectares Holor-Dargahn neighborhood in Qeshm island concentrated to turn the whole area into a lively district as an urban designer. Holor-Dargahan rehabilitation plan proposed a unique approach to design the master and development plan of 300 hectares Holor-Dargahn neighborhood in Qeshm island concentrated to turn the whole area into a lively district as an urban designer.

    • Senior Project Manager
      • Jun 2015 - Mar 2016

      Green Fiber Industries Based on a patented German design Technology we delivered full package of detail design documents fully coordinated. Moreover; ran a value engineering review, because of the level of underground waters and soil mechanic issues. Green Fiber Industries Based on a patented German design Technology we delivered full package of detail design documents fully coordinated. Moreover; ran a value engineering review, because of the level of underground waters and soil mechanic issues.

    • Senior Project Manager
      • Sep 2005 - Apr 2015

      Delivered most divers projects in almost ten years as a project manager usually running a huge team in house. Hezar-o Yek Shahr Cultural and Recreational Complex .Tehran (under construction); 1,400,000 m2 including theme park (400,000 m2), entertainment street (150,000 m2), art center (10,000 m2), show room (1,500 m2), car city (35,000 m2), multi-story car park (300,000 m2),operational support unit 10,000 m2 (project Manager) •Nargess Five Star Hotels, Mashhad (under construction); 550,000 m2 (Technical coordinator & construction project manager) •Mashhad International Financial and Economic Centre (MIFEC) – Mashhad 130,000 m2 (Technical coordinator & Project manager) •Khuzestan Regional Power Department-Central Office - Ahwaz 30,000 m2 (Technical coordinator & construction Project manager) •Hanieh Accommodation/Commercial Complex - Mashhad (completed); 20,000 m2 (Technical coordinator & Head of construction) •Ofogh Multi-functional Complex – Tehran (completed); 600,000 m2 (Technical coordinator ) Show less

    • Architect/Urban designer
      • Nov 2008 - Sep 2011

      Golbahar City Centre (Phase 2) Design and delivered the master and development plan for central district of city of Golbahar in a size of 1000 hectares. Abshar Residential-Commercial District Proposed a conceptual diagram for 50 hectares of Abshar district based on master and development plan of the area. Golbahar City Centre (Phase 2) Design and delivered the master and development plan for central district of city of Golbahar in a size of 1000 hectares. Abshar Residential-Commercial District Proposed a conceptual diagram for 50 hectares of Abshar district based on master and development plan of the area.

    • Site Manager
      • Apr 2005 - Nov 2005

      Arvand Salt Refinery complex Finalized site mobilization process for this complex as a site manager. Arvand Salt Refinery complex Finalized site mobilization process for this complex as a site manager.

    • Assistant Project Manager
      • Aug 2001 - Apr 2005

      Mashhad Light Rail Transit System ِDelivered 22 metro stations (200,000 m2), central warehouse (4,000 m2), operational support unit for repair and maintenance (30,000 m2) design in collaboration with eight consulting firms and 20 contractors in a full package as well as finishing the construction phase and hand over process to operator. Mashhad Light Rail Transit System ِDelivered 22 metro stations (200,000 m2), central warehouse (4,000 m2), operational support unit for repair and maintenance (30,000 m2) design in collaboration with eight consulting firms and 20 contractors in a full package as well as finishing the construction phase and hand over process to operator.

    • Architect/Assistant project manager
      • Mar 1997 - Aug 2001

      Hashemieh & Daneshjoo light rail transit stations proposed, developed and completed architectural, spatial, formal concept design of these two stations as well as architectural detailing as a designer and assistant project manager. Hashemieh & Daneshjoo light rail transit stations proposed, developed and completed architectural, spatial, formal concept design of these two stations as well as architectural detailing as a designer and assistant project manager.

    • Architect
      • Apr 1995 - Feb 1997

      Venice school of Architecture Prepared a full set of diagrams regarding urban design and architectural ideas. designed the layout of final document. Maryam Salour's villa developed the architectural concept throughout preliminary and detail design phase. karaj social housing proposed and developed site plan and landscape concept of 1000 social housing unit. spencer chiu residential Bldg. proposed and developed the spatial and formal concept of this luxurious residential building in Taiwan. Show less

Education

  • Faculty of Art and Architecture-Tehran Azad Uni. central branch
    M.A, Architecture
    1993 - 2000
  • Alborz high school
    High school Diploma, Mathematics
    1989 - 1993

Community

You need to have a working account to view this content. Click here to join now