Petar P.

Technical Manager at Andersson&Sjöblom Technical Management Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
RS
Languages
  • Serbian Native or bilingual proficiency
  • English Full professional proficiency
  • Spanish Full professional proficiency
  • German Elementary proficiency
  • Russian Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Sweden
    • Construction
    • 1 - 100 Employee
    • Technical Manager
      • Feb 2018 - Present

      - Building Construction Management. - Construction of residential buildings. - Construction of infrastructure facilities. - Building Construction Management. - Construction of residential buildings. - Construction of infrastructure facilities.

  • Freelancer
    • Nis, Serbia
    • Structural Engineer
      • Jan 2015 - Jan 2018

      Building design, modelling, static calculations, drawing formwork and reinforcement details. Building design, modelling, static calculations, drawing formwork and reinforcement details.

  • Dinarik Sr d.o.o.
    • Pirot, Grdelica
    • Project Engineer
      • 2013 - 2015

      I was responsible for organization and coordination of contractors and staff on sites in order to realize the dynamics of labor, maintaining regular meetings and informing the supervisory authority through daily, weekly and monthly reports on progress of labor dynamics, including defense of all reports relevant to the business site. Establishing master schedule basis for overall time management and control of the individual projects, preparing individual project schedules for land side construction, based on the master schedule. I was responsible for preparation of method statements for all operations, daily reports of the engaged resources, daily and weekly programs of works, requests for Inspection. I was responsible for the quality control of works. Show less

    • Site Engineer
      • 2012 - 2013

      I was responsible for organization and coordination of contractors and staff on site in order to realize the dynamics of labor, maintaining regular meetings and informing the supervisory authority through daily, weekly and monthly reports on progress of labor dynamics, including defense of all reports relevant to the business site. I was responsible for the quality of works. I was responsible for organization and coordination of contractors and staff on site in order to realize the dynamics of labor, maintaining regular meetings and informing the supervisory authority through daily, weekly and monthly reports on progress of labor dynamics, including defense of all reports relevant to the business site. I was responsible for the quality of works.

    • Structural Engineer
      • 2008 - 2009

      Building design, modeling, static calculations, drawing formwork and reinforcement details. Building design, modeling, static calculations, drawing formwork and reinforcement details.

    • Site Manager
      • 2005 - 2006

      Monitor progress, oversee delivery of materials and carry out safety checks and sort out various problems. Monitor progress, oversee delivery of materials and carry out safety checks and sort out various problems.

    • Civil Engineering
    • 1 - 100 Employee
    • Trainee, Site Engineer
      • 2005 - 2006

      I was a team member for project documentation with main responsibilities such as drawing AutoCAD plans, daily, weekly and monthly reports on progress of labor dynamics, including defense of all reports relevant to the business site, preparing individual project schedules for tunnels, based on the master schedule. I was head of Sector excavation and support units for the tunnels number 6, 7 and 8. I was a team member for project documentation with main responsibilities such as drawing AutoCAD plans, daily, weekly and monthly reports on progress of labor dynamics, including defense of all reports relevant to the business site, preparing individual project schedules for tunnels, based on the master schedule. I was head of Sector excavation and support units for the tunnels number 6, 7 and 8.

Education

  • University of Nis
    M.Sc., Civil Engineering/Construction
    1996 - 2004
  • University of Nis
    Master of Science (M.Sc.), Structural Engineering
    1996 - 2004

Community

You need to have a working account to view this content. Click here to join now