Eric Candra Budianto Simanjuntak
Jr. Instrumentation and Control Engineer of PT Guohua Taidian Pembangkitan Jawa Bali (GHPJB) at China Shenhua Energy Co., Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Chinese Limited working proficiency
Topline Score
Bio
Credentials
-
EDPF NT+ Distributed Control System
Beijing Guodian Zhishen Control Technology Co., Ltd.Mar, 2018- Oct, 2024 -
Poster Presenter
ITB International Geothermal WorkshopMar, 2017- Oct, 2024 -
The 7 Habits of Highly Effective Students
FranklinCoveyJul, 2012- Oct, 2024
Experience
-
China Shenhua Energy Co., Ltd.
-
China
-
Mining
-
1 - 100 Employee
-
Jr. Instrumentation and Control Engineer of PT Guohua Taidian Pembangkitan Jawa Bali (GHPJB)
-
Mar 2018 - Present
CFSPP - Ultra Supercritical Boiler 2x1000 MW Net Power Entity
-
-
Engineer Trainee of PT Guohua Taidian Pembangkitan Jawa Bali (GHPJB)
-
Sep 2017 - Mar 2018
GHPJB is an O&M Services Company for Java 7 CFSPP 2x1050MW. The investment comes from China Shenhua Energy Co., Ltd. and the subsidiary of PT PLN (Persero),PT Pembangkitan Jawa Bali.It is located in Serang, Banten and will be the first Ultra-Super Critical Power Plant in Indonesia.
-
-
-
Institut Teknologi Bandung (ITB)
-
Indonesia
-
Non-profit Organizations
-
1 - 100 Employee
-
East Java Passive Seismic Project
-
Nov 2016 - Dec 2016
Monitored 6 seismometers (Guralp and Geotech) which was placed in Madiun, Nganjuk, and Bojonegoro in order to identify the seismic activity around east Java Monitored 6 seismometers (Guralp and Geotech) which was placed in Madiun, Nganjuk, and Bojonegoro in order to identify the seismic activity around east Java
-
-
-
-
Processing Geophysicist
-
Jul 2015 - Aug 2015
Magnetotelluric data processing Magnetotelluric data processing
-
-
Education
-
Institut Teknologi Bandung (ITB)
Bachelor's degree, Geophysical Engineering