Faez Rasool
at WiMetrix- Industrial Data Intelligence- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
WiMetrix
-
Pakistan
-
IT Services and IT Consulting
-
1 - 100 Employee
-
-
Aug 2021 - Present
-
-
-
Mar 2019 - Sep 2021
• Working devotedly in different textile factories for Implementation of lean manufacturing projects. • Responsible for running of all the projects in knitwear, denim and woven. • Developed evaluate and improved manufacturing methods and process through lean techniques and kaizen events. • Analyze and re-engineered production layouts by designing and implementing efficiency and quality improvement. • Procuring and monitoring the efficiency of production equipment’s. • Have created Minute bank and Maintained SAM DATA Bank and implemented SAM base efficiency in stitching and cutting, allowing to give SAM base target. • Continuously review, prepare and maintain reports such as forecast, achievement and Production. • Prepare monthly reports on projects status and report to management on regular basis. • Responsible for the smooth running of Smart Tracking system (SPTS) in stitching and cutting on all sites. • Have implemented and maintained Smart RFID system in stitching and cutting lines. • Responsible for the site audits /maintenance of existing equipment deployed on site i.e. Smart box, Smart light, Smart QC panel. • Responsible for the In-house quality audits of hardware and electrical departs. • Asset tracking/RCA analysis/Improvement suggestion -continued. ACHIEVED PROJECTS: 1) SMS (Smart Maintenance System)-stitching, Cutting. 2) Smart RFID System. 3) GOS (General order Status) Cut to Ship Smart application. 4) IE Module (Sam base reports, Achievement, Forecast, M/c tracking, operation bulletin OB Generation). 5) Line balancing modules for stitching. SAM calculation through android application. Show less
-
-
-
TANA Netting
-
Lahore, Pakistan
-
Senior Officer
-
May 2018 - Mar 2019
-Throughly understand plans and targets given by director production. -supervising Cut to Ship for process improvement and achieving targets with full efficiency by using lean manufacturing and IE techniques (5's,Kaizen,Kanban and poka yoke system.) -Implemented ERP barcode system from cut to ship resulting in eliminating manual work and lowering the cost. - Defined VSM and working on visual managment system . -Developed E-card system for production from cut to ship. -Properly defind ERP visual system and production base IE reports with ERP team. -Have strong working on RFID (Radio Frequency and Identification device). -Have Developed RFID system to record loss time. -Prepared cutting and stitching OB's for the product. -Developed and have to update daily IE base production plan from cut to ship. -prepared and have to update daily IE forecast and achievement reports from cut to ship - Developed ERP base ledger to record employee records and loss time. -Developed IE based ERP modules. -Developed Production reports and designed layout for new auto verticle heat sealing mcs for Packing department. -Determined SAM from cut to ship and setting their efficiency base targets. -Calculated cost per minute. Show less
-
-
-
Style Textile
-
Pakistan
-
Textile Manufacturing
-
700 & Above Employee
-
Assistant Manager
-
Jan 2016 - Apr 2018
Assistant Manager Industrial Engineering Department -Supervising cutting and stitching dept to fulfill daily targets with full efficiency and implementing IE techniques. - Responsible for production tracking system(PTS). -Have to maintain and update Daily forcast and achievement IE reports of cutting and stitching. - Implemented ERCS techniques in cutting ,stitching and induction. -calculated SAM for cutting and stiching processes and determining their capacities. -Constructed and Implemented Sam base Efficiency in cutting dept. -Supervising Auto cutters and Auto spreaders to maximize output and record loss time and determining SAM of products. - Working together with production ,quality and planning department to remove bottlenecks and to run the processes smoothly . -Have to prepare incentive scheme for production. - Have knowledge of preparation of stitching and cutting OB's. -Have strong working on PTMS(pre determined time and motion system). Show less
-
-
-
-
Production Engineer
-
Jul 2015 - Jan 2016
Machine Shop Incharge: -Supervising the Machine shop for production of mechanical components for tranformer housing structure and LPG Bowzer. -Have to generate Machine shop production plan on daily bases . -Managing day to day operations and reports . -Responsible for smooth production of pressure vessel ( LPG bowser and transformer bodies). -Responsible to follow the ISO standards for production of pressure vessel and transforming housing . -Have strong drawing study about production of mechnical components. Show less
-
-
-
Pak Elektron Limited
-
Pakistan
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Internee
-
Jun 2015 - Jul 2015
Worked two months as an internee in PEL (Production Appliances Division). Upon finishing my tenure I submitted the following projects; -- Re-designed plant layout -- Work study and Time study -- Redesigned the jig and fixtures -- Straightening 5S -- New carpeted trolley was designed -- 3- stack U shape conveyor Worked two months as an internee in PEL (Production Appliances Division). Upon finishing my tenure I submitted the following projects; -- Re-designed plant layout -- Work study and Time study -- Redesigned the jig and fixtures -- Straightening 5S -- New carpeted trolley was designed -- 3- stack U shape conveyor
-
-
-
Haq Bahu Sugar Mills
-
Jhang, Pakistan
-
Internee
-
Mar 2013 - Apr 2013
A period of two weeks were accommodated to brush my technical knowledge along with my conceptual skills in sugar process industry A period of two weeks were accommodated to brush my technical knowledge along with my conceptual skills in sugar process industry
-
-
-
Pak Elektron Limited
-
Pakistan
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Internee
-
Jul 2011 - Aug 2011
I completed my tenure in PEL's Manaufacturing AD. I completed my tenure in PEL's Manaufacturing AD.
-
-
Education
-
University of Management and Technology (UMT)
BSc- Industrial Engineering -
Crescent Model Higher Secondary School
FSc. Pre- Engineering -
Defence Public School DHA Lahore
Matriculation, Physical Sciences