Engr. Abbas Raza khan

Electrical Design Engineer at MEP Solutions Pvt. Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Construction
    • 100 - 200 Employee
    • Electrical Design Engineer
      • Oct 2016 - Present

      Providing Design Services of Utilities including IT, Telecom Street lighting & (LV & MV) Power Distribution) for one of the ongoing project. Assisting and leading CAD team in finalizing Drawings for all Electrical Utilities and further providing Voltage Drop calculation Cable Route, Cable Sizing, Bill of Quantities and Engineering estimate to the client. Projects:  - PEPSICO MULTAN.  - PARK LANE TOWER ISLAMABAD.  - ECOLEAN LAHORE.  - ADAM JEE LAHORE.  - D.R.C Lahore.  - IZHAR Steel Lahore.  - INDUS Hospital Lahore.  - KIA Motors Karachi.  - COCA COLA Base Plant Limited Lahore.  - INTERLOOP Lahore • PEL Unit II Extension Lahore: Responsibilities includes design services for Lighting and & ELV system for PEL. Further Responsibilities includes answering ELV Queries in response to Design Services • LOTTEE Factory Lahore: Part of team providing complete comprehensive Report on options of converting Existing Overhead Power.Transmission Network comprising of 11KV/MV & Genset backup line into underground Power Distribution Network. Scope of work further includes design of a centralized Power House with Genset Backup,Execution Plan, procedure of dismantling overhead system along with provision of Green Energy. • HAMEED LATIF Hospital Lahore: Responsible for Preparation of Design basis report Load Calculation along with Voltage Drop, Earthling and Lighting Protection Calculation .Plays a keen role in designing lighting power distribution, Cable Route, CCTV, Fire Alarm, Voice Evacuation System, Data & UPS Backup. Services for the Hamid Latif hospital.Preparing Bill of Quantities, Engineering Estimates & Top supervisor of the Electrical Works at site along with supervising the CAD Team in finalizing the Drawings.

    • Transportation/Trucking/Railroad
    • 500 - 600 Employee
    • Internship
      • Aug 2015 - Sep 2015

    • Pakistan
    • Executive Offices
    • 300 - 400 Employee
    • Summer Internship
      • Jun 2015 - Aug 2015

    • Switzerland
    • Food and Beverage Services
    • 700 & Above Employee
    • Internship Trainee
      • Jul 2014 - Sep 2014

Education

  • University of South Asia
    Electrical engineer(Power), Electrical and Electronics Engineering
    2012 - 2016
  • Pakistan Engineering Council
    Certified Engineer
  • Forman Christian College (A Chartered University)
    Fsc Pre Engineering
    2010 - 2012
  • APS Mehfooz Shaheed Garrison Lahore Cantt
    Matriculation
    2009 - 2010

Community

You need to have a working account to view this content. Click here to join now