Engr Khubaib
Assistant Manager ITS & Electrical at National Highway Authority- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
National Highway Authority
-
Pakistan
-
Government Administration
-
300 - 400 Employee
-
Assistant Manager ITS & Electrical
-
Dec 2022 - Present
-
-
-
SMEC
-
Australia
-
Engineering Services
-
700 & Above Employee
-
ITS Engineer (O&M)
-
Aug 2020 - Dec 2022
I has worked in SMEC International Pyt as an Electrical/ITS(Intelligence Transportation System) Engineer. Basically this is an Australian Consulting Company in Pakistan. This Company have so many projects in Pakistan and in my project this company work with National Highway Authority (NHA) as a Consultant. This Project is the part of China Pakistan Economic Corridor (CPEC). Sukkur Multan Motorway (392 KM) part of Peshawar Karachi Motorway (PKM) Project cost $ 2.92 Billion US Dollars. My duties at this project is as an Junior Electrical Engineer. I'm seeing the 22 Toll Plaza, 22 Interchanges, 12 Service Areas, 10 Rest Areas, 22 Weigh Stations and Road Lighting with International Experts. My scope of work is that load calculations of all buildings, Testing of Electrical Equipment, Review the Construction Drawings, Single Line Diagram (SLD), HV & LV Connections, Report Writing, Monitoring ITS- Intelligent Transport System (ITS) (CCTV,AID,WIM,SWIM,SSWIM,Et... etc) Consulting and procurement i.e Optical fiber laying, OTDR testing, Splicing, ANPR camera,Loop Vehicle detector, HT & LV Cables, Panels, Generators, Road Lights (LED) etc Show less
-
-
-
FiberHome
-
China
-
Telecommunications
-
700 & Above Employee
-
Project Specialist
-
Apr 2019 - Aug 2020
-
-
-
SMEC
-
Australia
-
Engineering Services
-
700 & Above Employee
-
Electrical Engineer
-
Nov 2016 - Apr 2019
I has worked in SMEC International Pyt as an Electrical Engineer. Basically this is an Australian Consulting Company in Pakistan. This Company have so many projects in Pakistan and in my project this company work with National Highway Authority (NHA) as a Consultant. This Project is the part of China Pakistan Economic Corridor (CPEC). Sukkur Multan Motorway (392 KM) part of Peshawar Karachi Motorway (PKM) Project cost $ 2.92 Billion US Dollars. My duties at this project is as an Junior Electrical Engineer. I'm seeing the 22 Toll Plaza, 22 Interchanges, 12 Service Areas, 10 Rest Areas, 22 Weigh Stations and Road Lighting with International Experts. My scope of work is that load calculations of all buildings, Testing of Electrical Equipment, Review the Construction Drawings, Single Line Diagram (SLD), HV & LV Connections, Report Writing, Monitoring ITS- Intelligent Transport System (ITS) (CCTV,AID,WIM,SWIM,SSWIM,Et... etc) Consulting and procurement i.e Optical fiber laying, OTDR testing, Splicing, ANPR camera,Loop Vehicle detector, HT & LV Cables, Panels, Generators, Road Lights (LED) etc Show less
-
-
Education
-
Institute of Southern Punjab Multan
Master's degree, Electrical Power -
Bahauddin Zakariya University
Bachelor's degree, Electrical (Power) Engineering