Enyled Zamora Molero
Calibration Engineer at Kane International Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Español Native or bilingual proficiency
-
Ingles Full professional proficiency
Topline Score
Bio
Jorge John Velásquez Levanzin
Excelente Profesional, Proactiva, Responsable y Dedicada.
Jorge John Velásquez Levanzin
Excelente Profesional, Proactiva, Responsable y Dedicada.
Jorge John Velásquez Levanzin
Excelente Profesional, Proactiva, Responsable y Dedicada.
Jorge John Velásquez Levanzin
Excelente Profesional, Proactiva, Responsable y Dedicada.
Experience
-
Kane International Limited
-
United Kingdom
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Calibration Engineer
-
Aug 2020 - Present
Calibrate and Repair measuring equipment (gas analyser) to ensure precision settings are in line with standard.Key responsibilities• Perform tests using diagnostic tools, resolve issues related to calibration, repair PCB (resoldering, electronic component replacement) document results and prepare technical reports. • Test and repair accessories, including probe, thermal printer, gas sniffer among others. Calibrate and Repair measuring equipment (gas analyser) to ensure precision settings are in line with standard.Key responsibilities• Perform tests using diagnostic tools, resolve issues related to calibration, repair PCB (resoldering, electronic component replacement) document results and prepare technical reports. • Test and repair accessories, including probe, thermal printer, gas sniffer among others.
-
-
-
-
Control Engineer
-
2013 - 2018
Selected as part of the team to maintain and operate the 200 MW Power Plant (Instrumentation and Controls).Key responsibilities• Troubleshooting turbines and auxiliaries equipment using software, PLC and HMI data & trending analysis, measuring instruments.• Design and implement solutions of system’s problems (engineering, improvements) • Elaborated commercial documents for spare parts acquisition and control of inventory.• Fluent communication with manufacturers and supplier to solve issues and implement improvements. Main achievements:• Reduced in 70% the time out service developing reports about failures and activities conducted to the solution based in ISO 14224.• Improved the Power Plant’s reliability developing, implementing and leading the preventive maintenance philosophy in a new power plant.
-
-
-
PDVSA SERVICES
-
Oil and Gas
-
300 - 400 Employee
-
Instrumentation &Controls Project Engineer
-
Jul 2011 - Aug 2013
Inspected Instrumentation and Controls works in the Construction of Power Plant and Auxiliaries EquipmentKey responsibilities• Executed instrumentation activities (calibration, loop checks, installation and wiring)• Created, revised documents and engineering drawings (P&ID, Loop Diagrams, Cable, Signal and Instruments Index Lists)• Verified contracts execution of 15 contractors by quality control inspections.• Preparation of all the documentation required to hire suppliers and contractorsMain achievements:• Supported every stage of construction, installation and commissioning of Gas Power Plant generating 200 MW 13.8 kV/115 V within budget.• Implementation of F&G, CCTV, intrusion detection and access control systems in an industrial location.
-
-
-
-
Construction Inspector
-
Jul 2010 - Jul 2011
Reported progress on different construction projects by analysing and settings reports Key responsibilities:• Prepared Daily Report and updated planning matrix, reporting the progress on different construction projects by analysing and settings reports (including water wells construction, metering and gas station, physical protections systems, etc).• Revised 600+ Electrical, Instrumentation and Control drawings and engineering documents of the Power Plant’s Systems (Conceptual, Basic and Details).Main achievements:• In a short space of time created a system to organize and control the engineering documents (more than 2000) facilitating the revision.• Revised and made inventory of all equipment and materials used to construct the plant (More than 4000 items in two months).
-
-
Education
-