Eric Leite Peruzzo

Apoio Técnico de Obra at SebigasCótica
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Languages
  • Português Native or bilingual proficiency
  • English Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Brazil
    • Renewable Energy Semiconductor Manufacturing
    • Apoio Técnico de Obra
      • Nov 2022 - Present
    • Brazil
    • Government Administration
    • 1 - 100 Employee
    • Assessor de Engenharia
      • Nov 2021 - Oct 2022
    • Projetcts supervisor
      • Dec 2020 - Jul 2021

      Ninth largest supermarket chain in the state of Rio Grande do Sul Reporting to the President and Maintenance Manager ⋅ Responsible for carrying out the renovation; ⋅ Responsible for inspection, control and registration of the activities of outsourced companies; ⋅ Responsible for receiving and controlling materials; Relevant Projects ⋅ Execution of metallic structures with their foundations for demolition and subsequent expansion of the store; ⋅ Construction of more than 3,000 m² (32,291.73 ft²) of new flooring with the store in operation; ⋅ Execution of 360 m² (3,875 ft²) assembly of cooled chambers and isopanel preparation areas, including insulated subfloor, drainage and urethane flooring; ⋅ Replacement of the engine room with the old one still in operation; ⋅ Execution of drainage and execution of a concrete floor in a previously flooded area for later enlargement; ⋅ Execution of more than 1,100 m² (11,840.30 ft²) of plasterboard lining with sloping crown molding and areas with different types of lining; ⋅ Demolition of more than 250 m (820.2 ft) of walls to expand the store; ⋅ Monitoring the execution of more than 2,000 m² (21,527.82 ft²) of asphalt in the store's parking lot; ⋅ Monitoring the implementation of the refrigeration infrastructure in the new areas; Show less

    • Technical Supervisor
      • Nov 2019 - Oct 2020

      Consórcio criado para a implantação da primeira usina de geração de Biogás de torta de filtro e vinhaça do mundo. • Reportando ao Coordenador de Contratos; • Responsável pela atualização e organização das documentações (até fev/2020) • Responsável pela execução dos ítens de punch list para posterior entrega da obra (desde abr/2020) Projetos Relevantes • Organização e atualização de documentações da obra • Fiscalização da execução dos ítens de punch list Resultados • Maior agilidade e resposta para o cliente e empreiteiros devido à organização de documentos • Participação importante nas etapas finais das obras, agilizando o processo de entrega Show less

    • Brazil
    • Civil Engineering
    • 1 - 100 Employee
    • Supervisor técnico
      • Jan 2020 - Mar 2020

      Empresa com mais de 40 anos atuando em projetos de engenharia, construção, montagem, biogás e biorrefinarias. • Reportando à Coordenadora de Projetos • Responsável pela execução da obra Projetos Relevantes • Melhor condução e entrega da obra dentro do prazo determinado • Demolição de estruturas antigas com ZERO incidentes • Acompanhamento na execução de 3.800 m² de piso de concreto armado Resultados • Maior agilidade na condução da obra (observada pelo cliente) • Melhora na relação com o cliente e empreiteiros Show less

    • United States
    • Real Estate
    • 1 - 100 Employee
    • Administrative coordinator
      • Aug 2019 - Nov 2019

      • Reporting to the Owner• Performing the comparative calculation of the quantity of performed services at the Pampa Sul TPPRelevant project• Project recalculation: projected vs. executed within 3 months

    • Project Analyst
      • Apr 2019 - Aug 2019

      • Reporting to the owner, responsible for a team of 15 employees• Quality management in construction• Monitoring the execution of projects at the construction site with the construction team• Clarification of any interference and modifications to the project with the responsible company• Use of spreadsheets and 2D CAD toolsRelevant projects• Participation in the final stage of the execution of the Pampa Sul TPP Underground Project• Participation in the execution of the contaminated drainage of Pampa Sul TPP• Participation in the execution of a water reservoir base in Seival city, donated by ENGIEResults• Better acceptance of quality results by the company responsible for the projects• Recognition of agility of the construction activities by the owner. Show less

    • Civil Engineering Assistant
      • May 2018 - Apr 2019

      • Reporting to Civil Construction Manager• Management, supervision and guarantee of execution of the activities of subcontractorsRelevant Projects• Inspection of hydrostatic tests of the Pampa Sul TPP fire pressurized water network• Paving works of Pampa Sul TPP• Execution of the Pampa Sul TPP underground projectResult• Completion of the Pampa Sul TPP fire fighting network

    • Procurement Assistant
      • Oct 2016 - May 2018

      • Reporting to Procurement Head• Quotes, control and monitoring of purchases for Pampa Sul TPP• Control and distribution of purchases for Pampa Sul TPPResult• Greater control and efficiency in the diligence and distribution of purchases at the construction site.

    • Brazil
    • Civil Engineering
    • 1 - 100 Employee
    • Civil Engineering Intern
      • Feb 2016 - Oct 2016

      • Reporting to the Architect • Monitoring of works and projects, filling of work dairy and measurements • Completion and daily delivery of current work dairy Relevant Projects • Monitoring of work in the rural area of the city • Monitoring the execution of a shoe store • Participation of an event about fireplaces in the URCAMP academic week with the company Results • Improved material inventory organization • Reporting to the Architect • Monitoring of works and projects, filling of work dairy and measurements • Completion and daily delivery of current work dairy Relevant Projects • Monitoring of work in the rural area of the city • Monitoring the execution of a shoe store • Participation of an event about fireplaces in the URCAMP academic week with the company Results • Improved material inventory organization

    • Intern
      • Sep 2015 - Feb 2016

      • Reporting to the Head of the Geomensure and Cartography Nucleus or Deputy Mayor • Monitoring topographic measurements and using GIS software Relevant Projects • Mapping of IPHAE-RS protected buildings through GIS software • Performing topographic measurements by Bagé City Hall • Reporting to the Head of the Geomensure and Cartography Nucleus or Deputy Mayor • Monitoring topographic measurements and using GIS software Relevant Projects • Mapping of IPHAE-RS protected buildings through GIS software • Performing topographic measurements by Bagé City Hall

    • Armed Forces
    • 100 - 200 Employee
    • Second lieutenant
      • Jun 2012 - Jun 2013

    • Officer Candidate
      • Mar 2012 - Jun 2012

Education

  • URCAMP
    Bachelor degree, Civil Engineering
    2013 - 2019

Community

You need to have a working account to view this content. Click here to join now