Emre Aydudu

Claims Manager at Dieffenbacher Energy
  • Claim this Profile
Contact Information
Location
Hohenems, Vorarlberg, Austria, AT

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Junior Energy Manager
    TÜV AUSTRIA
    Mar, 2022
    - Sep, 2024
  • SGU-Prüfung von operativ tätigen Führungskräften
    TÜV AUSTRIA
    Mar, 2021
    - Sep, 2024

Experience

    • Austria
    • Renewable Energy Equipment Manufacturing
    • 1 - 100 Employee
    • Claims Manager
      • Jun 2023 - Present

      DIEFFENBACHER Energy GmbH, formed at the beginning of 2023 from the acquisition of the former BERTSCHenergy. I am responsible for processing and managing supplier claims, ensuring fair and timely resolutions while maintaining positive supplier relationships and complying with company policies and regulations. My role involves investigating, negotiating and documenting claims to minimise risk. DIEFFENBACHER Energy GmbH, formed at the beginning of 2023 from the acquisition of the former BERTSCHenergy. I am responsible for processing and managing supplier claims, ensuring fair and timely resolutions while maintaining positive supplier relationships and complying with company policies and regulations. My role involves investigating, negotiating and documenting claims to minimise risk.

    • Austria
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Commissioning Engineer
      • Sep 2022 - Present

      Start up, hot commissioning and test run for a biomass power plant designed to incinerate chicken manure with a fluidized bed boiler (firing capacity 95 MW) and steam turbine (34 MW) for electricity production.

    • Process Engineer
      • Jun 2022 - Sep 2022

      -Adaptation of the operating mode for dual-fuel operation, software adaptations and optimizations of the existing control loops for a boiler system with 40bar/400°C.-Conversion of an existing gas burner to gas and fuel oil operation to obtain higher flexibility of the CHP plant.

    • Austria
    • Research Services
    • 1 - 100 Employee
    • Student Research Assistant
      • Mar 2021 - Jan 2022

      Development of process and system concepts for biorefineries with a focus on combined energy and resource efficiency Development of process and system concepts for biorefineries with a focus on combined energy and resource efficiency

    • Austria
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Measurement and Control Technician
      • Apr 2019 - Mar 2021

      Inspection and maintenance of measurement and control systems in nuclear power plants Inspection and maintenance of measurement and control systems in nuclear power plants

Education

  • Montanuniversität Leoben
    Diplom-Ingenieur, Industrielle Energietechnik
    2019 - 2022
  • Montanuniversität Leoben
    Bachelor, Petroleum Engineering
    2013 - 2019
  • HTL Dornbirn
    Matura, Betriebsinformatik
    2008 - 2013

Community

You need to have a working account to view this content. Click here to join now