Eng.Bader Alrasheedi

Mechanical Maintenance Supervisor at Qassim Cement company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Al-Qassim Region, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Occupational Safety and Health Professional
    Ministry of Human Resources and Social Development - KSA
    Aug, 2021
    - Nov, 2024
  • Planning& Organizing Skills
    MEIRC Saudi Arabia Co.
    Jan, 2021
    - Nov, 2024
  • Problem Solving in the Workplace
    Doroob دروب
    May, 2020
    - Nov, 2024
  • Communication skills
    MEIRC Saudi Arabia Co.
    Aug, 2019
    - Nov, 2024
  • OSHA
    International Academy for Training
    Jul, 2019
    - Nov, 2024
  • BEARINGS TYPES AND MAINTENANCE
    MEIRC Saudi Arabia Co.
    Apr, 2018
    - Nov, 2024
  • Loesche Mill Technical Seminar
    Loesche GmbH
    May, 2016
    - Nov, 2024
  • Energy Efficiency System
    Saudi Energy Efficiency Center
    Feb, 2016
    - Nov, 2024
  • Customer Service Skills
    BTS
    Oct, 2015
    - Nov, 2024
  • English Course Advance Level, Adelaide University, Australia
    University of Adelaide
    Aug, 2009
    - Nov, 2024
  • Siminar
    KettenWulf
    Sep, 2022
    - Nov, 2024

Experience

    • Building Materials
    • 200 - 300 Employee
    • Mechanical Maintenance Supervisor
      • Mar 2015 - Present

      Crushers Mechanical Supervisor& Utilities supervisor [compressors&blowers and hydraulic team]Key Responsibilities•Supervision &follow up all teams ( crusher team, compressors team and hydraulic team)•Planning and undertaking scheduled maintenance day-to-day mechanical Preventative Maintenance(PM): normal / shutdowns/breakdowns activities that include maintenance& technical support execution.•Performance monitoring procedures and key performance indicators (KPIs).•Managing the teamwork to work efficiently.•implementing Safety Job Analysis and safety work permit.•Assuring that the work is carried out safely.•Optimising to minimise consumable materials usage. •Minimzing machines down time.•Following up with spare parts &procurement Dept. to assure that the correct and most efficient spares are procured correctly.•Following up with external services& engineering projects.•Reporting to mechanical maintenance superintendent &maintenance manager.•7Days /24 hours Communicating with Operation&Production Dept. for any trouble shooting and machineries fault solving. Show less

    • Mechanical Maintenance Engineer
      • Mar 2015 - Jun 2019

      Kiln &Raw Mill, and Cement Mill Worked in:Mills type: Ball Horizental mills, 32 Losche Vertical mill, and Atox Verical Mill 42.5.Rotary Kilns types: KHD, FLS, with cooler type: GRATE coolersKey Responsibilities-Rescheduling manpower for work.-Directing labours to control work to safe working procedures and systems.-implementing Safety Job Analysis and safety work permit.-Assuring that the work is carried out safely.-reporting to mechanical maintenance superintendent. Show less

    • Project Engineer
      • Oct 2016 - Jan 2018

      •Projects:Spare parts Project!I was involved in specification and item review project for spare part in Qassim Cement Co. WareHouse from year 2017 to 2018.-Spare parts primary description correction in system+Inventory optimisation.•Mobile Crusher Shifting Project 2019 [Limestone ThyssenKrupp 900Tons/Hour capacity] 2.3km away.•I was Looking After mechanical issues which was affecting crusher movement. •Assuring that the work is carried out safely.•Assuring that all mechanical spare parts were ready to not disturb the trip.•Supervising and supporting technician to do the required mechanical work in old and new location, for example 2 conveyors belt have been cut to allow crusher to pass through and rejoined after mobile crusher arrived the desired position.•Dismantling of feed hopper and then fixing in a new location. Preparation of ramp for movement of Mobile Crusher.Erection of new belt conveyors at new location.•Mobile Crusher Shifting Project 2021 1.6km awayType:[Limestone ThyssenKrupp 1200Tons/Hour capacity]. With “walking hydraulic system design”.•I was Looking After Walking Hydraulic System Trouble shooting during shifting trip.•Assuring that the work is carried out safely.•Assuring that all mechanical spare parts were ready to not disturb the trip.•Supervising and supporting technician to do the required mechanical work in old and new location, for example 2 conveyors belt have been cut to allow crusher to pass through and rejoined after mobile crusher arrived the desired position.•Dismantling of feed hopper and then fixing it in a new location. .•Erection of mobile Crusher in new location Show less

    • Building Materials
    • 200 - 300 Employee
    • Cooperative Engineer
      • Dec 2012 - Feb 2013

      Proffessional practice (training ) for mechanical engineering students Proffessional practice (training ) for mechanical engineering students

Education

  • Federation University Australia
    Bachlore, Mechanical Engineering
    2011 - 2014
  • Federation University Australia
    OHS, Mechanical Engineering
    2012 - 2012
  • University of South Australia
    Diploma of Technology, Engineering &Environment
    2009 - 2011

Community

You need to have a working account to view this content. Click here to join now