Engr. Christian Nwokocha
Piping/ Test Pack Engineer at China National Chemical Engineering Company Pvt. Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
ASNT NDT Level 2 Magnetic particle Testing
Gennesaret Resources Nigeria Limited (GRNL)Mar, 2019- Oct, 2024 -
ASNT NDT Level II Certification - Liquid Penetrant Testing (PT) (ASNT-NDT2-PT)
Gennesaret Resources Nigeria Limited (GRNL)Mar, 2019- Oct, 2024 -
ASNT NDT Level II Certification - Visual Testing (ASNT-NDT2-VT)
Gennesaret Resources Nigeria Limited (GRNL)Mar, 2019- Oct, 2024 -
ASNT NDT Level II Certification - Ultrasonic Testing (ASNT-NDT2-UT)
Gennesaret Resources Nigeria Limited (GRNL)Feb, 2019- Oct, 2024 -
ASNT NDT Level III Certification - Radiographic Testing (ASNT-NDT3-RT)
Gennesaret Resources Nigeria Limited (GRNL)Feb, 2019- Oct, 2024
Experience
-
China National Chemical Engineering Company Pvt. Ltd.
-
Construction
-
1 - 100 Employee
-
Piping/ Test Pack Engineer
-
Oct 2021 - Present
-
-
-
Prowers Medical Center
-
United States
-
Hospitals and Health Care
-
1 - 100 Employee
-
Human Resources Consultant
-
Aug 2021 - Present
-
-
-
Indoafro Engineering & Construction Ltd
-
Nigeria
-
Oil and Gas
-
1 - 100 Employee
-
Piping Engineer
-
Jan 2020 - Present
-
-
-
China National Chemical Engineering Company Pvt. Ltd.
-
Construction
-
1 - 100 Employee
-
QA/QC
-
May 2019 - Apr 2020
Check welding procedure. Review applicable document package Develop inspection plan. Check sequencing of individual weld pass. Check interpass temperature. Check quality of individual weld pass. Check fit up and pipe orientation Check welding procedure. Review applicable document package Develop inspection plan. Check sequencing of individual weld pass. Check interpass temperature. Check quality of individual weld pass. Check fit up and pipe orientation
-
-
-
ONSHORE CONSTRUCTION COMPANY PRIVATE LIMITED
-
India
-
Construction
-
400 - 500 Employee
-
Piping Engineer
-
Oct 2015 - Dec 2018
Spool tracking, checking of spool number, piece number and heat number. Supervise the fabrication of underground piping of a fertilizer plant. Installation of above ground piping ( AG) in a fertizer plant. Identify and segregate the different types of materials according to specifications. Ensure that fittings and erection materials are according to design specifications and as per isometric drawing. Record all inch DIA and inch metre of all fabrication and erection done. Spool tracking, checking of spool number, piece number and heat number. Supervise the fabrication of underground piping of a fertilizer plant. Installation of above ground piping ( AG) in a fertizer plant. Identify and segregate the different types of materials according to specifications. Ensure that fittings and erection materials are according to design specifications and as per isometric drawing. Record all inch DIA and inch metre of all fabrication and erection done.
-
-
-
Saipem
-
Italy
-
Engineering Services
-
700 & Above Employee
-
QA/ QC Commissioning Lead
-
Sep 2011 - Mar 2015
Ensure that control valves, relief valves, rupture disks, orifice plates, diaphragm instruments and expansion joints are as indicated on the pressure test flow diagram. Ensuring that manifold, pressure hoses pressure gauges and pumps are installed according to design specifications. Calculate safe distance according to test bar pressure, and ensure that safe distance are kept during hydro test. Ensure that test blinds are installed and in correct thickness. Reinstatement of pipes spools, flanges and valves. Show less
-
-
Education
-
Federal University of Technology Owerri
Bachelor of Engineering - BE, Mechanical Engineering