Fahad Bin Yousaf
Chief Engineer at Nishat Hotels & Properties Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Nishat Hotels & Properties Limited
-
Pakistan
-
Hospitality
-
200 - 300 Employee
-
Chief Engineer
-
May 2022 - Present
-
-
-
Pearl Continental Hotel Peshawar
-
NWFP Peshawar, Pakistan
-
Assistant Chief Engineer
-
Feb 2020 - May 2022
I have installed in heat exchanger for building heating system. Installation of New Power factor Plant for improving of power factor. synchronizing of GEN SET 725 KVA & 500 KVA. Installation of VFDs on chilled and condenser water pump. Installation of New kitchen Equipment, Deck Oven, Rotory Oven, etc. Automation of AHU,s I have installed in heat exchanger for building heating system. Installation of New Power factor Plant for improving of power factor. synchronizing of GEN SET 725 KVA & 500 KVA. Installation of VFDs on chilled and condenser water pump. Installation of New kitchen Equipment, Deck Oven, Rotory Oven, etc. Automation of AHU,s
-
-
-
Pearl Continental Hotel Rawalpindi
-
Pakistan
-
Hospitality
-
100 - 200 Employee
-
Assistant Chief Engineer (Task Force)
-
Jun 2021 - Aug 2021
Look after the day to day operation of engineering Departement and completed the pending project during the task force time. Look after the day to day operation of engineering Departement and completed the pending project during the task force time.
-
-
-
Pearl Continental Hotel Rawalpindi
-
Pakistan
-
Hospitality
-
100 - 200 Employee
-
Assistant Chief Engineer
-
Aug 2019 - Feb 2020
-
-
Repair & Maintenance Engineer
-
Dec 2014 - Jul 2019
Installation of New Centrifugal Chiller 400 TR including all piping and Cooling tower. Installation of NEW Generator 810 KVA. Installation of NEW ATS Panel.
-
-
-
-
HLP Engineer
-
Jun 2011 - Dec 2014
-
-
-
BIZ Broad Casting (Pvt) Ltd
-
Islamabad
-
Technician
-
Jun 2009 - Jun 2011
Preventive maintenance & routine maintenance of 100 KVA Generator, FM Transmitter & Other Electronic Equipment, Single Phase & 3 Phase Wiring. Maintain the Temperature of Transmitter Room. Preventive maintenance & routine maintenance of 100 KVA Generator, FM Transmitter & Other Electronic Equipment, Single Phase & 3 Phase Wiring. Maintain the Temperature of Transmitter Room.
-
-
Education
-
Preston University
B-Tech, Electrical -
Rawalpindi Polytechnic Institute
Diploma of Associate Engineering, Electrical -
Sir Syed Cambridge School
Matric, Computer Science