Enrique Carela

Engineering and Documentation manager at National Chains
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Dominican Republic, DO
Languages
  • English Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • South Africa
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Engineering and Documentation manager
      • Jan 2017 - Present

    • Engineering manager
      • Mar 2014 - Nov 2016

      DRL Manufacturing is a Richline group's facility at Berkshire Hathaway Company, dedicate to the Jewry manufacturing, Plan coordinate all engineering activities in de organization, with a work force of 12 people, 9 Industrial Engineers and 3 auxiliary, the plan had 700 employees, the main project in place implementing a piece work payment system, automation of production data to generate the payroll, efficiency, man power, productivity, make up, implementing of the KPI system management ,fro tracking, reporting and analysis,Continuous evaluation of the process to identifier improvement opportunity and cost reduction, Identified, select and develop new talent to have internal candidate’s bank to occupy middle position in the organization. Show less

    • Graphic Design
    • 1 - 100 Employee
    • Engineering and Country Maintenance Manager
      • Jan 2009 - Oct 2013

      Dominican wolverine is a shoes manufacturing facility of Wolverine World Wide in the Dominican Republic. Responsibility: Plan, coordinate and lead the Engineering department, with continuous evaluation of the process to improve the output, quality and cost. -Elaborate the labor cost sheets for new product, introduce the new product in the production line, implementing methods, improve process, auditing each operation to keep or improve labor as it was conceived -Generate and supply key information as Forecast, production Schedule, Man Power, line Balance, efficiency. - Plan, Coordinate and Implement the general maintenance program for the dominican Republic facility, five building totayl. buy machines and equipment, administrate the spare parts inventory. Achievement the implementation of the One piece flow line, the Maintenance manager system software, TPM, Autonomous maintenance, reduce the energy consumption at the distribution canter by US $ 12,000 Annually by implementing new lighting system. Show less

  • Dominican Garden Products
    • San Pedro de Macoris
    • Plant Manager
      • Jun 2007 - Sep 2008

      Dominican Garden product is a plastic's flower pot manufacturing in the Dominican Republic Responsibility:Plan, Coordinate, lead and control all activity in the manufacturing Plant, establish continuous evaluation of each steps of the manufacturing process to achieve the quality standard and improve the cost level, responsible for a work force 70 people, working 24/7. Achievement; lead this manufacturing project from Its initiation, handle the building's conditioning work, recruit and training the indirect and direct personal up to get the factory in operation. Show less

  • Spartan Shoe LTD
    • San Pedro de Macoris
    • Engineering and Maintenance Manager
      • May 2001 - Mar 2007

      Spartan Shoe LTD is a shoes manufacturing Plant of Wolverine World Wide in the Dominican Republic. Evaluate and approve the work methode, time standard, labor cost, certify the training on the new method as neede, continuous evaluation of the process to look for improvement opportunity in cost and process time reduction and individual efficiency, materials and machinery used to find opportunity for improvement Develop and implement the general facility's maintenance program, integrated with the TPM Program. Plan Coordinate and execute the facility improvements and new machinery acquisition leading a work force of 19 people. Achievement: develop, plan, coordinate and implement the Toyota production system. Set down the procedure and documentation of the maintenance department for ISO 9000 Certification Show less

  • Spartan Shoe LTD
    • San Pedro de Macoris
    • Plant Manager Assistant
      • Jul 1994 - Mar 2001

      Responsible for production with a target of 24,000 pair weekly, with a work force of 743 direct and indirect personnel, supply man power and machinery to achieve this target. Set up new product, process , method, training, tools and quality control procedures to meet standard. Conduct weekly conference call with costumer to set up production schedule, new project development, report work orders status. Achievement: implement the skill certification program with great impact in quality, efficiency and materials used. Show less

  • Spartan Shoe LTD
    • San Pedro de Macoris
    • Materials Manager
      • Mar 1990 - Mar 1994

      Responsible to get materials level inventory according to the production demand to avoid lack of materials through the MRP system. Control of materials usage by persistent audit of materials allowance versus used Track of materials W.O. and logistic to accomplish the lead time Achievement: implement the materials circle count. to establish the maximum and minimum in the spare part department. Take the warehouse losing over US $50,000.00 by quarter to gain over US $20,000.00 in saving. organize the department to take it to be considered the best in corporate, confirmed by two time winning awarded in the annual quality conference. Show less

Education

  • Universidad APEC
    MBA, productivity
    1998 - 2000
  • Universidad Central del Este - UCE
    Universidad APEC, Master degree

Community

You need to have a working account to view this content. Click here to join now