Fadhlan Hidayat

QC Inspector (Mechanical and Piping) at PT Pratiwi Putri Sulung
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bekasi, West Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Oil and Gas
    • 100 - 200 Employee
    • QC Inspector (Mechanical and Piping)
      • Mar 2020 - Present

      • Application of the Inspection and Test Plan ( ITP) • Prepare quality control procedure. • Review and determine what applicable WPS, Drawing and qualification of welder to carry out the welding activities for structure • Witness Fit Up and Visual Inspection for Structural. Witness Fit Up and Visual Inspection and ensure activity of during welding are follow procedure / WPS. • Witness Dimensional Inspection before and after welding. • Final Visual, mechanical punch list and Review NDT clearance in order to release the fabricated item. • Inspection bolting tightening and make a report inspection • Witnessing and Inspection Hydro test / Pneumatic Test. • Prepare Welding traceability and Material Traceability, and review Manufacturing Data Record (MDR) • Prepare and maintain Project Non-Conformance and to ensure corrective action has been properly implemented and timely close-out of Non-Conformances and complaints. • Prepare FAT and SAT. • Prepare Pre-Commisioning, Mechanical Completion and Commisioning. Project involved • Construction of Jirak Field Production dan Injection Facilities Jirak Field Owner : PT. Pertamina EP Asset 2 • EPCIC Construction of SSWJ and WJA Pipeline Interconnection Owner : PT. Perusahaan Gas Negara • JBBK Gas Station Owner : PT. Cikarang Listrindo • Pengembangan Insfrastruktur Gas Kawasan Industri Terpadu Indonesia China (KITIC) Owner : PT. Perusahaan Gas Negara Show less

    • QC Welding Inspector
      • Mar 2019 - Mar 2020

      • Application of the Inspection and Test Plan ( ITP) • Review and determine what applicable WPS, Drawing and qualification of welder to carry out the welding activities for structure • Witness Fit Up and Visual Inspection for Structural. Witness Fit Up and Visual Inspection and ensure activity of during welding are follow procedure / WPS. Witness Dimensional Inspection before and after welding. • Final Visual, mechanical punch list and Review NDT clearance in order to release the fabricated item and hand over for blasting/painting or galvanizing. Prepare Welding traceability and Material Traceability, and review Manufacturing Data Record (MDR) Project involved • Construction of Central Java IPP Project 2 x 1000MW Coal Fired Power Plant Owner : Mitsui Engineering & Shipbuilding Co., ltd • Structural Steel for MPP Office Building Project (17,500 T) Owner : Shimizu-Bangun Cipta Contractor JO. Show less

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • Quality Control
      • Jan 2019 - Mar 2019

      • Monitoring the product manufacturing process • Verify product quality • Ensuring that the goods produced have quality that meets company standards • Monitoring the product manufacturing process • Verify product quality • Ensuring that the goods produced have quality that meets company standards

    • Project Student
      • Feb 2018 - Oct 2018

    • Education Administration Programs
    • 1 - 100 Employee
    • Assistant of Basic Physic Laboratory
      • Aug 2015 - Aug 2017

    • Mining
    • 500 - 600 Employee
    • Intership Student
      • Feb 2017 - Mar 2017

Education

  • University of Sultan Ageng Tirtayasa
    S1, Metallurgical Engineering
    2014 - 2018

Community

You need to have a working account to view this content. Click here to join now