Engi. Sumon Biswas

Construction Manager at Basic Engineers
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bangladesh, BD
Languages
  • English -
  • Bangali -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Construction Manager
      • Apr 2013 - Present

      Bibiyana Extension Gas Plant: Contractor : Foster Wheeler, Thailand & Basic Engineering Ltd, Bangladesh. Consultant: Foster Wheeler, Thailand Client : Chevron Bangladesh Ltd. Worth : 500 Million USD. The new project will include expansion of the Gas plant to process increased natural gas volumes from the Bibiyana Field, additional development wells, and an enhanced gas liquids recovery unit. The project is estimated to cost approximately $500 million and is expected to boost Chevron’s total natural gas production capacity in Bangladesh by more than 300 cubic feet per day to 1.4 billion cubic feet per day, and 4000 barrels per day of natural gas liquids. First production expected in 2014. 1. Practical Supervision of Construction work at Site and giving instructions to the Site representatives to achieve targeted progress in Work 2) Study the drawing and solve technical problem.3) Direct involve in Estimating, Supervision of foundation & Retaining wall, Dyke works, underground works including fire water pipe (HDPE Pipe),Oily water pipe (CPVC Pipe),R.C.C pipe, duck bank, cable trench, Manhole & catch basin, Road works and Building Construction with pilling. . 4). Co-operating the EPCM Contractor, dealing with Clients and Management of Basic Engineering Ltd. Show less

    • Australia
    • Public Safety
    • 1 - 100 Employee
    • Construction Manager
      • Apr 2013 - Present

      Bibiyana Extension Gas Plant: Contractor : Foster Wheeler, Thailand & Basic Engineering Ltd, Bangladesh. Consultant: Foster Wheeler, Thailand Client : Chevron Bangladesh Ltd. Worth : 500 Million USD. 1. Practical Supervision of Construction work at Site and giving instructions to the Site representatives to achieve targeted progress in Work 2) Study the drawing and solve technical problem.3) Direct involve in Estimating, Supervision of foundation & Retaining wall, Dyke works, underground works including fire water pipe (HDPE Pipe),Oily water pipe (CPVC Pipe),R.C.C pipe, duck bank, cable trench, Manhole & catch basin, Road works and Building Construction with pilling. . 4). Co-operating the EPCM Contractor, dealing with Clients and Management of Basic Engineering Ltd. Show less

Education

  • Khulna University of Engineering and Technology
    Bachelor's degree, Civil Engineering
    2004 - 2007
  • Sreepur Degree Collage
    HSC, Sciences
    2000 - 2002
  • Sreepur M.C. Pilot High School
    SSC, Science
    1996 - 1998

Community

You need to have a working account to view this content. Click here to join now