Falah Hassan

TA electrical engineer at Baghdad comp.LTD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
IQ
Languages
  • English -
  • French -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oil and Gas
    • 100 - 200 Employee
    • TA electrical engineer
      • 2007 - Present

  • MHPS (Mistubishi Hitachi Power Systems)
    • Badra-project /Instalation of 5 units H25 .units A.B.C.D.E /
    • TA Electrical engineer.
      • Dec 2016 - May 2017

      • Responsibility: Testing and commissioning the MHPS equipment, Generator. Generator protections relay G60 .Generator exciter VCS 6000.Battery chargers. .Dry loop checks, Motors AC & DC commissioning, continuity check, insulation check • Responsibility: Testing and commissioning the MHPS equipment, Generator. Generator protections relay G60 .Generator exciter VCS 6000.Battery chargers. .Dry loop checks, Motors AC & DC commissioning, continuity check, insulation check

  • Baghdad Company for Gas turbines
    • Al-hydaria power plant (4*125 MW).
    • Electrical department manager.
      • Jun 2014 - Jun 2016

      • Supervise installation of cable trays, conduit pipes, pulling cable and cable termination (power & control). • Installation of the turbine control center (PEECC) and motor control center (MCC) equipment • Install the filter house unit. • Install the other auxiliary skids • Testing and commissioning the GE equipment, Generator. Generator protection relay G60 .Generator exciter EX2100 .Dry loop checks, Motors AC & DC commissioning, continuity check, insulation check…… • BOP .Black start diesel generator. Emergency diesel generator .MV&LV switchgears .LDO & HFO pump……etc.

  • Baghdad company for Gas turbines Ltd/Ministry of electricity/Basra-Najibiya
    • Ministry of electricity/Basra-Najibiya /Installation of 4 Frame -9E units 53.54.
    • TA Electrical engineer.
      • Jan 2014 - Jun 2014

      Underground earthing network, grounding system, lighting protection of different instruments, inspection of electrical instruments, ducts and galleries work related to the cabling and execution of different activities according to the site requirements Underground earthing network, grounding system, lighting protection of different instruments, inspection of electrical instruments, ducts and galleries work related to the cabling and execution of different activities according to the site requirements

    • site manager.
      • Apr 2013 - Jan 2014

      upgrading Turbine control system for turbo pumps to MK Vie.

    • TA Electrical engineer
      • Jun 2012 - Mar 2013

      complete installation of GE-10 unit.• Testing and commissioning the GE equipments, Generator controls (Prismic A30 AVR). & Generator protection relay IGPS (Beckwith M-3425A) .Dry loop checks, Motors AC & DC commissioning, continuity check, insulation check……

  • : Baghdad Company for Gas turbines Ltd.
    • power generation for Iraqi national fertilizer-Basra.
    • TA Electrical engineer.
      • Apr 2011 - May 2012

      Installation of two Frame-5 Units 1&2. • Testing and commissioning the GE equipment, Generator controls (Prismic A10 AVR). & Generator protection relay (G60) .Dry loop checks, Motors AC & DC commissioning, continuity check, insulation check…… Installation of two Frame-5 Units 1&2. • Testing and commissioning the GE equipment, Generator controls (Prismic A10 AVR). & Generator protection relay (G60) .Dry loop checks, Motors AC & DC commissioning, continuity check, insulation check……

  • Baghdad Company for Gas turbines Ltd
    • Old Mulla Abdulla power station/Iraq-Kirkuk.
    • TA Electrical Engineer.
      • Jul 2009 - Mar 2011

      New Control System Upgrading Project/ Frame-5 (GT-1 , 2 ,4,6,7, 12). • Replacement of GE control system from MKII to MKVIe control system. • Furnish MKVIe with the required signals. • Commissioning tests for BECKWITH M-3425A generator protection relay. • Commissioning tests for Basler DECS-200 & 300 AVR Excitation system. • Commissioning tests for 745 GE Transformer protection relay. • Commissioning tests for 52G & 52L. • Commissioning tests for MCC. New Control System Upgrading Project/ Frame-5 (GT-1 , 2 ,4,6,7, 12). • Replacement of GE control system from MKII to MKVIe control system. • Furnish MKVIe with the required signals. • Commissioning tests for BECKWITH M-3425A generator protection relay. • Commissioning tests for Basler DECS-200 & 300 AVR Excitation system. • Commissioning tests for 745 GE Transformer protection relay. • Commissioning tests for 52G & 52L. • Commissioning tests for MCC.

  • Baghdad Company for Gas turbines
    • Al-qudus power plant (Baghdad). Installation of two Frame-9E Un
    • TA Electrical engineer
      • Apr 2007 - Jun 2009

      Installation of two Frame-9E Units 9 &10. • Supervise installation of cable trays, conduit pipes, pulling cable and cable termination (power & control). • Installation of the turbine control center (TCC) and motor control center (MCC) equipments • Install the filter house unit. • Install the other auxiliary skids. • Testing and commissioning the GE equipments, Generator. Generator protection relay G60 .Generator exciter EX2100 .Dry loop checks, Motors AC & DC commissioning, continuity check, insulation check

    • Project manager.
      • May 2006 - Mar 2007

      Working in construction and erection of electrical equipment of substation 33/11 KV .in Aldiwaniya city. Working in construction and erection of electrical equipment of substation 33/11 KV .in Aldiwaniya city.

    • Electrical site engineer.
      • Sep 2005 - Apr 2006

      execution of electrical projects. Underground feeders, overhead feeders’ .kiosks transformers.

    • Electrical site engineer.
      • Nov 2004 - Aug 2005

      Rehabilitation of SDMO power plants in Baghdad, Mosul, Basra…

  • French company for Diesel Power Plant in Iraq (SDMO).
    • Baghdad.Mosul.Basra.Kut.Salah eldin....all city.
    • Electrical site engineer.
      • Oct 2003 - Oct 2004

      Maintenance and operating the power plants (12 MW) in Iraq. Maintenance and operating the power plants (12 MW) in Iraq.

Education

  • B.Sc. Electrical Engineering / University of Nancy (France 1987).
    B.Sc. Electrical Engineering / University of Nancy (France 1987)., University of Nancy (France 1987).
    2016 - 2020
  • MHPS ( MITSUBISHI HITACHI POWER SYSTEMS).JAPAN
    H25 power plant
    2011 - 2011
  • GE (General electric) .New york.USA
    GE power generation
    2008 - 2008
  • GE .Amman office
    EHS
    2007 - 2007

Community

You need to have a working account to view this content. Click here to join now