Engy Mohamed

Tendering Technical Office Engineer at Allies Investment Group - AIG
  • Claim this Profile
Online Presence
Contact Information
Location
EG

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Tendering Technical Office Engineer
      • Aug 2021 - Present

      Responsible for proposals preparation, order processing, contractual terms reviews  Assists the company’s Account Managers.  Responsible for all site technical office for light-current systems including the following Activities:  All light current system installation and testing tasks  Prepare design for light-current systems which is cost effective and meets customer requirements.  Designs includes solutions for: structured cabling, fire alarm, telephones system, CCTV, Access Control, Public Address, Nurse Calling ,Network Infrastructure (passive and active), MATV, digital signage, and audio-visual solutions.  Create technical proposal document according to work instructions and tender/study requirements including solution design description, statement of work, product data-sheets.  Prepare shop drawings, Single Line Diagram, Schematic Diagrams & Technical Submittals.  Prepare technical compliance sheets for proposed material/equipment in accordance to Consultants’ recommended specifications.  Coordinate with customer appointed consultant and prepare any required material and shop drawing submittals after project award  Provide technical support to implementation team and address any questions with regards to solution design and proposed equipment throughout project implementation phase

    • Senior Tendering Engineer
      • Oct 2014 - Aug 2021

      a. Doing Technical and commercial tender offers (for Sale, Repair and Rental Services) b. Make price analysis to offer with a competitive price and maximum profit as well.. c. Follow up with clients and negotiate with them to finalize the deal and get the P.O d. Making purchase orders for our agent abroad and following up the shipment and custom release. e. Making technical reports in case of repairing tools. f. Solving site problems (in case of rental) g. Doing Stock Survey h. Revising contracts and agency agreements conditions. i. Organizing Exhibitions as EGYPS and MOC j. Doing client visits if needed to negotiate in prices, payment terms in addition to warranty conditions. k. Finding new agents for our company to complete our supply chain in addition to making technical and financial comparison between suppliers.

    • Egypt
    • Retail
    • 1 - 100 Employee
    • Senior Product Engineer
      • Feb 2013 - Dec 2013

      Help develop, improve, and implement site programs  Coordinate activities, as required with internal groups including: Maintenance, Operations, Construction, Purchasing, Logistics, etc.  Manage, coordinate and implement all elements of Safety Management standard.  Participate in activities for existing and new processes.  Provide Process Safety Review .  Participate on teams responsible for implementing new products and processes.  Provide technical assistance to site management and staff in the field of process safety management.  Assist compliance with process design standards and practices for site maintain existing practices and implement improvements to stay current with industry best￾practices.  Execute projects, feasibility studies and front end engineering, issue management of change, aid for plant engineering / maintenance engineering  Interact with Operations personnel to define and solve process safety/design issues.  Set production control chart sequence for production process  Support production line until stabilization of the product  Make (VE) value engineering studies about cost reduction & technical improving  Core of the factory & HQ supporter

    • Egypt
    • Construction
    • 700 & Above Employee
    • Technical Office Engineer
      • May 2011 - Feb 2013

      · April 2012 to present: Grand Egyptian Museum project as an Q.S electrical engineer with Besix-Orascom Construction industries joint venture •Responsible for quantity tracking for different electrical systems. · Responsible for making sure that the construction company stays with contract drawings to save budgets. · Following scope to determine whether it should be purchased by a construction company and what is not to be a new claim or instruction. · Providing advice on contractual claims. · Preparing bills of quantities of the needed materials for construction. · Prepare a breakdown of material for new change order and variations. · May 2011 to march 2012: Cairo Festival City project as an Q.S electrical engineer with Carillion-Orascom Construction industries joint venture · Responsible in quantity tracking for different electrical systems. · Responsible for making sure that the construction company stays with contract drawings to save budgets. · Following scope to determine whether it should be purchased by a construction company and what is not to be a new claim or instruction. · Providing advice on contractual claims. · Preparing bills of quantities of the needed materials for construction. · Prepare a breakdown of material for new change order and variations. v April 2011 to May 2011: electrical engineer designer at Eltashyeed w Elbenaa for constructions v September 2010 to march 2011: Electrical maintenance engineer at SCS American Company Poly Egypt for UPVC, PPR, PE · Maintenance & Operation for all electrical & mechanical equipment such as water pumps, generators, electrical panel boards, chillers & all light current systems in the total factory area in addition to manage the other branches for maintenance for all machines

Education

  • Cairo University
    Bachelor of Engineering - BE, Electrical and power machines dept
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now