Engr. Lukmon Gbadamosi. COREN, MNSE, MNIEEE, MSc

Managing Director, MEP Design | Building Services | MEP Training at DesignGoal Engineering Limited
  • Claim this Profile
Online Presence
Contact Information
Location
NG

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Revit 2021: Essential Training for MEP
    LinkedIn
    May, 2020
    - Sep, 2024
  • Revit: Fire-Alarm Systems Design
    LinkedIn
    May, 2020
    - Sep, 2024
  • COREN
    Council for the Regulation of Engineering in Nigeria
    Jun, 2015
    - Sep, 2024
  • MNSE
    Nigeria Society of Engineers
    Jul, 2014
    - Sep, 2024
  • MNIEEE
    NIgeria Institute of Electrical Electronics Engineering
    Jun, 2014
    - Sep, 2024

Experience

    • Managing Director, MEP Design | Building Services | MEP Training
      • Aug 2018 - Present

      As a result of our Mechanical, Electrical and Plumbing (MEP) designs and installation, architects and clients have delightful and zero-worries building experiences, they appreciate for years to come. This is the unique solving proposition that instigated Design Goal Engineering (DGE) Ltd in 2012. To fuel this commitment in DGE is our competency development programs which get fresh mechanical and electrical engineering graduates empowered, and inspired with confidence that exhibits the pride of professionalism.

    • Senior Project Manager, MEP Design | Building Services | MEP Training
      • Mar 2014 - Aug 2018

      • Leads the Electrical and Mechanical Projects team in developing designs; determining specifications; selecting contractors; establishing installation schedules; integrating requirements with architectural and mechanical designs; verifying code requirements; updating cost estimates and budget allocation. • Accomplishes Electrical and Mechanical Engineering human resource objectives by recruiting, selecting, orientating, training, assigning, scheduling, coaching, counseling, and disciplining employees; communicating job expectations; planning, monitoring, appraising, and reviewing job contributions; planning and reviewing compensation actions; enforcing policies and procedures. • With expertise in areas of Electrical and Mechanical Consulting and Construction, I make strategic decisions and provide the necessary leadership and direction for my teams of project managers to implement. Directing multi-discipline teams and ensuring that each time-bound stage of a project is delivered effectively, on time and to budget, while staying abreast of relevant industry developments and technology advancements.

    • Project Manager, MEP Design | Building Services
      • Jan 2010 - Feb 2014

      • Led the designing, supervision and management of Electrical and Mechanical Engineering services projects. Communicated the design recommendations to clients, project team, construction contractors and vendors using presentations in meetings. Also, preparation of bill of engineering measurement and evaluation, appraisal of contractors’ bids and advice.• Led project with other technical staff, assuring that the work is accurate and coordinated and that the quality assurance measures have been followed to provide timely services that meet the needs of the clients and the overall project schedule requirements. • On this role, I executed complex building electrical systems including primary and secondary power distribution systems, lighting and lighting controls, communication and alarm systems, grounding and lightning protection systems; designed those systems, and ensure quality implementation in line with clients’ needs. Projects - Completion of 52 branches of the then Intercontinental Bank across Nigeria (2007-2013); 62 different residential structures; Completed 15 M&E projects for Food Concepts Ltd Building Developments across Nigeria, 2 Rural Electrification projects and 5 University Projects (Details of projects are available on request)

    • Senior Project Engineer, MEP Design | Building Services
      • Jan 2006 - Dec 2009

      • As the senior Electrical Engineer, I was responsible for the design, development, control and maintenance of the electrical systems and components of buildings, power distribution networks and renewal energy. Worked within the construction sector on the following areas – Lighting, Power, Heating, Air Conditioning, Ventilation and Information Systems.• I was involved in projects from conception through to implementation, testing and handover. I also manage maintenance programmes and work as part of a multi-disciplinary project team, which includes engineers from other specialist areas.o Working with high and low voltage equipment o Managing power generation, transmission and distribution.o Overseeing the work of technicians and crafts peopleo Overseeing inspection and maintenance programmeso Budgetingo Managing and maintaining building services, such as lighting, heating, ventilation and lift systemso Carrying out feasibility studies for new technical developmentso Working with renewable energy sourceso Drawing up project plans, making models, prototypes and circuit diagramso Estimating timescaleso Testing installations and systemso Making sure projects meet safety regulationso Liaising with clients

    • Electrical MEP Engineer, MEP Design | Building Services
      • Apr 2003 - Dec 2005

      * Led supervision of electricians in handling all the electrical works considering the safety and quality requirements on construction projects. Provide input on the design and studied the electrical plans (usually done by electrical design engineers) and implement it in the site and did corrections to improve the design. Coordinated with other electrical engineers in the implementation of the electrical system design also with other engineers of different fields, such as civil and mechanical engineers, to make the construction job easier. Other areas include but not limited to: • Studied the drawings and executed the work by coordinating Electrical Contractors for Electrification, Execution, Erection & Commissioning. Checking the entire work as per approved drawings. • Reviewed inspection reports and records of Quality Control carried out on completed and running Project activities. • Reviewed Client’s Inspectors deliverables, analyze and resolve issues and problems emerging during the Quality Control activities. Highlighted site issues and sent to consultant/Project Manager. • Identified site additional work preparation and sent quotations. • Updating the Drawing depends on site condition • Prepared periodic work Progress Report.

Education

  • Federal University of Technology Akure
    PGD Electrical & Electronics Engineering, Engineering
    2006 - 2010
  • National Open University Nigeria (NOUN)
    Master of Science - MSc, Information Technology
    2013 - 2014
  • Yaba College of Technology Lagos
    HND, Electrical and Electronics Engineering
    1997 - 2002

Community

You need to have a working account to view this content. Click here to join now