Eng Opera Isu

MD/CEO at Endlex Properties & Development Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Nigeria, NG
Languages
  • American English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Nigeria
    • Real Estate
    • 1 - 100 Employee
    • MD/CEO
      • Jan 2020 - Present

      Real Estate, Property Development & Management, sales of Land, Houses, Real Estate Training, Designs, Building and Transfer Real Estate, Property Development & Management, sales of Land, Houses, Real Estate Training, Designs, Building and Transfer

  • Morpol Engineering Nig Ltd
    • Eleme Petrochemical
    • Construction Superintendent
      • Oct 2014 - Present

      • Coordinate and Supervise Vessels, Tanks, Piping and structural construction works, Erections and installation activities. • Coordinate and monitor fabrication works and ensuring that is fabricated according to approved construction drawings, project specifications and standard. • Carry out preliminary, basic and detailed piping engineering studies and produce associated deliverables-MTOs, Valve datasheets, PFDs, P&IDs, Isometrics, Piping Plans etc • Prepare resource forecasts for specific engineering tasks and ensuring that forecasts are in accordance with project commitments and plans • Ensuring that “PERMIT TO WORK” System Methodology is followed (PTW). • Running of 18’’ Pipeline from NAOC Flow station OB/OB to Eleme Petrochemical Plant • Construction of Gas Metering Station (Pig Receiver End) • Review all Constructions Drawings from Client and recommend if necessary • Designs Modifications • Procurement of materials and services to suit project specifications • To review Site Queries prior to submission to Client • Act as the primary interface on a Project Team for Client and Suppliers / Subcontractor Engineers relating to allocated package of engineering tasks • Implement and Audit all Health, Safety, Environment and Quality Requirements for the work • Coordinate and Manage Sub-contractors’ Activities • Liaise with Construction Operations personnel on a daily basis to identify and coordinate site interface issues • Review / prepare Lift Plans in compliance with Lifting Operations procedure • Core commitment to coordinate and maintain quality control of all engineering works • Identify all risks associate with the allocated package of engineering tasks. • Liaison with and provision of an Engineering Service to the Estimating, Fabrication and Construction Division/Departments • To develop schedules within overall plan • Co ordinate the Installations of Boilers, Slug Catcher, Air Coolers, Stabilizers Towers, Metering Skid, Pig Recei Show less

  • Alcon
    • OKOLOMA AFAM F5 GAS PROJECT PLANT
    • Mechanical Engineer
      • Oct 2013 - Present

      •Prepare and monitor detailed resource plans and schedules •Establish detailed procedures for work execution •Coordinate and Supervise overall construction and installation activities at the various work sites • Determine, in conclusion with The Project Manager, Work Packaging and Methodology •Manage Sub-contractors’ Activities •Report all aspects of site progress, site issues and incidents to The Project Manager • Interpret Isometrics, PFDs and P & IDs •Implement and Audit all Health, Safety, Environment and Quality Requirements for the work •Analyze engineering variation in the scope of work not covered by the contract and assess the relevant costs and implications. •Liaise with Construction Operations personnel on a daily basis to identify and coordinate site interface issues • Interpret Isometrics, PFDs and P & IDs etc Show less

    • Construction Superintendent

    • QC/QA,PRE-COMMISSONING ENGINEER MECHANICAL
      • Jun 2007 - Aug 2023

      • Checking of set points action of alarm & shutdown devices. • Electrical & instrumentation loop checks have been executed • Pressure test have been successfully completed • Asset management system (AMS) configuration confirmed • Factory & site Acceptance (FAT’S &SAT’s) have been completed • Function testing of control loops is completed. • All items on the punch lists are cleared. • Cause & effects have been checked & tested • Project Drawings are as built & correct. • Stroking of control & shutdown valves • Verifying that all other checks (functional or otherwise) have been carried – out in accordance with the main contract. COMMISSIONING Carry out commissioning activities in accordance with the project commissioning manual & operational manual after successful completion of pre-commissioning activities. Show less

    • Pre- Commissioning/QA/QC Engineer
      • Dec 2011 - May 2013

      • Establish detailed procedures for work execution • Coordinate and Supervise overall construction and installation activities at the various work sites • Prepare and monitor detailed resource plans and schedules • Make requisitions, allocates and maintains resources • Interpret Isometrics, PFDs and P & IDs • Determine, in conclusion with The Project Manager, Work Packaging and Methodology • Implement and Audit all Health, Safety, Environment and Quality Requirements for the work • Manage Sub-contractors’ Activities • Liaise with Construction Operations personnel on a daily basis to identify and coordinate site interface issues • Ensure all Quantities for completed works are verified and recorded • Report all aspects of site progress, site issues and incidents to The Project Manager • Manage daily site industrial relations • Analyze engineering variation in the scope of work not covered by the contract and assess the relevant costs and implications. Overview: Pre – commissioning will be considered as completed once the pre-commissioning activities have been performed & pre-commissioning documentation confirms that: • Checking of set points action of alarm & shutdown devices. • Electrical & instrumentation loop checks have been executed • Pressure test have been successfully completed • Asset management system (AMS) configuration confirmed • Factory & site Acceptance (FAT’S &SAT’s) have been completed • Function testing of control loops is completed. • All items on the punch lists are cleared. • Cause & effects have been checked & tested • Project Drawings are as built & correct. • Stroking of control & shutdown valves • Verifying that all other checks (functional or otherwise) have been carried – out in accordance with the main contract. COMMISSIONING Carry out commissioning activities in accordance with the project commissioning manual & operational manual after successful completion of pre-commissioning activities. Show less

    • : PIPING ENGINEER / PRE-COMMISSIONING ENGINEER
      • Dec 2011 - May 2013

      Duties include to : • Establish detailed procedures for work execution • Coordinate and Supervise overall construction and installation activities at the various work sites • Prepare and monitor detailed resource plans and schedules • Make requisitions, allocates and maintains resources • Interpret Isometrics, PFDs and P & IDs • Determine, in conclusion with The Project Manager, Work Packaging and Methodology • Implement and Audit all Health, Safety, Environment and Quality Requirements for the work • Manage Sub-contractors’ Activities • Liaise with Construction Operations personnel on a daily basis to identify and coordinate site interface issues • Ensure all Quantities for completed works are verified and recorded • Report all aspects of site progress, site issues and incidents to The Project Manager • Manage daily site industrial relations • Analyze engineering variation in the scope of work not covered by the contract and assess the relevant costs and implications. Overview: Pre – commissioning will be considered as completed once the pre-commissioning activities have been performed & pre-commissioning documentation confirms that: • Checking of set points action of alarm & shutdown devices. • Electrical & instrumentation loop checks have been executed • Pressure test have been successfully completed • Asset management system (AMS) configuration confirmed • Factory & site Acceptance (FAT’S &SAT’s) have been completed • Function testing of control loops is completed. • All items on the punch lists are cleared. • Cause & effects have been checked & tested • Project Drawings are as built & correct. • Stroking of control & shutdown valves • Verifying that all other checks (functional or otherwise) have been carried – out in accordance with the main contract. COMMISSIONING Carry out commissioning activities in accordance with the project commissioning manual & operational manual after successful completion of pre-commissioning activities. Show less

    • computer engineer
      • Jul 2008 - Feb 2013

      General Computer maintenance,Software/Hardware configuration,System Analyst, Networking, Data mining, Computer security etc General Computer maintenance,Software/Hardware configuration,System Analyst, Networking, Data mining, Computer security etc

    • Mechanical QA/QC Engineer
      • Oct 2008 - Mar 2010

      • Monitor work in progress in order to ensure that the procedures implemented And materials utilized conform to the contract documents and applicable codes.• Pre- flushing: clean test section prior to hydro testing. Coordinate blowing down and flushing the system to ensure all trash and foreign objects are removed from the system to be tested.• Inspect pressurization/depressurization in steps in accordance with procedure.• Co-ordinates materials/manpower of hydro test activities to achieve the entire hydro test/leak test process.• Inspection of piping fabrication/ Installation in readiness to pipe testing.• Split/co-ordinate the preparation of pressure/Hydro test packs as per company technical specification/requirements.• Inspect re-instatement of hydro tested section.• Determine test pressure & limits with respect to reference drawing/standard spec-breaking requirement.• Installation of high point vent & low points drain, spade/blind flanges or spectacles’ blinds as per company technical requirements.• Coordinates preservation activities: final blowing/drying & purging.• Test section/system isolation.• Sign off various check sheets with respect to project inspection & test plan.• Inspect bolting/tensioning activities.• Inspection of Static/Rotating Equipment Installation. Show less

    • Mechanical QA/QC Engineer
      • Oct 2008 - Mar 2010

      • Monitor work in progress in order to ensure that the procedures implemented And materials utilized conform to the contract documents and applicable codes.• Pre- flushing: clean test section prior to hydro testing. Coordinate blowing down and flushing the system to ensure all trash and foreign objects are removed from the system to be tested.• Inspect pressurization/depressurization in steps in accordance with procedure.• Co-ordinates materials/manpower of hydro test activities to achieve the entire hydro test/leak test process.• Inspection of piping fabrication/ Installation in readiness to pipe testing.• Split/co-ordinate the preparation of pressure/Hydro test packs as per company technical specification/requirements.• Inspect re-instatement of hydro tested section.• Determine test pressure & limits with respect to reference drawing/standard spec-breaking requirement.• Installation of high point vent & low points drain, spade/blind flanges or spectacles’ blinds as per company technical requirements.• Coordinates preservation activities: final blowing/drying & purging.• Test section/system isolation.• Sign off various check sheets with respect to project inspection & test plan.• Inspect bolting/tensioning activities.• Inspection of Static/Rotating Equipment Installation. Show less

Education

  • VALENCE TECH. SERVICES (RC: 754323)
    CERTIFICATION, • Process Piping Design & Engineering PER ASME B31.3.
    2012 - 2012
  • PAN-AFRICAN UNIVERSITY
    DIPLOMA, Entrepreneurship/Entrepreneurial Studies
    2011 - 2011
  • FUTO & FEDERAL POLYTECHNIC NEKEDE
    Bachelor of Technology (B.Tech.), Computer Science & Mech. Eng.

Community

You need to have a working account to view this content. Click here to join now