Engr. Md.Mosiur Rahman

Deputy Manager Operations at Baraka Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Chandpur District, Chattogram, Bangladesh, BD
Languages
  • English Professional working proficiency
  • Bangla -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • ABC Certificate
    Electricity Licensing Board
    Sep, 2021
    - Oct, 2024

Experience

    • Bangladesh
    • Oil and Gas
    • 1 - 100 Employee
    • Deputy Manager Operations
      • Oct 2019 - Present

      1. I have been working in BPPL, Patenga plant as Deputy Manager equivalent as a Sr. shift in charge and responsible for smooth operation of Rolls Royce Engine & 3 MW steam turbine. I have also supervision in Steam turbine Feed water pump, Ejector water pump, Low pressure circulating pump, cooling water circulating pump, Cooling tower fan, Condense pump. There are 8 no’s EGB, Deaerator tank, 4 no’s HP drum,1 no’s LP drum ,16 no’s soot blower fan etc.BPPL has 4 no’s FGD which operate by 8 no’s boiler. There are 1 no’s LFO & HFO fired auxiliary boiler which supply LP steam in FTP & Engine heat recovery unite. Show less

    • Assistant Manager (operation & Maintenance )
      • Jul 2017 - Sep 2019

      1. I have been working in Rolls Royce marine reciprocating engine. Erectioning and commissioning experience of 150 MW of HFO base power plant. 2.I have been Participated 10 K hours maintenance of Rolls-Royce HFO engine with top over hauling . 3. I have done 1K , 2K hrs Schedule Maintenance of Rolls Royce HFO engine. 4. Lube oil consumption calculated & analysis oil parameter. . 5. I have done in crankshaft disassemble and assemble maintenance work of Rolls-Royce HFO engine 6. I have done & Supervise 10k hrs,15 k hrs, 20k, 30K hrs maintenance . 7. Troubleshooting and maintenance of Rolls Royce HFO engine. 8. preparing spare parts list & tools inventory.. 9. I have done all types of preventive, predictive, periodic maintenance work associated with power plant. 10. To ensure all the safety equipment are in operational condition and properly maintained 11. Hands on Generate System Reports (Daily, Weekly, Monthly, Commentary, Outages, Availability, Plant Performance Indicator, Gen-sets Performance, Customer Satisfaction Assessment, Quality Management Corrective & Preventive etc), Operation/Maintenance/Trouble shooting, 12..Maintenance and Troubleshooting, Participation of strategic planning, Prepare, follow-up and monitor the System/ Shut-down of the equipment and annual work – Plan, 13.Providing technical inputs in generation operation planning, situation analysis, Program design, Economic load management, co-ordination with generation stations, Data monitoring & interchanging scheduling Planned / Unplanned/ breakdown maintenance and for ending labor and providing basic education to working people for Installation, Operation & Maintenance of Mechanical and Instrumentation Control System. Safety regulation of the Power System. 14.Store Inventory, Procurement, Planning, Budgeting, Financial Management and Co-ordination in Multinational & National Companies. Preparing and submitting the annual budget to proper authorities. Show less

    • Senior Engineer (operation & Maintenance)
      • Aug 2013 - Jun 2017
    • Manager ( Deputy Plant Manager) O & M
      • Apr 2012 - Aug 2013

      1. Maintain the plant according to company policies and procedures. Also take care of Operation & Maintenance team of HFO fired 11 MW Power Plant which has 3 generating units each 3.67 MW of Diahatsu Engine, japan. Supervision & monitoring of operation & maintenance (service & trouble shooting) work of HFO fired Diahatsu Engine (Germany), HFO & Lube Oil Separator (Alfa Laval, India), Water Treatment Plant (WTP) & Air Compressor (ELGI) & Overhead Cranes (Rockwell,India ).Co-ordination & Taking feedback from engineers (O&M) & others 2. Operation works planning and execution. Also check log sheet, control system, visually inspection all over the plant for smooth plant operation. 3.Successfully completed Erection, Commissioning & Instillation work of HFO Engine, Model: 8DK-36, Capacity 3.670 MW per Engine. , Diahatsu Diesel MFG. Co. Ltd, Japan ,11/0.415 KV of 3*3000 KVA, 4*1000 KVA, 2*750 KVA Substations, WTP, FTP, TTH & Air Compressor . 4.Planning the schedule maintenance (daily, Weekly,monthly and yearly) & unschedule maintenance. Also lead the maintenance team and assign daily task to under supervised engineers/technicians. Preparation of technical evaluation, design, review drawings, load calculation & outage of Power Plant. 5.Co-ordination with BPC (Padma,Meghna & Jamuna) for fuel (HFO & HSD) supply purpose. Also maintain Fuel received, consumptions & stock report. 6.Planning & inventory of spares, tools & consumable items. Also Co-ordination with national & international company for purchase & supply of spares, tools & consumable items. Preparing and submitting the annual budget to proper authorities. 7 . Troubleshooting and maintenance of HSD & HFO engine. Show less

    • Senior Engineer (Power ,oil & gas)
      • Feb 2011 - Apr 2012

      1.QPSL,Noapara 105 MW CCPP Power plant has 13 generating units: 2 number of CCM sulzer 18PC2/6 8 MW, 5 number of Nigata Pielstick 18PC2/6 9.9 MW, 6 number of NKK Pielstick 16PC2/6 9.2 MW Diesel fired engines and 2 number of 6 MW low pressure steam turbines . 2.During this period , I have been working in QPSL, Noapara site from this plant with Chinese Specialist Team & also strongly recommended by them .I have been working in heavy lifting, engine installation,i.e. head removal, valve and seat grinding, injector pump installation , piston and liner overhauling, engine auxiliary installation, pipeline installation, pressure testing of pipelines, Air starting system etc. 3. Promptly inform control room about abnormal change in operating conditions/parameters and take corrective action as instructed. 4.Successfully completed Erection, Commissioning & Instillation work of HSD & HFO Engine, 5. Co-ordination with BPC (Padma,Meghna & Jamuna) for fuel (HFO & HSD) supply purpose. Also maintain Fuel received, consumptions & stock report. 6.Planning & inventory of spares, tools & consumable items. Also Co-ordination with national & international company for purchase & supply of spares, tools & consumable items. Preparing and submitting the annual budget to proper authorities. 7. Troubleshooting and maintenance of HSD & HFO engine. Planning for all types of preventive, predictive, periodic maintenance work associated with power plant. Show less

    • Plant Engineer (Power,oil & gas)
      • Dec 2007 - Jan 2011

      1.Participate 30K hours maintenance of Rolls-Royce gas engine with Major over hauling. 2.I have done 1K , 2K hrs Schedule Maintenance of Rolls Royce gas engine. 3. Lube oil consumption calculated & analysis oil parameter. 4. Prepared breakdown & maintenance report. 5. SCADA /DCS supervision and parameter analysis. 6.Compressor Schedule & unscheduled maintenance 7. Diesel generator schedule & unscheduled maintenance. 8. Making & planning schedule maintenance, pending punch list. 9. To check Panel board, Switchgear room for any abnormalities. Diesel generator (400KVA Capacity). 10.To fill up engine data (Start, Stop, Trip and Plant Trip) form, BOP (balance of Plant) in every week, tripping report, trouble shooting report. Show less

    • Cadet Engineer (O& M)
      • May 2007 - Nov 2007

      1.Operation and maintenance of diesel Engine. 2.Every hour take log reading. 3.Trouble shooting 1.Operation and maintenance of diesel Engine. 2.Every hour take log reading. 3.Trouble shooting

Education

  • Marine Fisheries Academy, Chittagong, Bangladesh
    Bachelor of Engineering - BE, Mechanical Engineering
    2004 - 2008
  • Victoria University of Bangladesh
    Master's degree (MBA), Project Management
    2009 - 2011

Community

You need to have a working account to view this content. Click here to join now