Engr. Uchenna OSIM, M.ENG., MBA-EM, COREN, MNSE, CPMP®, CFMP®.

Facility Asset Manager at Joeny Holdings Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Port Harcourt, Rivers State, Nigeria, NG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Registered Engineer, Electrical Engineering Practice
    The Council for the Regulation of Engineering in Nigeria, COREN
    Mar, 2023
    - Nov, 2024
  • Corporate Member
    The Nigerian Society of Engineers Headquarters
    Nov, 2022
    - Nov, 2024
  • Competency Certificate | Category A License Electrical Engineer
    Nigerian Electricity Management Services Agency (NEMSA)
    Sep, 2021
    - Nov, 2024
  • Certified Facility Management Professional - CFMP
    Chartered Institute of Contract Project and Facility Management
    Aug, 2020
    - Nov, 2024
  • Chartered Project Management Professional - CPMP, ACIPM
    Chartered Institute of Project Management
    Aug, 2020
    - Nov, 2024
  • Quality Management System Internal Auditor (QMSIA)
    Tenol Alpha
    Apr, 2018
    - Nov, 2024
  • ISO 9001:2015 Quality Management System (QMS)
    Tenol Alpha
    Mar, 2018
    - Nov, 2024
  • Procurement, Logistics, and Supply Chain Management (PLSCM)
    Piston & Fusion | Business Academy
    Mar, 2018
    - Nov, 2024
  • Project Management Professional (PMP)
    Piston & Fusion | Business Academy
    Jun, 2017
    - Nov, 2024

Experience

    • Nigeria
    • Oil and Gas
    • 1 - 100 Employee
    • Facility Asset Manager
      • Mar 2023 - Present

      Develop and implement strategy, office processes and policies for asset management.Design and implement asset tagging procedures for all JOENY assets.Coordinate inventory of all fixed and movable assets like slickline, wireline tools, well head tools and other company equipment.Oversee and maintain inventory in Enterprise Resource Planning (ERP) Asset Management Platform.Plan and implement asset life cycle, specifications and preventive maintenance strategy.Manage asset after acquisition, assign specifications, track warranties, life cycle and final deposition of assets.Reconcile fixed and movable asset inventory and investigate any inconsistencies.Design and run various asset reports, organize and maintain plans and documents in archive library.Manage day-to-day operations of the assigned asset, especially the project management and delivery of asset.Responsible for revamping prospects and already identified assets. Show less

    • Project Manager
      • Jul 2018 - Present

      Facilitated meetings with clients to take detailed ordering briefs and clarify specific requirements of each project for proper scope documentation, Stakeholder identification, etc. Performed planning, scheduling, estimating, budgeting, cost control, supervision, and management of project resources (Man, Machine, Materials & Money) for the execution of project scope as per contract requirement.Coordinated production of detailed engineering design, deliverables, and packages required for the transfer of a project’s technical information from design to construction, installation, commissioning, and handover.Liaise and maintain an effective relationship with client representative and relevant Federal Ministries Agency like NEMSA, NERC, and Utility Companies.Managed the Design, Construction, Installation, and Commissioning of 2no x 37.5MVA, 11/11.5KV Isolation Transformer substation for NAOC OB/OB Gas Plant in compliance with IEC 61850, IEEE STD 80, ISO/IEC 60502-2, CENELEC – EN 50110-1Supervised Detailed Design, Construction, Installation, and Commissioning of 4km, 33Kv Overhead Transmission lines (OHTL).Developed Standard operating procedures, technical specifications, data sheets, Method statements, and testing procedures, commissioning plans for electrical power projects.Developed BEME, BOQ, MTO, Bulk material list for projects.Developed Detailed Design, Construction, Installation, and Commissioning of 2no x 15MVA, 11/33KV Step-up Transformer substation for NAOC OB/OB Gas Plant in compliance with IEC 61850, IEEE STD 80, ISO/IEC 60502-2, CENELEC – EN 50110-1Oversee OEM equipment production and respond to technical clarification/ correspondence for manufacturing of power transformers, switchgear, power cables, transformer protection and control relay panel, UPS, etc.Negotiate and oversee activities of suppliers, vendors, and contractors.Performed weekly/monthly Progress Reports for the NAOC OB/OB – EOC Power Transmission project. Show less

    • Electrical Project Engineer
      • Apr 2014 - Jul 2018

      Carried out preliminary studies/ site survey for Ob/Ob – EOC Power Transmission Project and develop site survey report.Performed electrical power system analysis including Load flow studies, earth grid design, relay coordination/ selectivity studies, electrical ampacity calculation, voltage drop, Sag and tension calculation, and short circuit capacity calculation of electrical switchgear and circuit breakers.Sizing and selection of 33KV Outdoor switchgear, 11KV indoor Switchgear, Neutral earthing resistor, voltage, and current transformers, 37.5MVA, 11/11.5KV Isolation, 15MVA, 11/33KV step-up transformers and 2nos x 15MVA, 33/11Kv Step-down transformersDeveloped Single Line diagrams, Equipment layouts, schematics drawings, Control SLD, and 33KV Right of way (ROW) drawing for the 4KM 33KV OHT lines for the NAOC OB/OB – EOC Power Transmission Project.Performed equipment sizing and selection of control and power cables for MV/HV/LV systems, cable interconnection schedule, selection and sizing of cable tray/ladder, duct, etc.Developed BEME, BOQ, MTO, Bulk material list, equipment technical specifications, datasheet, and installation method statement.Performed Cost, Time & Resources (CTR) Planning, Budgeting, and Cost Estimation.Coordinate Reading, Interpretation and Implementation of Engineering Design Drawings and technical specifications, quality & safety procedures Electrical Project Supervision and commissioning of 2nos x 15MVA, 33/11KV step-down transformer substation with associated 33kV Outdoor equipment such as VTs, CTs, LAs, gang isolators, SF6 circuit breakers, and indoor 33kv control relay panel.Responsible for daily/monthly Progress Reports for NAOC OB/OB – EOC Power Transmission project.Technical Procurement Support to tender and procurement department. Show less

    • Nigeria
    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Designer
      • Mar 2012 - Apr 2014

      EPC NIPP Lot 21 – Ibadan distribution zone including – Olomore 15MVA, Abiola way 2 x 15MVA, Iberekodo 15MVA, Papalanto 7.5MVA, Ijoko 2 x 15MVA, LGA 15MVA, Itele 15MVA, Owode Yewa 15MVA; Niger Delta Power Holding Company; 2012 – 2014 Participated in the design and preparation of the line route drawings for the entire medium voltage(11KV) to low voltage (0.4KV) distribution network. Participated in sizing and selection of HV/MV/LV Switchgear, power cable, and luminaires. Developed technical specifications, datasheets, and bills of quantity for the project. EPC for 2 x 3MVA 33/0.4KV Substation, Nigerian Port Authority (NPA) Onne: Selection and sizing of electrical equipment such as Emergency generator, Transformers, LV/HV/MV Switchgears, DC Battery & Battery Charger. Illumination Design – Indoor & outdoor Illumination calculation using DIAlux software, selection of lighting fixtures, lighting layout design, lighting installation details, and small power selection. Involved in the design, drafting, and plotting of Electrical networks such as GPS coordinated power line route/ right of way survey drawing, overhead line hardware installation detailed drawing, and schematics for the Project. Prepared equipment technical specifications and respond to technical queries. Prepared bill of quantity for construction of electrical power systems. Analyzed the RFQ and Specifications and recommend quote / no quote. EPC for 22MW Diesel power plant, Blackhall, Freetown; Government of Sierra Leone. Involved in the determination of plant load demand, installed capacity, estimation of capital cost, and operational cost. Design, sizing, and selection of generating plant, protection panel, switchgear, cables, and other consumables. Prepared BOQ, BEME, datasheets, technical specifications, method statement Show less

Education

  • Enugu State University of Science and Technology
    Master of Engineering in Electrical and Electronic Engineering, Power System Engineering
    2020 - 2023
  • Chartered Institute of Contract Project and Facility Management
    Post Graduate Diploma (PGD), Project and Facility Management
    2020 - 2020
  • Enugu State University of Science and Technology
    Post Graduate Diploma (PGD), Electrical and Electronics Engineering
    2018 - 2019
  • National Institute of Business Management (NIBM) Global
    Master of Business Administration - MBA, Entrepreneurship Management
    2016 - 2017

Community

You need to have a working account to view this content. Click here to join now