Emmanuel DANKI NOME
Hydro-Electromechanical Engineer at CIMA+- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Anglais Limited working proficiency
-
Français Native or bilingual proficiency
Topline Score
Bio
Experience
-
CIMA+
-
Canada
-
Engineering Services
-
700 & Above Employee
-
Hydro-Electromechanical Engineer
-
Dec 2021 - Present
In charge of the supervision of the electromechanical works for the contracting authority during the execution phase of lot 2: powerhouse and substation. Installation of 4 Kaplan type generating sets with a power of 7.5 MW each and all auxiliary systems. Total installed power of 30 MW and 90kV substation. In charge of the supervision of the electromechanical works for the contracting authority during the execution phase of lot 2: powerhouse and substation. Installation of 4 Kaplan type generating sets with a power of 7.5 MW each and all auxiliary systems. Total installed power of 30 MW and 90kV substation.
-
-
-
-
Electromechanical Engineer - Local coordinator (Local assistant project manager)
-
Oct 2020 - Dec 2021
Stabilization and Reinforcement of the Electrical Networks of the city of Douala (Boucle de Douala) - Extension of the substations of Logbaba Mangombe, Bekoko, Ngodi Bakoko 90/15 kV, Bonaberi, Deido, Koumassi and Makepe, construction of the substations of Logbessou, Ngodi Bakoko 225/90/15 kV and Sodiko, construction of approximately 112 km of 225kV lines and 41 km of 90kV lines in and around Douala
-
-
Electromechanical Engineer- Local coordinator
-
Jan 2020 - Dec 2021
Stabilization and Reinforcement of the Electrical Networks of the City of Yaoundé City(Boucle de Yaoundé) - Extension of the Oyomabang, Kodengui and Ngousso substations, construction of the Edéa substation, construction of a 225kV Edéa-Yaoundé line and 90kV lines in Yaoundé
-
-
Electromechanical Engineer
-
Jan 2020 - Dec 2021
Construction of two 225kV lines Nkongsamba-Bafoussam, Abong Mbang-Yaoundé and associated auxiliaries - 225kV single-phase lines linking the Center and the East as well as the Littoral and the West of the country plus the construction of substations
-
-
-
-
Electromechanical Engineer
-
Aug 2020 - Dec 2021
Project for the development of a cluster of hydroelectric power plants in the western region of Cameroon by Voltalia SA - cluster of hydroelectric power plants for a projected cumulative production of 80 MW
-
-
Electromechanical Engineer – Team leader
-
Apr 2020 - Feb 2021
Feasibility studies for a 400 kV line of about 200 km from Nachtigal to Bafoussam plus 90kV secondary lines with construction of new 400/225/90/30/15kV substations in Ntui, 90/30/15kV substations in Bangangté, Foumban, Bafia and Nkoteng and 225kV extensions in Nachtigal, 400kV substations in Bafoussam and 90kV extensions in Nkometou
-
-
Electromechanical Engineer
-
May 2020 - Dec 2020
Evaluation of the cost of rehabilitation of assets to be transferred to the Cameroonian government (via SONATREL) by ENEO (Energy of Cameroon) - 27 substations, 10 225kV lines, 03 110kV lines and 25 90kV lines to be inspected and evaluated
-
-
-
-
Design Engineer
-
Apr 2019 - Jan 2020
Design of the fluid packages (electricity, lighting, plumbing, air-conditioning, fire safety,...) on several projects including:- the construction project of the complex of the control laboratories of Missole - Douala (Cameroon): complex of 14 buildings having to shelter several types of laboratories as well as housing.
-
-
Electromechanical Engineer
-
Aug 2018 - Apr 2019
Nyabizan village electrification project - Supervision of the construction works of a 30kV line coming from the Memve'ele dam substation and running for about 8km connected to a low voltage line of about 1.5km for the supply of the Nyabizan locality
-
-
-
-
Field Hydro-Electromechanical Engineer
-
Jan 2016 - Apr 2019
Memve'ele hydroelectric plant - Project supervision for the dam plus the 211 MW powerhouse (4 Francis type turbines) and the substation for a 225kV line (connecting the plant to Yaoundé).
-
-
Field Hydro-Electromechanical Engineer
-
Jun 2015 - Jan 2016
Lom Pangar Hydroelectric Plant; Lot 1- Dam - Civil Engineering and Hydromechanical Equipment - Project Management of the Lom Pangar Hydroelectric Dam (6 billion m³ of water) in East Cameroon.
-
-
Education
-
Ecole Nationale Supérieure Polytechnique
Engineer's Degree, Industrial Engineering