Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Paper and Forest Product Manufacturing
    • 300 - 400 Employee
    • Regional Engineer
      • Oct 2022 - Present
    • Project Engineer II
      • Oct 2021 - Oct 2022
    • United States
    • Renewable Energy Semiconductor Manufacturing
    • 500 - 600 Employee
    • Civil Engineer
      • Sep 2019 - Oct 2021
    • United States
    • Construction
    • 700 & Above Employee
    • Civil Engineer/Construction Manager
      • Aug 2013 - Sep 2019

      Responsible for the development and management of financial and operational objectives for projects as well as evaluate contractor performances through goal setting and progress monitoring. - Supported the development and execution of several multimillion dollar projects, which ranged from site prep work, electrical substations, new parking lots, container yards, large scale drainage developments, and rail additions/upgrades, totaling over $16M - Developed, planned, and led the installation of various utility infrastructures (firewater, sanitary sewer, potable water, drainage, and power) for multiple areas around the site, totaling approximately $5M - Managed the installation of a $2M wastewater clarifier - Managed the installation of a $350K material lift - Scheduled and headed multiple building additions and renovations - Assisted in the planning and completion of a $700K demo for a decommissioned steel and concrete structure - Aided in the conception of repair and replacement of barge dock fenders and walkway - Responsible for the management and implementation of all BMP’s onsite - Manage daily maintenance and project activities to support the site Show less

    • United States
    • Mining
    • 1 - 100 Employee
    • Lab Technician
      • Jan 2013 - May 2013

      I perform basic lab tests, such as BOD, CBOD, Bacteria, TSS, Phosphorus, Nitrates, and Nitrites. I also enter lab data into LIMS (Laboratory Information Management System) computer software and pick up samples when needed. I perform basic lab tests, such as BOD, CBOD, Bacteria, TSS, Phosphorus, Nitrates, and Nitrites. I also enter lab data into LIMS (Laboratory Information Management System) computer software and pick up samples when needed.

    • Germany
    • Chemical Manufacturing
    • 700 & Above Employee
    • Civil Engineering Intern
      • May 2012 - Aug 2012

      I assisted in the implementation of various projects, including ditch grading, a $400K environmental pond closure, and the construction of a $1.5M new railroad project  Surveyed grounds for an additional parking zone and ditches  Contacted vendors to contract services by scheduling appointments  Utilized SAP to order equipment, supplies, and aggregate  Developed a project schedule for the renovation of the Human Resources building I assisted in the implementation of various projects, including ditch grading, a $400K environmental pond closure, and the construction of a $1.5M new railroad project  Surveyed grounds for an additional parking zone and ditches  Contacted vendors to contract services by scheduling appointments  Utilized SAP to order equipment, supplies, and aggregate  Developed a project schedule for the renovation of the Human Resources building

Education

  • University of South Alabama
    Bachelor of Science (BS), Civil Engineering
    2007 - 2013

Community

You need to have a working account to view this content. Click here to join now