Eva Angeles
Manufacturing Line Leader at ICCNexergy, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
-
Manufacturing Line Leader
-
-
-
Prototype Engineer
-
1997 - 2000
Build the Prototype of a new Floppy drive. Media quality verification to suppliers. Capable of full process to build floppy drives. Magnetic Read Write Heads visual inspection and testing. Responsible for achieving production goals and prototype products. Build the Prototype of a new Floppy drive. Media quality verification to suppliers. Capable of full process to build floppy drives. Magnetic Read Write Heads visual inspection and testing. Responsible for achieving production goals and prototype products.
-
-
-
-
Assembler/Inspection
-
1996 - 1996
Inspection of the PCB’s before installing in the units. Touch- ups and re-works when needed it. Inspection of the PCB’s before installing in the units. Touch- ups and re-works when needed it.
-
-
-
SSL
-
United States
-
Defense and Space Manufacturing
-
700 & Above Employee
-
Sr. Solder Assembler
-
1995 - 1996
Building PC Boards by MIL-SPEC 2000, and NASA STANDARDS, Using hot plate, build cables, harness, and preparation of components. Building PC Boards by MIL-SPEC 2000, and NASA STANDARDS, Using hot plate, build cables, harness, and preparation of components.
-
-
-
-
Sr. Assembler/Inspection
-
1988 - 1992
Soldering PCB’s through hole components and SMT. Mechanical assembly. Wiring units. Mil-spec 2000 Soldering PCB’s through hole components and SMT. Mechanical assembly. Wiring units. Mil-spec 2000
-
-
-
ELECTRO PACIFIC CORPORATION
-
Research Services
-
Sr. Solder/Inspection
-
1987 - 1988
Build flexible PCBA’s. Build Coils, Bonding. Mil-spec 2000. Build flexible PCBA’s. Build Coils, Bonding. Mil-spec 2000.
-
-
-
-
Assembler/Inspection
-
1986 - 1987
Lapping, Wafer fab, test room, Final assembly and Inspection. Lapping, Wafer fab, test room, Final assembly and Inspection.
-
-
-
-
Assemblies Lead & Inspection
-
1980 - 1985
Build PCB’s, Harness, Cables, Wiring units, Soldering, Rework, and Inspection. Follow written instructions, color code, schematics and blue prints. Build PCB’s, Harness, Cables, Wiring units, Soldering, Rework, and Inspection. Follow written instructions, color code, schematics and blue prints.
-
-
Education
-
Kaplan College-Denver
Real Estate -
Santa Barbara City College
Electrical and Electronics Engineering -
University of California, Santa Barbara
Computer Programming