Erhan Uygun
Customer Solutions Executive at Ekin - Next Generation Smart City Solutions- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
Topline Score
Bio
Credentials
-
Q-SYS Designer
-Mar, 2014- Nov, 2024
Experience
-
Ekin Smart City
-
Türkiye
-
Public Safety
-
1 - 100 Employee
-
Customer Solutions Executive
-
Mar 2021 - Present
-
-
Senior Customer Solutions Engineer
-
May 2020 - Mar 2021
-
-
Technical Sales Engineer
-
Mar 2019 - Apr 2020
-
-
-
Asimetrik Sound, Lighting and Visual Systems Inc.
-
Türkiye
-
International Trade and Development
-
1 - 100 Employee
-
Project Engineer
-
Mar 2016 - Apr 2018
• Electronic System Design (Professional Sound, Light and Display Systems, Multimedia Systems, Audio&Visual Systems, Media Automation Systems, Digital Conference Systems, Digital Signage Systems etc.)• Project Design• Block Diagram Design• Offer Creation• Project Sales• Project Management• Field Engineering• Tender Preparation and Tender OffersASHGABAT 2017 ASIAN INDOOR and MARTIAL ARTS GAMES• Venue Multimedia SpecialistİSTANBUL TİCARET ODASI - KIŞ BAHÇESİ(Audio and Visual Systems)• Site Survey• Electronic System Design• Offer & BOQ Creation• Project Sale and Management• Project Design• Block Digram Design• Field EngineeringKOZZY KOZYATAĞI KÜLTÜR MERKEZİ GÖNÜL ÜLKÜ ve GAZANFER ÖZCAN SAHNESİ(Professional Stage Sound System)• Preparation of Tender Offer• Project Management• Field EngineeringHALİS KURTÇA KÜLTÜR MERKEZİ SAHNESİ(Professional Stage Sound System / Professional Stage Lighting System / Professional Video ProjectionSystem / Wireless Intercom Communication System)• Preparation of Tender Offer• Project Management• Field EngineeringHEYBELİADA DENİZ LİSESİ - Sport Center(Professional Sound System)• Preparation of Tender Offer• Site Survey for Installation• Project Design• Block Digram Design• Project Management• Field EngineeringARTAŞ İNŞAAT - Group Office Building(Meeting Rooms Multimedia Systems / Video Wall System)• Field EngineeringADANAPARK ALIŞVERİŞ MERKEZİ - Outdoor Area, Show Pool(Outdoor Area Background Music System / Show Pool Professional Sound System)• Site Survey• Electronic System Design• Offer & BOQ Creation• Project Sale and Management
-
-
Project Manager
-
Jan 2015 - Mar 2016
• Project Management• Field EngineeringASHGABAT OLYMPIC COMPLEX PHASE II (2017 Asian Indoor and Martial Arts Games)(Multimedia Systems / Intercom Systems / Video Wall Systems / Scoreboard & Led Wall Systems / Background Music and Announcement Systems / IPTV Systems / Proffesional Sound Systems / Cinema AV Systems)• Control and Field Application of the Projects• Control of the BOQs• Supervising of the Installations• Arrangement the division of labor and scheduling of the technicians and technical staff• Creating Reports and Papers• Worked with SIEMENS, ATOS, POLIMEKS and BALICH
-
-
Electrical Electronic Engineer
-
Mar 2014 - Jan 2015
• Electronic System Design (Multimedia Systems, Audio&Visual Systems, Media Automation Systems etc.)• Acoustical System Design with Simulation Programs• System Start-Up with Computer-Based SoftwaresMOI PARK, Mall of İstanbul, Turkey (March 2014 – May 2014)(Interactive Stage System / General Sound System)• Interactive Stage (LED Dance Floor) was designed, installed, commissioned and activated.• Worked as a member of team for field application of the general sound system.• Necessary trainings were given to technical staff of MOI PARK for using the systems.Esantai Almaty Buildings in Kazakhstan (August 2014)(Emergency Evacuation System / Background Music System)• In accordance with the projects, digital designs were created by using a computer-based software.• The systems were activated by using the same software and network-based devices.• Necessary trainings were given to technical staff of Esantai Almaty Buildings for using the systems.Konya Büyükşehir Torku Arena (September 2014)(Professional Sound System / Background Music System / Emergency Evacuation System)• In accordance with the projects, digital designs were created by using computer-based softwares.• The systems were activated by using the same softwares and network-based devices.• Necessary trainings were given to technical staff of Konya Büyükşehir Torku Arena for using the systems.
-
-
-
Edip Mühendislik İnşaat Taahhüt Sanayi ve Tic.Ltd.Şti.
-
Hatay, Turkey
-
Electrical Engineer
-
Aug 2013 - Feb 2014
• Drawing of Electrical Projects on AutoCAD • Field Control and Building Audit • Drawing of Electrical Projects on AutoCAD • Field Control and Building Audit
-
-
-
İsdemir
-
Mining
-
700 & Above Employee
-
Intern
-
Jul 2013 - Jul 2013
• PLC Automation • PLC Automation
-
-
-
Siemens
-
Germany
-
Automation Machinery Manufacturing
-
700 & Above Employee
-
Intern
-
Jul 2012 - Aug 2012
• Maintenance Operations of MR, Tomography, X-Ray, Mammography etc. • Maintenance Operations of MR, Tomography, X-Ray, Mammography etc.
-
-
-
Armada Grandee Yurtdışı Egitim Danışmanlığı
-
Eskisehir, Turkey
-
Ünivetsite Temsilcisi
-
Sep 2009 - Jun 2010
• Work and Travel University Representative • Work and Travel University Representative
-
-
-
Six Flags
-
United States
-
Entertainment Providers
-
700 & Above Employee
-
Operator
-
Jun 2009 - Sep 2009
Work and Travel Work and Travel
-
-
Education
-
Eskişehir Osmangazi Üniversitesi
Bachelor's Degree, Electrical and Electronics Engineering -
Akhmet Yassawi University
Master of Business Administration - MBA -
İbn-i Sina Anatolian High School
High School Diploma, Physical Sciences