Fakhrul Izzuddin Dolah (FID)

Senior Piping Integrity Engineer at PETRONAS Carigali (Turkmenistan) Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Terengganu, Malaysia, MY
Languages
  • English Professional working proficiency
  • Malay Native or bilingual proficiency
  • Arabic Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Shahrulnizam Hanafi

Fakhrul is a good mechanical instructor, especially in the oil & gas field. He always brings brilliant ideas with up to date on methods and technology. He also has strong leadership capabilities. Great to be a part of the team member.

KHAIRIL ANUAR AB LATIF

Excellent and effective character. Experienced offshore engineer. Able to handle multiple task. Good communication and technical skills. Highly recommended for hiring.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • HRDF Certified Professional Trainer
    Malaysian Institute of Management (MIM)
    Oct, 2019
    - Nov, 2024
  • Pearson EdExcel Lvl 3 in Assessing Competence in the Work Enviroment, QCF (BTEC Internal Assessor)
    Pearson UK
    Apr, 2016
    - Nov, 2024
  • Pearson EdExcel Lvl 4 in The Internal Quality Assurance of Assessment Processes and Practice, QCF (BTEC Internal Verifier)
    Pearson UK
    Apr, 2016
    - Nov, 2024
  • Level I Machine Lubricant Analyst (MLA)
    International Council for Machinery Lubrication (ICML)
    Oct, 2020
    - Nov, 2024
  • Teaching Licenses: Special Permissions
    Kementerian Pendidikan Malaysia
    May, 2016
    - Nov, 2024

Experience

    • Turkmenistan
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Piping Integrity Engineer
      • Jan 2021 - Present

      Cluster PTS3 - CONSTRUCTION ENGINEERING (Construction Project Management & Piping Integrity) • Lead the Strategic Initiatives for uphold the integrity of Process Piping for PETRONAS Asset via BFJI, FFS, FDP, FIP and ALES study approach and ensure Audit Closure - MCF9, IOAIA, OSRMS, IAP in each project. • Led the implementation of PETRONAS Technical Guideline for Mechanical Joint Integrity (MJI) at Upstream Malaysia Asset. Collaborating with GTS expert, the effort led to PETRONAS Staff been trained & certified as competent JIT person for the plant SD/Non-SD Task with significant impact Zero LOPC achievement on top RM100k training fees cost avoidance. • Implement of assessment, inspection and propose maintenance for the piping reported defect via Topside Major Maintenance (TMM), Construction Work Request (CWR), Turnaround (TA), First Line Maintenance (FLM) and any study/assessment approaches in ensuring asset integrity, reliability by means of good engineering and maintenance practices within unit maintenance cost budget, schedule and in full compliance with company’s HSE requirements. • Attend the CWR (Const. Work Request) and define the Risk Assessment for measure impact before proposing the piping system maintenance solution method through syndication with Operation and Inspection team • Establish Piping System Database including (VRD – Valve Reliability Database, PSI - Piping System Index) in improves the standard governance of each piping components through all essential data process captured & written in Databank. With the data analytics (descriptive), piping integrity's issue pattern, trending and correlation provide an insight for enabling Engineer to come out with quick solution for its Piping Integrity Program (PIP). • Perform the DDA (Due Diligent Authority-MPM Audit/Assessment) to renew PSC Contract prior expired, attend the Site Technical Queries by Contractor for each asset strategic approach by Asset Cluster of Oil, Gas and Terminals facilities Show less

    • Malaysia
    • Oil and Gas
    • 100 - 200 Employee
    • Mechanical Engineering Instructor (Terengganu, Malaysia)
      • 2016 - 2020

      Support competency-based & technical development for PETRONAS's Engineer, Specialist, Operator, Technician by delivered Mechanical Static Engineering (Piping,Valve,Unfired Pressure Vessel, Scaffolding) training. INSTEP training offering are valuable for enhance organization business in upskilling employees capability for job’s operational, technical competency in ensured that staff are equipped with recent knowledge and skills to carry out their job with more efficiently.​At INSTEP, we offer programmes in three main areas:BRIDGING PROGRAMMES, to produce job-ready technicians & operators, as well as advanced programmes for engineers. Known as PTP - Petroleum Technology program for first entry trainees with optional recognition by BTEC or OPITO (PDP) PROFESSIONAL DEVELOPMENT PROGRAMMES to upskill working technicians & operators, as well as engineers. Lookout the program with Skillgroup (SKG) for Engineers & Non-Executive (NET) Technician, Operators(A&C) COMPETENCY-BASED ASSESSMENT & CERTIFICATION for industry workforce in meeting statutory bodies requirements such of DOSH, DOE & EC Show less

    • PETRONAS Programme Leader - PESITAS (Terengganu, Malaysia)
      • 2015 - 2016

      Perform a management roles in business strategic planning of Asessment & Certification program course for INSTEP - Institutes of Petroleum Technology PETRONAS (Technical Training Institutes)Programs List : I.C.E Engineer Gr2&1 Certification Steam Boiler Engineer Gr2&1 Certification I.C.E Driver Gr2&1 Certification Steam Boiler Driver Gr2&1 Certification1.Carry out the failure analysis on the nonconforming learner/candidate encountered and accreditation escalations via portfolio and evidence review. 2.Provide specification advice and technical knowledge to all Mechanical & Inspection academy staff including management of QMS, PTP, PDP & PESITAS; procedures & process performance;3.Review and resolve non-conformance report or evidence according to establish procedure;4.Assess quality control procedures / process / program effectiveness & drive improvements programs;5.Lead supplier's quality assessment on Technical Consultation Service Product, operation & quality system;6.Drive quality improvement to customized and non-customized programs to enhance quality and/or delivery or cost effectiveness ;7.Coordinate the investigation into customer escalations to determine root cause including improvements;8.Review or verify any new/amended assessment or verification standards/checklist and to ensure that the Program's standards/checklist are updated constantly;Plan, implement and maintain procedures in line managing QMS/BTEC/OPITO/PESITAS program;9.Plan, documents, execute, maintain, audit, monitor, review and improve the overall QMS process performance;10.Conduct Standardization and Quality Management Review Meeting by reporting in the Performance Metris of the quality program.11.Plan for Engagement Meeting with Regulatory Body, Accreditation Body and Board of Management by Quarterly and Annual basis in mantaining the Program's Standard and review the efficiency of execution. Show less

    • Oil and Gas
    • 700 & Above Employee
    • Offshore Installation Engineer (KL, Malaysia)
      • 2012 - 2015

      Develop technical working procedure & load out coordination manual through review of client’s AFC drawings. Develop material take-off (MTO) and procure relevant items under OIC scope of work. Design installation aids required for project (spreader bar, pipeline pulling heads, tie-downs tool , riggings arrangements and etc). In the sametime liaise with Clients for confirmation and clarification on technical aspects of given projects. I also able to develope anchors patterns for barge/vessel for offshore installation together with lift plan, ROV/Dive plan and action list for offshore construction crews’ reference during project . Conduct site inspection to identify constraints, project obstruction and rigging method for proposed project. Manage barge/vessel’s deck during project execution. Review & verify subcontractor’s daily progress report. At the end compile of close-out report, progress reports, tally sheet, minutes of meeting and etc for as-built documentation purpose. Installation Work History refer Project Record Show less

    • United Kingdom
    • Public Safety
    • 200 - 300 Employee
    • FSN Agent (Liverpool, United Kingdom)
      • 2010 - 2012

      Actively involves in Fire Support Network project for Liverpool community in reducing the risk of fire , accident by providing safety training, installation of safety equipment to the resident house and deliver an awareness message for people of the potential risk surround of their house . Beside that we promoting Merseyside Fire & Rescue services in fostering people to leverage their facilities towards the neighbourhood security & wealth issue . In the past I’ve involved in Social Welfare & Support team and Safe At Home project based in FSN HQ at Bootle,Liverpool,United Kingdom. Show less

    • United States
    • Technology, Information and Internet
    • 700 & Above Employee
    • Field Specialist (Labuan, Malaysia)
      • 2008 - 2009

      Certified as Tubing Convey Perforation (TCP) Specialist, carry out the well perforation operation task for any Schlumberger client globally. I have undergo a job exposure through Malaysia & Oman oil fields, completing the competency assessment to be TCP Specialist at European Learning Centre, France under comprehensive training less than 6 month. From there I am able to performs preparation job from well recognition, identify the suitable gun, type of charges and the best firing gun before prepare the package from Gun Workshop accordance to client & company standards. Assists by operation crew I have involved with mobilization works at the based and at the job site. Hands on skills while perform the job at the rig floor, we delivered the TCP job together with DST team for well testing in completing the service package and onsite data acquisition. The job covers many aspect of engineering: Mechanical, Fluid and Geosciences discipline alongside with the general task of Health & Safety Environments (HSE), Crew and Cost control management. Strong and clear communication skills are imperative for client presentations onsite, since the task dealing with high pressure and high temperature well. My last assignment was in Asia / Malaysia / Labuan Oilfield Work History •July 2008 - Murphy Oil - Kikeh Field Campaign (Malaysia’s First Deep Water) Successfully perforated 1 Water Injector Wells on Ocean Rover •Sept to October 2008 – PDO in Marmul Field Campaign Successfully perforated 5 Wells at Kikeh, Maurid , Thuleilat, Amal & Marmul field. •March to May 2009 PETRONAS - Bokor Field Campaign (IPM Schlumberger). Successfully perforated 2 Water Injector Wells on DD3 Show less

    • Mechanical Technician (Paka, Malaysia)
      • 2007 - 2008

      Lead the Mechanical Division for company’s branch based in Paka, Malaysia. My primary responsibility is to lead the mechanical project especially for repair & maintenance work scope at Sultan Ismail Combine Cycle Power Plant, Terengganu. The task cycle from developing the ITB documents upon the site visit including defining of the work scope, establish MTO list completed with project milestone. The work pack then will be presenting to the Top Management for validating the proposed profit margin plan. Upon project awards, I will gear up the procurement work, liaise with subcontractor, supplier in ensure all project material meets to the requirement whether by the standard and completion on time. Vastly using Microsoft Office program,Primavera I regularly updating the progress, monitor the manpower and equipment movement plans to ensure the project is on schedule. I used to handle a 50pax of subordinate working up to eight weeks duration without facing any downtime and actively involved in toolbox talks to engaged with the team. Out of number of proposal I’ve prepared, below was the list of projects that I managed to execute and delivered to clients: Project Assignment History • DOSH Inspection Preparation Work (Gas Turbine, Boiler, Steam Turbine) • Piping & Small Bore Tubing Fabrication for Gas Turbine Washing Skid System • Installation, Commissioning and Testing of Gas Turbine Washing Skid Unit • Developed of a Corrective Maintenance (CM) Plan for the entire Power Plant Roller Shutter • Perform the Manual H2O Cleaning of Waste Heat Boiler Tubing • PCC, Supply and Installation Exhaust Fan, Ducting and Awning • Successfully perform the Boiler Tube Cleaning (Blowing out) • Fabrication of Excess platform for Grand Seal Header valve • Installation of Sliding Door for Steam Turbine Chlorination Pipe rack • Fabrication & Installation of Oily Water separator Cleaning Bay & Related Trays • Repair and maintenance works for Turbine Hydraulic Jack Show less

Education

  • University of Liverpool
    Bachelor's degree, Mechanical Engineering
    2009 - 2012
  • Prince Sultan's Polytechnic of Technology - Sultan Mizan Zainal Abidin
    Diploma, Mechanical Engineering
    2004 - 2007

Community

You need to have a working account to view this content. Click here to join now